| Date | Description | Winner | Amount |
|---|---|---|---|
| 26 Mar 2026 | Provision of Consultancy Services for Feasibility Study on Infrastructure Works for Service Connectivity at Jurong Island | T.Y.LIN INTERNATIONAL PTE. LTD. | S$432,500 |
| 25 Mar 2026 | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Sungei Kadut (Group 18) | PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | S$2,417,000 |
| 19 Mar 2026 | PROVISION OF RETAIL CONSULTANCY SERVICES PREDOMINANTLY FOR BUSINESS PARK / INDUSTRIAL B2 IN JURONG INNOVATION DISTRICT | KNIGHT FRANK PTE LTD | S$365,000 |
| 27 Feb 2026 | PROVISION OF COMPREHENSIVE MAINTENANCE FOR NON-PROPRIETARY SYSTEMS AT JI CHECKPOINT & PDL CHECKPOINT FOR PERIOD OF 2 YEARS | AEQON TJ PTE. LTD. | S$455,112 |
| 19 Feb 2026 | PROVISION OF REVERSIBLE FLOW SYSTEM (RVS) AND MAINTENANCE AT JURONG ISLAND CHECKPOINT | Unknown | S$0 |
| 11 Feb 2026 | PROVISION OF JIRA SERVICE MANAGEMENT (DATA CENTER) AND PLUGINS SUBSCRIPTION WITH MAINTENANCE FOR JTC | EASE SOLUTIONS PTE. LTD. | S$197,271 |
| 29 Jan 2026 | Provision of Civil & Structural Engineering Consultancy Services for Infrastructure Works at East Seletar | LSW CONSULTING ENGINEERS PTE. LTD. | S$1,982,009 |
| 21 Jan 2026 | PROPOSED DEMOLITION OF EXISTING FACTORY BUILDINGS AND ANCILLARY STRUCTURES AT KRANJI WAY, SUNGEI KADUT AND TUAS (GROUP 17) | PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | S$2,674,000 |
| 19 Jan 2026 | 2-YEAR TERM CONTRACT FOR PROVISION OF THREE (3) IN-SOURCED IDD MANAGERS AND TWO (2) EXECUTIVE ADMINISTRATORS FOR MANAGEMENT OF BUILT ENVIRONMENT (BE) PROJECTS AND CDE ADMINISTRATIVE MATTERS | ACEPLP.COM PTE LTD | S$1,593,600 |
| 19 Jan 2026 | DESIGN, SUPPLY, INSTALL, TEST AND COMMISSION OPEN DIGITAL PLATFORM (ODP) INTERFACE MODULES FOR LIFT INTEGRATION TO THE ODP AT BULIM SQUARE | AUTOMATIC CONTROLS AND INSTRUMENTATION PTE. LTD. | S$34,200 |
| 2 Jan 2026 | Provision Of Consultancy Services On Audit Methodology & Benchmarking For Audit & Advisory Division (AAD) | DELOITTE SINGAPORE ASSURANCE PTE. LTD. | S$332,400 |
| 19 Dec 2025 | Provision of Contract Resources for Finance Operations in JTC | WSH EXPERTS PTE. LTD. | S$1 |
| 19 Dec 2025 | REPAIR OF 20 JURONG PIER ROAD BUILDING UNDERDECK AND DEMOLITION OF EXISTING JETTY (PIER 20) AT 35 JURONG PIER ROAD | STEADFAST ENGINEERING & CONSTRUCTION PTE. LTD. | S$2,758,210 |
| 19 Dec 2025 | Instrument Monitoring Works for Proposed Reclamation at Northern Tuas Basin | SOIL INVESTIGATION PTE. LIMITED | S$1,999,000 |
| 19 Dec 2025 | Provision of Contract Resources for Finance Operations in JTC | ALWAYSHIRED PTE. LTD. | S$1 |
| 19 Dec 2025 | Provision of Contract Resources for Finance Operations in JTC | ASCENDION ENGINEERING SOLUTIONS SINGAPORE PTE. LTD. | S$1 |
| 19 Dec 2025 | Provision of Contract Resources for Finance Operations in JTC | EXPERTISE TECHNOLOGIES PTE LTD | S$1 |
| 19 Dec 2025 | Provision of Contract Resources for Finance Operations in JTC | HTC SOFTWARE SINGAPORE PTE LTD | S$1 |
| 19 Dec 2025 | Provision of Contract Resources for Finance Operations in JTC | MORGAN MCKINLEY PTE. LTD. | S$1 |
| 19 Dec 2025 | Provision of Contract Resources for Finance Operations in JTC | RMA CONTRACTS PTE. LTD. | S$1 |
| 11 Dec 2025 | Proposed Land Rectification Works at Kaki Bukit iGLS along Bedok Reservoir Road | HWEE WAH ENGINEERING PTE. LTD. | S$3,000,000 |
| 10 Dec 2025 | PROPOSED REPAIRS AND REFURBISHMENTS OF UNITS #01-1367, 1369 & 1375 WITH RECONSTRUCTION OF UNITS #01-1371 & 1373 OF BLOCK 3 ON LOT 10841P MK 17 @ TOA PAYOH INDUSTRIAL PARK | MIE-TECH ENGINEERING & CONSTRUCTION PTE LTD | S$647,700 |
| 27 Nov 2025 | Proposed Development of Heavy Vehicle Park at Tengah | HUATIONG CONTRACTOR PTE LTD | S$22,380,000 |
| 24 Nov 2025 | Provision of Multi-Disciplinary Consultancy Services for Preliminary Coastal Development Plan at West of Singapore | AECOM SINGAPORE PTE. LTD. | S$4,200,001 |
| 20 Nov 2025 | 3-YEAR TERM CONTRACT FOR LEASING OF CONTAINER OFFICES AT JURONG ISLAND CHECKPOINT | NEXUS CONSULTANCY SERVICES PTE LTD | S$217,300 |
| 18 Nov 2025 | Multi-Disciplinary Consultancy Services for JTC Food Hub 2 @ Senoko | P & T CONSULTANTS PTE. LTD. | S$180,004 |
| 3 Nov 2025 | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | S$1 |
| 3 Nov 2025 | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | KTC CIVIL ENGINEERING & CONSTRUCTION PTE LTD | S$1 |
| 3 Nov 2025 | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | HAO DA PTE LTD | S$1 |
| 3 Nov 2025 | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | YONGSHENG E & C PTE. LTD. | S$1 |
| 3 Nov 2025 | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | HI-TACT SOLUTIONS & TRADING PTE. LTD. | S$1 |
| 3 Nov 2025 | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | BENG SOON MACHINERY SERVICES (SINGAPORE) PTE LTD | S$1 |
| 3 Nov 2025 | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | BENG HENG ENGINEERING PTE LTD | S$1 |
| 3 Nov 2025 | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | HWA AIK ENGINEERING PTE. LTD. | S$1 |
| 3 Nov 2025 | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | RECLAIMS ENTERPRISE PTE. LTD. | S$1 |
| 28 Oct 2025 | Outstanding Works and Defects Rectification at CleanTech Three, CleanTech Loop | QXY RESOURCES PTE. LTD. | S$3,879,000 |
| 27 Oct 2025 | INSTRUMENTATION AND MONITORING WORK FOR PROPOSED ROADS, DRAINS AND SEWERS AT LOYANG WAY AND LOYANG HEIGHTS | GLOBAL SINOTRUST PTE. LTD. | S$82,687 |
| 27 Oct 2025 | ACCREDITED CHECKING ORGANISATION (ACO) AND SPECIALIST ACCREDITED CHECKERS (GEOTECHNICAL) [AC(GEO)] PROFESSIONAL SERVICES FOR PROPOSED RECLAMATION AT NORTHERN TUAS BASIN | MEINHARDT (SINGAPORE) PTE LTD | S$1,180,500 |
| 13 Oct 2025 | PROVISION OF STORAGE AND RECORDS MANAGEMENT SERVICES FOR 3 CALENDAR YEARS | FREIGHT LINKS EXPRESS ARCHIVERS PTE LTD | S$221,530 |
| 8 Oct 2025 | RENEWAL OF SAFE SOFTWARE FEATURE MANIPULATION ENGINE (FME) LICENSES | 1SPATIAL AUSTRALIA PTY LIMITED | S$175,720 |
| 7 Oct 2025 | Consultancy Studies of Net Zero Emission Zones, JTC's Carbon Emission Profile and Decarbonization Roadmap | ENVIRONMENTAL RESOURCES MANAGEMENT (S) PTE LTD | S$490,813 |
| 2 Oct 2025 | PROPOSED DEMOLITION OF EXISTING FACTORY BUILDINGS AND ANCILLARY STRUCTURES AT DEFU LANE AND KALLANG WAY (GROUP 14) | PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | S$2,989,000 |
| 2 Oct 2025 | Provision for Architectural Consultancy Services for JTC Developments and Industrial Estates | TAN + TSAKONAS ARCHITECTS LLP | S$1 |
| 1 Oct 2025 | 2+2 YEARS TERM CONTRACT FOR PROVISION OF WORKPLACE SAFETY AND HEALTH PROFESSIONALS | GREENSAFE INTERNATIONAL PTE. LTD. | S$21,100 |
| 1 Oct 2025 | Construction of Infrastructure Works at Cleantech Loop (Phase 2A) | ENG LAM CONTRACTORS CO (PTE) LTD | S$22,638,000 |
| 1 Oct 2025 | 2+2 YEARS TERM CONTRACT FOR PROVISION OF WORKPLACE SAFETY AND HEALTH PROFESSIONALS | R.J. CROCKER CONSULTANTS PTE. LTD. | S$26,798 |
| 19 Sept 2025 | Proposed NEWater Pipe Diversion Works at Ang Mo Kio Industrial Park 2 | SHINGDA CONSTRUCTION PTE. LTD. | S$5,235,265 |
| 10 Sept 2025 | 2 YEAR TERM CONTRACT FOR THE SUPPLY OF PERSONNEL PROTECTIVE EQUIPMENT (PPE) TO JTC STAFF | FLEMINGS SAFETY PTE. LTD. | S$1 |
| 10 Sept 2025 | 2 YEAR TERM CONTRACT FOR THE SUPPLY OF PERSONNEL PROTECTIVE EQUIPMENT (PPE) TO JTC STAFF | UNISAFE PTE. LTD. | S$1 |
| 6 Sept 2025 | APPOINTMENT OF CONTRACTOR FOR THE MAINTENANCE OF NAVIGATIONAL AIDS AT TUAS BAY FOR TWO (2) YEARS | HELM MARINE (SINGAPORE) PTE. LTD. | S$223,632 |
| 2 Sept 2025 | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Link Road, Senoko Drive & Senoko Loop (Group 12) | HWA AIK ENGINEERING PTE. LTD. | S$2,120,000 |
| 29 Aug 2025 | Challenge Statements - Improving Thermal Comfort and Energy Efficiency at Clean Tech One | NRGSENSE TECHNOLOGIES PTE. LTD. | S$454,290 |
| 29 Aug 2025 | Challenge Statement - Data-led Mixed Use Waste Handling | KLERRA PTE. LTD. | S$432,383 |
| 29 Aug 2025 | Challenge Statements - Improving Thermal Comfort and Energy Efficiency at Clean Tech One | GAIA TECH PTE. LTD. | S$314,719 |
| 28 Aug 2025 | ENGAGEMENT OF CONSULTANCY SERVICES TO CARRY OUT RISK ASSESSMENT FOR DATA CENTRE SITING ON JURONG ISLAND | ENVIRONMENTAL RESOURCES MANAGEMENT (S) PTE LTD | S$168,000 |
| 18 Aug 2025 | Challenge Statement - Zero Waste Industries | TERRA SOL PRIVATE LIMITED | S$458,840 |
| 18 Aug 2025 | Real Time Monitoring and Analytic System of In-Building Water Distribution | DAON SOLUTIONS PTE. LTD. | S$403,298 |
| 18 Aug 2025 | Real Time Monitoring and Analytic System of In-Building Water Distribution | NM3 TECH (S) PTE. LTD. | S$78,740 |
| 18 Aug 2025 | Challenge Statement - Energy Efficient Buildings | ESAVE.AI PTE. LTD. | S$233,988 |
| 18 Aug 2025 | Carbon Neutral Horticultural Processes | BLUEFIELD RENEWABLE ENERGY PTE. LTD. | S$185,276 |
| 18 Aug 2025 | Challenge Statement - Improving Outdoor Thermal Comfort at Jurong Innovation District (JID) | NRGSENSE TECHNOLOGIES PTE. LTD. | S$348,097 |
| 15 Aug 2025 | Accredited Checking Services for Roads, Drains and Sewer Works at Loyang Way | ECAS CONSULTANTS PTE. LTD. | S$211,000 |
| 12 Aug 2025 | Proposed upscaling works for ACMV and Electrical System at JTC Cleantech 3 @ CleanTech Park | LEAP INTEGRATED PTE. LTD. | S$5,746,816 |
| 11 Aug 2025 | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Jalan Ahmad Ibrahim, Tanjong Penjuru and Defu Industrial Park (Group 13) | BENG SOON MACHINERY SERVICES (SINGAPORE) PTE LTD | S$4,223,000 |
| 7 Aug 2025 | Accredited Checking Services for Proposed Reclamation at Northern Tuas Basin | Unknown | S$0 |
| 1 Aug 2025 | Multi-Disciplinary Consultancy Services for Feasibility Study for Solar Canopies Deployment | ARUP SINGAPORE PRIVATE LIMITED | S$3,880,000 |
| 29 Jul 2025 | Challenge Statement - Sustainable Water Usage | Unknown | S$0 |
| 4 Jul 2025 | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Defu Industrial Park (Batch 3) | NEO & GOH CONSTRUCTION PTE LTD | S$2,760,000 |
| 4 Jul 2025 | DESIGN & BUILD FOR REVAMP OF THE MEETING POINT AT LAUNCHPAD AT ONE-NORTH | QXY RESOURCES PTE. LTD. | S$1,188,000 |
| 30 Jun 2025 | ENGAGEMENT OF SERVICES FOR 2D TO 3D MODEL CONSTRUCTION PROJECT | ACEPLP.COM PTE LTD | S$514,510 |
| 30 Jun 2025 | ENGAGEMENT OF SERVICES FOR 2D TO 3D MODEL CONSTRUCTION PROJECT | BIMAGE CONSULTING PTE. LTD. | S$546,000 |
| 30 Jun 2025 | PROPOSED RECLAMATION AT NORTHERN TUAS BASIN | PENTA-OCEAN CONSTRUCTION COMPANY LIMITED | S$299,500,000 |
| 28 Jun 2025 | PROVISION, IMPLEMENTATION AND MAINTENANCE SUPPORT OF EDR SYSTEM | Unknown | S$0 |
| 17 Jun 2025 | Provision of Application Management Services for Finance, Projects and Procurement (SAP) and Related Applications for JTC Corporation | KPMG SERVICES PTE. LTD. | S$2,999,673 |
| 6 Jun 2025 | Soil Investigation and Survey Works at West Jurong Channel | GEONAMICS (S) PTE LTD | S$1,676,619 |
| 4 Jun 2025 | PROVISION OF SUSTAINABILITY REPORTING CONSULTANCY SERVICES FOR JTC CORPORATION | BDO CONSULTANTS PTE. LTD. | S$48,000 |
| 4 Jun 2025 | PROVISION OF SUSTAINABILITY REPORTING CONSULTANCY SERVICES FOR JTC CORPORATION | GRANT THORNTON SINGAPORE PRIVATE LIMITED | S$12,000 |
| 3 Jun 2025 | 2-YEARS TERM CONTRACT FOR PROVISION OF PROFESSIONAL ENGINEERING SERVICES TO CONDUCT INSPECTION AND REVIEW FOR THE SLOPES AND RETAINING WALLS WITHIN JTC ESTATES | TERS CONSULTING PTE. LTD. | S$224,670 |
| 28 May 2025 | PROVISION OF MULTI-DISCIPLINARY CONSULTANCY SERVICES FOR INTEGRATED CONCEPTUAL GREEN AND BLUE MASTER PLAN AND CONCEPTUAL INFRASTRUCTURE DESIGN AT SUNGEI KADUT ECO-DISTRICT AND ITS VICINITY | SWAN & MACLAREN ARCHITECTS PTE. LTD. | S$2,780,000 |
| 23 May 2025 | Repair & Refurbishment Works to Jurong Island Checkpoint, Jurong Island Highway and Access Road, Repair of 20 Jurong Pier Road Building Underdeck, and Demolition of Existing Jetty (Pier 20) at 35 Jurong Pier Road | Unknown | S$0 |
| 8 May 2025 | Improvement Works to High Rise Multi-User Industrial Complex (DIC) at 2 Defu South Street 1 | QXY RESOURCES PTE. LTD. | S$4,753,000 |
| 29 Apr 2025 | Proposed Facade Recladding to Block 7 (Helios) of Biopolis on Lot 04932W Mukim 3 at North Buona Vista Drive (Queenstown Planning Area) | JANGHO CURTAIN WALL SINGAPORE PTE. LTD. | S$24,062,876 |
| 17 Apr 2025 | Instrumentation and Monitoring Works for Slopes 2, 4, 6 and 7 at Jurong Hill | ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | S$74,640 |
| 2 Apr 2025 | Provision of Specialist Consultancy Services for Proposed Electronic Overhead Travelling Cranes at JTC Logistics Hub @ Gul | NDI AUTOMATION PTE. LTD. | S$247,500 |
| 2 Apr 2025 | REPLACEMENT OF WATERPROOFING SYSTEM IN REVENUE HOUSE AND THE TREASURY | AIK SAN CONSTRUCTION PTE LTD | S$5,032,000 |
| 28 Mar 2025 | Provision of Shuttle Bus Services at Jurong Island for 2 Years | WOODLANDS TRANSPORT SERVICE PTE LTD | S$1,433,280 |
| 28 Mar 2025 | Provision of Shuttle Bus Services at Jurong Island for 2 Years | TONG TAR TRANSPORT SERVICE PTE LTD | S$2,832,000 |
| 25 Mar 2025 | Interior Fit-out Works to Level 21 at the JTC Summit Office Building | D' PERCEPTION SINGAPORE PTE. LTD. | S$2,153,184 |
| 21 Mar 2025 | PLACEMENT OF INSURANCE POLICIES FOR JTC's CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS WITH OPTION TO EXTEND FOR 1 YEAR | MS FIRST CAPITAL INSURANCE LIMITED | S$1 |
| 21 Mar 2025 | PLACEMENT OF INSURANCE POLICIES FOR JTC's CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS WITH OPTION TO EXTEND FOR 1 YEAR | QBE INSURANCE (SINGAPORE) PTE. LTD. | S$1 |
| 21 Mar 2025 | PLACEMENT OF INSURANCE POLICIES FOR JTC's CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS WITH OPTION TO EXTEND FOR 1 YEAR | LIBERTY PTE. LIMITED | S$1 |
| 21 Mar 2025 | PLACEMENT OF INSURANCE POLICIES FOR JTC's CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS WITH OPTION TO EXTEND FOR 1 YEAR | CHUBB INSURANCE SINGAPORE LIMITED | S$1 |
| 21 Mar 2025 | PLACEMENT OF INSURANCE POLICIES FOR JTC's CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS WITH OPTION TO EXTEND FOR 1 YEAR | SWISS RE INTERNATIONAL SE Singapore Branch | S$1 |
| 21 Mar 2025 | PLACEMENT OF INSURANCE POLICIES FOR JTC's CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS WITH OPTION TO EXTEND FOR 1 YEAR | SOMPO INSURANCE SINGAPORE PTE. LTD. | S$1 |
| 21 Mar 2025 | PLACEMENT OF INSURANCE POLICIES FOR JTC's CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS WITH OPTION TO EXTEND FOR 1 YEAR | INDIA INTERNATIONAL INSURANCE PTE LTD | S$1 |
| 14 Mar 2025 | 2+1 YEAR TERM CONTRACT FOR PROVISION OF RESIDENT SITE SUPERVISORS FOR JTC'S BUILDING AND INFRASTRUCTURE PROJECTS (YEAR 2025 to 2027) | RCY PTE. LTD. | S$115,165 |
| 14 Mar 2025 | 2+1 YEAR TERM CONTRACT FOR PROVISION OF RESIDENT SITE SUPERVISORS FOR JTC'S BUILDING AND INFRASTRUCTURE PROJECTS (YEAR 2025 to 2027) | BUREAU VERITAS BUILDINGS & INFRASTRUCTURE PTE. LTD. | S$30,300 |
| 13 Mar 2025 | 2+1+1 Year Term Contract for Provision of Project Managers for Management of Various Infrastructure and Building Projects | AIS-HILL PTE. LTD. | S$4 |
| 5 Mar 2025 | APPOINTMENT OF OPERATOR TO DESIGN, SUPPLY, INSTALL AND MANAGE DIGITAL DIRECTORIES AND SIGNAGE DISPLAYS FOR A PERIOD OF 3 YEARS | CARATS&CO PTE. LTD. | S$202,680 |
| 5 Mar 2025 | PROVISION OF JIRA SERVICE MANAGEMENT (DATA CENTER) AND PLUGINS SUBSCRIPTION WITH MAINTENANCE FOR JTC | EASE SOLUTIONS PTE. LTD. | S$166,659 |
| 25 Feb 2025 | Design Development and Build for Additions & Alterations to Existing 4-Storey Multi-User Cleanroom Industrial Development with Ancillary Facilities and Demolition & Construction of 3-Storey Central Utility Building for 11 Tampines Industrial Crescent | HPC BUILDERS PTE. LTD. | S$188,800,000 |
| 11 Feb 2025 | Provision of Security Rating Services Subscription | EVVO LABS PTE. LTD. | S$22,632 |
| 8 Jan 2025 | Provision of Multi-Disciplinary Consultancy Services for Improvement Works at JTC Logistics Hub (JLH), Kranji Green (KG) and Timmac | VIVATA PTE. LTD. | S$14 |
| 30 Dec 2024 | Provision of MongoDB Software Licenses Subscription Renewal and Professional Services for JTC Datahub | CTC GLOBAL PTE. LTD. | S$313,404 |
| 30 Dec 2024 | Provision of Jurong Island (JI) CCTV Enhancement for 3 Years | AEQON TJ PTE. LTD. | S$2,062,000 |
| 27 Dec 2024 | Multi-Disciplinary Consultancy Services for the Shoreline Stabilisation at Tuas Curve Profile | SURBANA JURONG CONSULTANTS PTE. LTD. | S$8,737,701 |
| 26 Dec 2024 | Permanent Slope Repair and Strengthening Works to Slope 2, 4, 6 and 7 and Ancillary Works at Jurong Hill. | UTRACO PTE. LTD. | S$5,988,800 |
| 12 Dec 2024 | 3 YEAR TERM CONTRACT FOR THE DESIGN, BUILD AND MAINTAIN THE CONSTRUCTION SAFETY SCHOOL AT JTC SPACE@GUL | SCAL ACADEMY PTE. LTD. | S$1 |
| 5 Dec 2024 | PROVISION OF PRIVILEGE ACTIVITY RECORDING SYSTEM (OBSERVEIT) SOFTWARE LICENSING SUPPORT AND MAINTENANCE FOR A PERIOD OF 1 YEAR | ENTIIS PTE. LTD. | S$72,000 |
| 29 Nov 2024 | Provision Of Multi-Disciplinary Consultancy Services for Proposed Development of 66kV Substation at Ang Mo Kio | DP ARCHITECTS PTE LTD. | S$17 |
| 26 Nov 2024 | CONSULTANCY TO REVIEW AND PROPOSE ENHANCEMENTS TO JTC CORPORATION'S BUSINESS RESILIENCE GROUP | PRICEWATERHOUSECOOPERS RISK SERVICES PTE. LTD. | S$140,160 |
| 22 Nov 2024 | Proposed Demolition of Existing Factory Building and Ancillary Structures at Gul Circle, Kranji Way, Sungei Kadut and Penjuru Road | PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | S$5,594,000 |
| 20 Nov 2024 | Tender for Appointment of Contractor for the Provision of Packing, Moving and Storage Services for Three (3) Office Buildings at Orchard Road | K.C. DAT (SINGAPORE) PRIVATE LIMITED | S$630,242 |
| 7 Nov 2024 | Proposed Addition and Alteration Works and Restoration Works to Two (2) Conservation Buildings and One (1) Three-Storey Building at Orchard Road. | SUNRAY WOODCRAFT CONSTRUCTION PTE LTD | S$142,388,889 |
| 5 Nov 2024 | PROPOSED ROAD WIDENING AND SEWER & DRAIN UPGRADING WORKS AT KOLAM AYER INDUSTRIAL ESTATE | BAN CHON CORPORATION & TRADING PTE LTD | S$24,981,216 |
| 5 Nov 2024 | Repair and Reinstatement Works to Fire Affected Bus-Ducts at Level 1 and 2 of Block 3023 UbiPlex 1, Ubi Road 3 | S K E ENGINEERING (S) PTE LTD | S$155,500 |
| 4 Nov 2024 | IMPLEMENTATION OF SEASON SALE SYSTEM FOR JTC'S GAZETTED CARPARKS FOR A PERIOD OF 3+1+1 YEARS | WILSON PARKING (SINGAPORE) PTE. LTD. | S$218,000 |
| 28 Oct 2024 | PROVISION OF WORK INJURY COMPENSATION, GROUP PERSONAL ACCIDENT AND GROUP TERM LIFE INSURANCE PROGRAMME FOR 2 YEARS | THE GREAT EASTERN LIFE ASSURANCE COMPANY LIMITED | S$1 |
| 28 Oct 2024 | PROVISION OF WORK INJURY COMPENSATION, GROUP PERSONAL ACCIDENT AND GROUP TERM LIFE INSURANCE PROGRAMME FOR 2 YEARS | ZURICH INSURANCE COMPANY LTD (Singapore Branch) | S$1 |
| 28 Oct 2024 | PROVISION OF WORK INJURY COMPENSATION, GROUP PERSONAL ACCIDENT AND GROUP TERM LIFE INSURANCE PROGRAMME FOR 2 YEARS | TOKIO MARINE INSURANCE SINGAPORE LTD. | S$1 |
| 25 Oct 2024 | ACCREDITED CHECKING ORGANISATION (ACO) AND SPECIALIST ACCREDITED CHECKING (GEOTECHNICAL) SERVICES FOR PROPOSED COASTAL DEVELOPMENT | ECAS CONSULTANTS PTE. LTD. | S$460,050 |
| 25 Oct 2024 | CONSTRUCTION OF BACKUP SEWER CROSSINGS AT MERANTI CRESCENT, JURONG ISLAND | CHARTWORTH ENTERPRISE SINGAPORE PTE. LTD. | S$6,867,538 |
| 24 Oct 2024 | INSTRUMENT MONITORING WORKS FOR PROPOSED COASTAL DEVELOPMENT | RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | S$2,170,000 |
| 22 Oct 2024 | Provision of Specialist Consultancy Services for Proposed Electronic Overhead Travelling Cranes at JTC Logistics Hub @ Gul | Unknown | S$0 |
| 21 Oct 2024 | PROVISION OF RESOURCES TO CARRY OUT INSPECTION TO PREMISES FOR A PERIOD OF 3 YEARS | WSH EXPERTS PTE. LTD. | S$1,828,800 |
| 21 Oct 2024 | PROVISION OF RESOURCES TO CARRY OUT INSPECTION TO PREMISES FOR A PERIOD OF 3 YEARS | CHBC INTEGRATED BUILDERS PTE. LTD. | S$1,297,008 |
| 18 Oct 2024 | Proposed Demolition of Existing Factory Building and Ancillary Structures at Tuas Basin Close, Tuas Crescent, Tuas Basin Link, Tuas Basin Lane, Tuas Road & Tuas South Avenue 5 | PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | S$2,950,000 |
| 15 Oct 2024 | 1 + 1 YEAR TERM CONTRACT FOR PROVISION OF ONE ADMINISTRATIVE EXECUTIVE (AE) | SERVICE CONNECTIONS HR CONSULTANCY PTE. LTD. | S$37,884 |
| 15 Oct 2024 | Multi-Disciplinary Consultancy Services for Addition and Alteration Works at Biopolis Matrix Office Units and Biopolis Centros | TAN + TSAKONAS ARCHITECTS | S$14 |
| 14 Oct 2024 | PROVISION OF VIDEO PRODUCTION AND 3D ANIMATION SERVICES FOR JURONG INNOVATION DISTRICT | VISUALMEDIAWORKS PTE LTD | S$175,000 |
| 11 Oct 2024 | Provision of Site Supervision Staff for JTC Reclamation and Marine Related Projects | WSH EXPERTS PTE. LTD. | S$48,240 |
| 1 Oct 2024 | Instrumentation and Monitoring Works for Bulim Phase 2 Infrastructure | ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | S$747,782 |
| 26 Sept 2024 | 3-Year TC for Provision of Consultancy Services for Traffic Impact Assessment (TIA) Studies for JTC's Developments and Industrial Estates | SYSTRA MVA SINGAPORE PTE. LTD. | S$1 |
| 26 Sept 2024 | 3-Year TC for Provision of Consultancy Services for Traffic Impact Assessment (TIA) Studies for JTC's Developments and Industrial Estates | CPG CONSULTANTS PTE LTD | S$1 |
| 23 Sept 2024 | PROVISION OF SERVICES FOR COLLECTION AND DISPOSAL OF DOCUMENTS & OTHER DOCUMENT RELATED WASTE MATERIAL | Unknown | S$0 |
| 9 Sept 2024 | APPOINTMENT OF INTEGRATED BUILDING CONTRACTOR (IBC) TO GOVERNMENT BUILDINGS ALONG ORCHARD ROAD FOR A PERIOD OF 3 YEARS | KIM YEW INTEGRATED PTE. LTD. | S$7,369,566 |
| 6 Sept 2024 | INVITATION TO TENDER FOR OPEN DIGITAL PLATFORM (ODP) INFRASTRUCTURE | STARHUB LTD. | S$2,423,504 |
| 3 Sept 2024 | 1-Year Term Contract for Provision of One (1) Civil and Structural Engineer and One (1) Mechanical BIM Engineer/Modeller for JTC Projects | WSH EXPERTS PTE. LTD. | S$110,040 |
| 3 Sept 2024 | 1-Year Term Contract for Provision of One (1) Civil and Structural Engineer and One (1) Mechanical BIM Engineer/Modeller for JTC Projects | BIMFINITY INTERNATIONAL PTE. LTD. | S$87,600 |
| 30 Aug 2024 | Engagement of Consultancy Services for International (Industrial Land) Benchmarking Study | CBRE PTE. LTD. | S$1 |
| 29 Aug 2024 | PLACEMENT OF INSURANCE POLICIES FOR THE OPERATION OF JURONG ROCK CAVERNS FOR A PERIOD OF 18 MONTHS WITH AN OPTION TO EXTEND FOR ANOTHER 18 MONTHS | MS FIRST CAPITAL INSURANCE LIMITED | S$1 |
| 28 Aug 2024 | Supply and installation of Fitting Out, Furnishing and Loose Furniture at Punggol Digital District | TRENDBUILD CONTRACTS PTE. LTD. | S$1,395,800 |
| 28 Aug 2024 | Renewal Of Incident Response Retainer Services | KPMG SERVICES PTE. LTD. | S$112,500 |
| 26 Aug 2024 | JTC Innovation Challenge 2023: Challenge Statement 3 -Solutions to inspect and effectively clear choked drain pipes in buildings | INTERLOCK SECURITY AND INVESTIGATION SERVICES PTE LTD | S$250,000 |
| 20 Aug 2024 | 2+1 YEAR TERM QUANTITY SURVEYING CONSULTANCY SERVICES FOR PROPOSED DEMOLITION OF EXISTING JTC FACTORY BUILDINGS AND ANCILLARY STRUCTURES | CSN CONSULTANTS PTE. LTD. | S$3 |
| 20 Aug 2024 | 2+1 YEAR TERM QUANTITY SURVEYING CONSULTANCY SERVICES FOR PROPOSED DEMOLITION OF EXISTING JTC FACTORY BUILDINGS AND ANCILLARY STRUCTURES | OTN BUILDING COST CONSULTANTS PTE. LTD. | S$5 |
| 14 Aug 2024 | Consultancy Service to Review and Make Recommendations on the Optimisation of JTC's Property Portfolio | DBS BANK LTD. | S$1 |
| 13 Aug 2024 | APPOINTMENT OF FMC FOR FACILITIES MAINTENANCE OF CSC FOR A PERIOD OF 3 YEARS | CBRE GWS PTE. LTD. | S$7,424,003 |
| 8 Aug 2024 | Multi-Disciplinary Consultancy Services for Building Study and Analysis of 10 View Road and Surrounding Area | DP ARCHITECTS PTE LTD. | S$2,954,361 |
| 1 Aug 2024 | PROPOSED ADDITION & ALTERATION WORKS TO EXISTING 8 STOREY FLATTED FACTORY (WITH 1 LEVEL BASEMENT CARPARK) AT AYER RAJAH CRESCENT/ AYER RAJAH AVENUE ON LOT 5364N MK03 (QUEENSTOWN PLANNING AREA) | VIGCON CONSTRUCTION PTE LTD | S$27,375,000 |
| 30 Jul 2024 | JTC's Independent Civil and Structural Consultancy Panel on Infrastructure Projects for a period of 2+1+1 years | HARVEST CONSULTING ENGINEERS LLP | S$2 |
| 30 Jul 2024 | JTC's Independent Civil and Structural Consultancy Panel on Infrastructure Projects for a period of 2+1+1 years | WSP CONSULTANCY PTE. LTD. | S$4 |
| 30 Jul 2024 | JTC's Independent Civil and Structural Consultancy Panel on Infrastructure Projects for a period of 2+1+1 years | LSW CONSULTING ENGINEERS PTE. LTD. | S$4 |
| 30 Jul 2024 | JTC's Independent Civil and Structural Consultancy Panel on Infrastructure Projects for a period of 2+1+1 years | JIB SPECIALIST CONSULTANTS PTE. LTD. | S$2 |
| 30 Jul 2024 | JTC's Independent Civil and Structural Consultancy Panel on Infrastructure Projects for a period of 2+1+1 years | AIS-HILL PTE. LTD. | S$2 |
| 30 Jul 2024 | JTC's Independent Civil and Structural Consultancy Panel on Infrastructure Projects for a period of 2+1+1 years | CAGA CONSULTANTS PTE. LTD. | S$4 |
| 30 Jul 2024 | JTC's Independent Civil and Structural Consultancy Panel on Infrastructure Projects for a period of 2+1+1 years | CPG CONSULTANTS PTE LTD | S$4 |
| 30 Jul 2024 | JTC's Independent Civil and Structural Consultancy Panel on Infrastructure Projects for a period of 2+1+1 years | EXECUTIVE DECISIONS INC. LLP | S$4 |
| 29 Jul 2024 | Provision of Maintenance Contract for IT Equipment | NCS PTE. LTD. | S$2,206,796 |
| 22 Jul 2024 | Construction of Infrastructure Works at Bulim (Phase 2) | KTC CIVIL ENGINEERING & CONSTRUCTION PTE LTD | S$617,768,000 |
| 16 Jul 2024 | Provision Of Professionals and Executives for JTC New Estates Developments | WSH EXPERTS PTE. LTD. | S$2 |
| 12 Jul 2024 | Provision of Consultancy Services for Implementation of one-north Phase 2 Cycling Path & Public Bus Stops | Unknown | S$0 |
| 5 Jul 2024 | PROVISION OF INTERNAL AUDIT SERVICES FOR 2 YEARS | DELOITTE SINGAPORE ASSURANCE PTE. LTD. | S$888,000 |
| 1 Jul 2024 | Provision of Smart Building Solutions Study and Advisory Services | SURBANA TECHNOLOGIES PTE. LTD. | S$41,400 |
| 20 Jun 2024 | Sewer Upgrading Along Tuas View Crescent | BAN CHON CORPORATION & TRADING PTE LTD | S$7,382,680 |
| 14 Jun 2024 | APPOINTMENT OF FACILITY MANAGEMENT COMPANY FOR FACILITIES MAINTENANCE OF JTC NANOSPACE @ TAMPINES FOR A PERIOD OF 2 YEARS | CTM FACILITIES MANAGEMENT PTE. LTD. | S$5,992,533 |
| 14 Jun 2024 | Design and Construction of Cul-De-Sac Road and Associated Infrastructure Works at Pasir Ris Wafer Fab Park | HUATIONG CONTRACTOR PTE LTD | S$9,678,800 |
| 10 Jun 2024 | SOFTWARE LICENSE MAINTENANCE RENEWAL OF CA WORKLOAD AUTOMATION | ENTIIS PTE. LTD. | S$483,400 |
| 5 Jun 2024 | Jurong Island Road Link ("JIRL") Protection Project | Unknown | S$0 |
| 31 May 2024 | 2-Year Term Contract for the Provision of Shuttle Bus Services at Seletar Aerospace Park and CleanTech Park | AEDGE HOLDINGS PTE. LTD. | S$1,223,376 |
| 31 May 2024 | 2-YEAR TERM CONTRACT FOR THE PROVISION OF SHUTTLE BUS SERVICE AT AIRPORT LOGISTICS PARK OF SINGAPORE | LEISURE FRONTIER (S) PTE. LTD. | S$228,000 |
| 31 May 2024 | Renewal of eG Monitoring Software and Maintenance Licensing for 5 years | NCS PTE. LTD. | S$269,340 |
| 23 May 2024 | PROFESSIONAL SERVICES FOR THE IMPLEMENTATION AND SYSTEM OPERATION SUPPORT SERVICES OF CUSTOMER RELATIONSHIP MANAGEMENT (CRM) | KPMG SERVICES PTE. LTD. | S$2,933,005 |
| 15 May 2024 | 2-Year Term Contract for Geophysical and Survey Works for JTC Estates | RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | S$1 |
| 15 May 2024 | 2-Year Term Contract for Geophysical and Survey Works for JTC Estates | SOIL INVESTIGATION PTE. LIMITED | S$1 |
| 15 May 2024 | 2-Year Term Contract for Soil Investigation Works Within JTC Estate | RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | S$1 |
| 15 May 2024 | 2-Year Term Contract for Soil Investigation Works Within JTC Estate | CAST LABORATORIES PTE LTD | S$1 |
| 30 Apr 2024 | Provision of Multi-Disciplinary Consultancy Services for Proposed JTC Space @ AMK 2 | DP ARCHITECTS PTE LTD. | S$4 |
| 29 Apr 2024 | Provision of certified arborists and manpower to support the Master Landscape Services Contract for JTC Parks and Gardens and other landscape implementation projects. | CSK LANDSCAPE SERVICES (S) PTE. LTD. | S$947,750 |
| 26 Apr 2024 | JTC Innovation Challenge 2023: Challenge Statement 1 - Improving security surveillance, situational awareness and incident response in JTC's industrial estates | ST ENGINEERING MISSION SOFTWARE & SERVICES PTE. LTD. | S$248,000 |
| 22 Apr 2024 | Appointment Of Qualified Person (Supervision) For Proposed Infrastructure Works At Ayer Merbau Road, Jurong Island | SGL CONSULTING ENGINEERS | S$99,800 |
| 18 Apr 2024 | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | ASIA INFRASTRUCTURE SOLUTIONS SINGAPORE PTE. LTD. | S$10 |
| 18 Apr 2024 | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | CSN CONSULTANTS PTE. LTD. | S$1 |
| 18 Apr 2024 | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | TURNER & TOWNSEND PTE. LIMITED | S$12 |
| 18 Apr 2024 | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | YSCA CONSULTANCY SINGAPORE PTE. LTD. | S$2 |
| 18 Apr 2024 | 24 Months Term Contract for Provision of Environmental Advisory Services (Year 2024 - Year 2026) | AECOM SINGAPORE PTE. LTD. | S$722,100 |
| 18 Apr 2024 | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | AECOM COST CONSULTING AND PROJECT MANAGEMENT (SINGAPORE) PTE. LTD. | S$10 |
| 18 Apr 2024 | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | DK OUTSOURCE PTE. LTD. | S$2 |
| 18 Apr 2024 | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | OTN BUILDING COST CONSULTANTS PTE. LTD. | S$5 |
| 18 Apr 2024 | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | PQS CONSULTANTS PTE. LTD. | S$4 |
| 18 Apr 2024 | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | QS CONSULTANTS PTE. LTD. | S$2 |
| 18 Apr 2024 | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | RIDER LEVETT BUCKNALL CONSULTANCY PTE. LTD. | S$2 |
| 9 Apr 2024 | Proposed Infrastructure Works at Ayer Merbau Road, Jurong Island | CHARTWORTH ENTERPRISE SINGAPORE PTE. LTD. | S$15,929,438 |
| 3 Apr 2024 | Master Landscape Services Contract for JTC Properties and Estates | MAO SHENG QUANJI CONSTRUCTION PTE LTD | S$5,866,467 |
| 3 Apr 2024 | Proposed Regularisation of Fire Safety Works to Existing Fusionopolis One Building on Lot 04044T MK 03 at 1/3 Fusionopolis Way | VIGCON CONSTRUCTION PTE LTD | S$10,556,500 |
| 3 Apr 2024 | APPOINTMENT OF FMC FOR FACILITIES MAINTENANCE OF JURONG ISLAND PROPERTIES AND ESTATES FOR A PERIOD OF 3 YEARS | CTM FACILITIES MANAGEMENT PTE. LTD. | S$20,545,100 |
| 28 Mar 2024 | PROCUREMENT OF CONTACT CENTRE SERVICE FOR JTC CORPORATION | OCTOPUS8 PRIVATE LIMITED | S$1 |
| 27 Mar 2024 | 2-Year Term Contract for the Provision of Shuttle Bus Services at International Business Park | WOODLANDS TRANSPORT SERVICE PTE LTD | S$441,600 |
| 26 Mar 2024 | JTC Innovation Challenge 2023: Challenge Statement 2 - Cleaning toilets with minimal human intervention | HIVEBOTICS PTE. LTD. | S$249,800 |
| 26 Mar 2024 | JTC Innovation Challenge 2023: Challenge Statement 2 - Cleaning toilets with minimal human intervention | CLEANING ROBOTICS PTE. LTD. | S$244,000 |
| 22 Mar 2024 | CIVIL & STRUCTURAL CONSULTANCY SERVICES FOR INFRASTRUCTURE WORKS AT TUAS GATEWAY PARK | EXECUTIVE DECISIONS INC. LLP | S$13 |
| 22 Mar 2024 | PERIODIC STRUCTURAL INSPECTION WORKS AT JTC INDUSTRIAL PROPERTIES IN EAST DIVISION | FONG CONSULT PTE. LTD. | S$49,100 |
| 22 Mar 2024 | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Defu Industrial Park (Batch 2) | RECLAIMS ENTERPRISE PTE. LTD. | S$1,600,000 |
| 21 Mar 2024 | ENGAGEMENT OF SERVICES FOR AUDIO-VISUAL AND VIDEO CONFERENCING SYSTEM ENHANCEMENT WORKS FOR MINISTRY OF COMMUNICATIONS AND INFORMATION (MCI) AT OLD HILL STREET POLICE STATION LEVEL 1 COLLABORATION ROOMS AND BASEMENT 2 SITUATION OFFICE | XLT SYSTEMS PTE. LTD. | S$205,580 |
| 20 Mar 2024 | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Defu Lane and Attap Valley | SHENGJIE ENGINEERING PTE. LTD. | S$3,400,000 |
| 5 Mar 2024 | Multi-Disciplinary Consultancy Services for The Proposed New Erection Of 6 Units Of 2-Storey Standard Factories At Seletar Aerospace Link | 3PA PTE. LTD. | S$7 |
| 29 Feb 2024 | Provision of JIRA Service Management (Data Center) and Plugins Subscription with Maintenance for JTC | EASE SOLUTIONS PTE. LTD. | S$148,751 |
| 29 Feb 2024 | IFC VIEWER TRAINING FOR JTC EPIC PROCESSING AND COMMENTING OFFICERS | BIMAGE CONSULTING PTE. LTD. | S$39,600 |
| 23 Feb 2024 | Engagement of Robotics Food Delivery Services | INTERLOCK SECURITY AND INVESTIGATION SERVICES PTE LTD | S$32,000 |
| 23 Feb 2024 | Proposed Redecoration and Refurbishment Works to 55 Ayer Rajah Crescent | KJS CONSTRUCTION PTE LTD | S$4,940,827 |
| 23 Feb 2024 | Engagement of Robotics Food Delivery Services | NCS PTE. LTD. | S$132,679 |
| 15 Feb 2024 | Proposed Demolition Works at 241 Jalan Ahmad Ibrahim | HWA AIK ENGINEERING PTE. LTD. | S$298,000 |
| 8 Feb 2024 | DESIGN & BUILD SHELTERED LINKWAY BETWEEN CLEANTECH TWO BLOCKS A & B @ CLEANTECH PARK | STEEL GIANT ENGINEERING PTE. LTD. | S$325,889 |
| 7 Feb 2024 | Proposed Drain and Sewer Upgrading at Woodlands Road and Woodland Industrial Park D Street 2 | CPC CONSTRUCTION PTE. LTD. | S$20,500,888 |
| 6 Feb 2024 | 2+1 Year Term Contract for Civil Engineering Works with Design and Authorities' Submission | LANDSCAPE ENGINEERING PTE LTD | S$3 |
| 5 Feb 2024 | APPOINTMENT OF FACILITY MANAGEMENT COMPANY FOR FACILITIES MAINTENANCE OF WEST DEPARTMENT 2 PROPERTIES AND ESTATE FOR A PERIOD OF 3 YEARS | JONES LANG LASALLE PROPERTY CONSULTANTS PTE LTD | S$48,343,616 |
| 31 Jan 2024 | APPOINTMENT OF A PANEL OF MARKETING AGENTS FOR JTC INDUSTRIAL AND COMMERCIAL SPACES | EDMUND TIE & COMPANY (SEA) PTE. LTD. | S$1 |
| 31 Jan 2024 | APPOINTMENT OF A PANEL OF MARKETING AGENTS FOR JTC INDUSTRIAL AND COMMERCIAL SPACES | HUTTONS ASIA PTE. LTD. | S$1 |
| 31 Jan 2024 | APPOINTMENT OF A PANEL OF MARKETING AGENTS FOR JTC INDUSTRIAL AND COMMERCIAL SPACES | ENGIE PROPERTY SERVICES PTE. LTD. | S$1 |
| 31 Jan 2024 | APPOINTMENT OF A PANEL OF MARKETING AGENTS FOR JTC INDUSTRIAL AND COMMERCIAL SPACES | CBRE PTE. LTD. | S$2 |
| 31 Jan 2024 | APPOINTMENT OF A PANEL OF MARKETING AGENTS FOR JTC INDUSTRIAL AND COMMERCIAL SPACES | C&W SERVICES (S) PTE. LTD. | S$1 |
| 22 Jan 2024 | NOMINATED SUB-CONTRACT FOR SIGNAGE WORKS AT INTEGRATED BUSINESS PARK DEVELOPMENT ON CC1, CC2 AND CC3 AT PUNGGOL DIGITAL DISTRICT | CARATS&CO PTE. LTD. | S$2,589,555 |
| 16 Jan 2024 | CONSTRUCTION OF BACKUP SEWER CROSSINGS AT MERANTI CRESCENT, JURONG ISLAND | Unknown | S$0 |
| 11 Jan 2024 | 24 months Term Contract for Provision of Geotechnical Advisory Services | Unknown | S$0 |
| 11 Jan 2024 | PROVISION OF ELECTRIC CAR-SHARING SERVICES AT EIGHT JTC DEVELOPMENTS FOR A PERIOD OF 6 MONTHS | GETGO TECHNOLOGIES PTE. LTD. | S$1 |
| 22 Dec 2023 | Construction Of 66KV Substation At Loyang Drive North | HPC BUILDERS PTE. LTD. | S$29,520,000 |
| 21 Dec 2023 | COMPREHENSIVE MAINTENANCE FOR NON-PROPRIETARY SYSTEMS AT JURONG ISLAND CHECKPOINT AND PULAU DAMAR LAUT CHECKPOINT FOR 24 MONTHS | AEQON TJ PTE. LTD. | S$519,384 |
| 20 Dec 2023 | Consultancy Services to Carry out Feasibility Study for Solar Deployment at Properties with Technical Constraints | SMS CONSULTING ENGINEERS PTE. LTD. | S$228,000 |
| 20 Dec 2023 | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Defu Estate, Kallang Way and Wilton Close | NEO & GOH CONSTRUCTION PTE LTD | S$3,168,000 |
| 19 Dec 2023 | Provision of Geotechnical Works Instrumentation and Monitoring Services for Drain and Sewer Upgrading at Woodlands Road and Woodlands Industrial Park D Street 2 | ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | S$106,320 |
| 19 Dec 2023 | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Defu Industrial Park (Batch 1) | BENG SOON MACHINERY SERVICES (SINGAPORE) PTE LTD | S$2,618,800 |
| 18 Dec 2023 | Provision of Civil and Structural Engineering Consultancy Services for Road Widening Works at AMK Industrial Park 2 | CPG CONSULTANTS PTE LTD | S$235,431 |
| 11 Dec 2023 | Appointment of Facility Management Company for Facilities Maintenance of East Department 1 Properties for a Period of 3 Years | JONES LANG LASALLE PROPERTY CONSULTANTS PTE LTD | S$49,999,746 |
| 6 Dec 2023 | PROVISION OF MANPOWER FOR VEGETATION CLEARING SERVICES TO FACILITATE LAND SURVEYING WORKS FOR JTC CORPORATION | GIMI INTERNATIONAL PTE. LTD. | S$151,200 |
| 4 Dec 2023 | Proposed Facade Repair and Rectification ("R&R") to Block 1 to 6 of Biopolis on Lot 04932W, 04929W & 04931M Mukim 3 at North Buona Vista Drive (Queenstown Planning Area) | JINYUE ALUMINIUM ENGINEERING (SINGAPORE) PTE. LTD. | S$5,160,729 |
| 29 Nov 2023 | Jurong Eco Garden Rejuvenation Works | LANDSCAPE ENGINEERING PTE LTD | S$6,007,497 |
| 26 Nov 2023 | PROVISION OF CONSULTANCY SERVICE TO BUILD WORKPLACE SAFETY AND HEALTH CULTURE FOR JTC CONSTRUCTION PROJECTS (PHASE II) | Unknown | S$0 |
| 24 Nov 2023 | Provision of Registered Inspector Services for JTC Business Park Development and North East Line at Punggol Digital District | TRANSURBAN ASSOCIATES | S$72,000 |
| 23 Nov 2023 | Design, Supply and Installation of BMS Interface Modules for BMS Integration to the Open Digital Platform(ODP) at JTC Properties | WINSYS TECHNOLOGY PTE LTD | S$152,259 |
| 21 Nov 2023 | 2-Year Term Contract for Cadastral Surveys | SURBANA JURONG CONSULTANTS PTE. LTD. | S$2 |
| 21 Nov 2023 | 2-Year Term Contract for Cadastral Surveys | UNITED SURVEYORS PTE LTD | S$1 |
| 17 Nov 2023 | Provision of a Panel of Resource Agencies to Supply IT Contract Resources for a Period of 3 Years | BGC GROUP PTE. LTD. | S$1 |
| 17 Nov 2023 | Provision of a Panel of Resource Agencies to Supply IT Contract Resources for a Period of 3 Years | RMA CONSULTANTS PTE LTD | S$1 |
| 17 Nov 2023 | Provision of a Panel of Resource Agencies to Supply IT Contract Resources for a Period of 3 Years | RIDIK PTE. LTD. | S$1 |
| 17 Nov 2023 | Provision of a Panel of Resource Agencies to Supply IT Contract Resources for a Period of 3 Years | APBA TG HUMAN RESOURCE PTE. LTD. | S$1 |
| 17 Nov 2023 | Provision of a Panel of Resource Agencies to Supply IT Contract Resources for a Period of 3 Years | OPTIMUM SOLUTIONS (SINGAPORE) PTE LTD | S$1 |
| 17 Nov 2023 | Provision of a Panel of Resource Agencies to Supply IT Contract Resources for a Period of 3 Years | ITCAN PTE. LIMITED | S$1 |
| 10 Nov 2023 | Design, Development and Build for Proposed Ground Improvement Works at Ayer Merbau Road, Jurong Island. | KELLER FOUNDATIONS (S E ASIA) PTE. LTD. | S$5,788,000 |
| 2 Nov 2023 | 1+1 Years Term Contract for Provision of Drone Service to Support Construction Site Visual Inspections (2023) | H3 ZOOM PTE. LTD. | S$129,600 |
| 31 Oct 2023 | ENGAGEMENT OF APPLICATION MANAGED SERVICES (AMS) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) PLATFORMS IN JTC | ESRI SINGAPORE PTE. LTD. | S$4,163,000 |
| 30 Oct 2023 | Design, Development and Installation of New Chilled Water Plant Equipment at JTC Chemicals Hub | C&W SERVICES (S) PTE. LTD. | S$977,700 |
| 25 Oct 2023 | Appointment of Law Firm(s) as Strategic Legal Partner for Advisory and Dispute Resolution Services for a period of two (2) years | ALLEN & GLEDHILL LLP | S$1 |
| 25 Oct 2023 | Appointment of Law Firm(s) as Strategic Legal Partner for Advisory and Dispute Resolution Services for a period of two (2) years | RAJAH & TANN SINGAPORE LLP | S$1 |
| 25 Oct 2023 | Appointment of Law Firm(s) as Strategic Legal Partner for Advisory and Dispute Resolution Services for a period of two (2) years | TSMP LAW CORPORATION | S$1 |
| 20 Oct 2023 | 360 REALITY CAPTURE SAAS SOLUTION FOR 2 YEARS | ACE PERIPHERALS PTE. LTD. | S$1,968,817 |
| 10 Oct 2023 | 55 YEARS OF JTC INDUSTRIAL PLANNING AND ARCHITECTURE PUBLICATION | EPIGRAM BOOKS PTE. LTD. | S$354,800 |
| 3 Oct 2023 | Supply, deliver, installation and commissioning of Video Conferencing and Audio-Visual equipment to boardroom, map room, lecture room and theatrette at JTC Summit, and training room T1C and theatrette at Jurong Town Hall | 3S COMMUNICATION PTE. LTD. | S$195,525 |
| 3 Oct 2023 | SPECIALIST CONSULTANCY SERVICES FOR FEASIBILITY STUDY OF UNDERGROUND CAVERNS DEVELOPMENT AT GALI BATU | SURBANA JURONG INFRASTRUCTURE PTE. LTD. | S$2,355,000 |
| 2 Oct 2023 | PROVISION OF CIVIL & STRUCTURAL ENGINEERING CONSULTANCY SERVICES FOR LAND PLOTS PREPARATION, TRAFFIC JUNCTION MODIFICATIONS AS WELL AS CONSTRUCTION OF ROADS, DRAINS, SEWERS AND ANCILLARY WORKS AT SENGKANG WEST INDUSTRIAL ESTATE (SKWIE) | EXECUTIVE DECISIONS INC. LLP | S$6 |
| 19 Sept 2023 | PROVISION OF RESOURCES FOR ENGAGEMENT WITH CUSTOMERS TO REGULARISE BREACHES IN JTC PROPERTIES FOR A PERIOD OF 3 YEARS | C&W SERVICES (S) PTE. LTD. | S$3,080 |
| 19 Sept 2023 | PROCUREMENT OF HEWLETT PACKARD ENTERPRISE (HPE) SERVER UPGRADE | DELTEQ PTE LTD | S$81,999 |
| 13 Sept 2023 | UPGRADING OF THE CLOSED-CIRCUIT TV SYSTEM FOR THE INLAND REVENUE AUTHORITY OF SINGAPORE | FONDA GLOBAL ENGINEERING PTE. LTD. | S$349,241 |
| 7 Sept 2023 | DESIGN AND BUILD FOR RENOVATION OF NEW OFFICES AT LEVELS 3 AND 6 OF THE JTC SUMMIT | D' PERCEPTION SINGAPORE PTE. LTD. | S$1,035,506 |
| 28 Aug 2023 | Provision of Registered Inspector (Mechanical and Electrical) Services for JTC Integrated Business Park Development at Punggol Digital District | ENKON INTERNATIONAL CONSULTING ENGINEERS PTE LTD | S$32,550 |
| 24 Aug 2023 | Provision of Registered Inspector (Architectural) services for JTC integrated business Park Development at Punggol Digital District | Unknown | S$0 |
| 23 Aug 2023 | PROVISION OF CIVIL ENGINEERING CONSULTANCY SERVICES FOR SEWER UPGRADE ALONG TUAS VIEW CRESCENT | EXECUTIVE DECISIONS INC. LLP | S$6 |
| 14 Aug 2023 | 2 + 2 Years Term Contract For Specialist Consultancy Services for the Environmental Monitoring & Management Plan in Singapore | DHI WATER & ENVIRONMENT (S) PTE. LTD. | S$1 |
| 12 Aug 2023 | Appointment of Facility Management Company for Facilities Maintenance of East Department 3, Central Department 2 and West Department 1n3 Properties for a Period of 3 Years | C&W SERVICES (S) PTE. LTD. | S$61,543,578 |
| 12 Aug 2023 | Appointment of Facility Management Company for Facilities Maintenance of East Department 3, Central Department 2 and West Department 1n3 Properties for a Period of 3 Years | CBRE GWS PTE. LTD. | S$71,232,264 |
| 8 Aug 2023 | Proposed Enhancement Works at Ayer Rajah Precinct | HARFORD ENGINEERING PTE LTD | S$1,080,800 |
| 4 Aug 2023 | Management Of JTC Sand Stockpile And Monitoring Of Sand Supply | HELM MARINE (SINGAPORE) PTE. LTD. | S$3,180,160 |
| 3 Aug 2023 | ENGAGEMENT OF SERVICES FOR SUPPLY AND DELIVERY OF LED DISPLAY WALL AND UPGRADING OF AUDIOVISUAL, LIGHTING AND VIDEO CONFERENCING SYSTEM AT REVENUE HOUSE L5 AUDITORIUM AND MEDIA CONTROL ROOM | DIGIWORZ PTE. LTD. | S$166,930 |
| 1 Aug 2023 | JTC Innovation Challenge 2022:Automated Scan to BIM of existing buildings (Building and MEP Components) | MVIZN PTE. LTD. | S$250,000 |
| 26 Jul 2023 | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Tuas and Defu Lane | PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | S$2,759,800 |
| 19 Jul 2023 | Provision of Multi-Disciplinary Consultancy Services for the Development of Heavy Vehicle Parking at JTC's New Estate | ABL CONSULTANTS PTE. LTD. | S$482,000 |
| 18 Jul 2023 | Pre-Qualification (Pre-Q) To Render Construction Services for the Proposed Addition And Alteration Works And Restoration Works to Two (2) Conservation Buildings and One (1) Three-Storey Building | Unknown | S$0 |
| 7 Jul 2023 | Proposed Demolition Works at 6 Pasir Ris Farmway 1 and Substations | HAO DA PTE LTD | S$2,769,555 |
| 7 Jul 2023 | Proposed Infrastructure Works at Loyang Drive (North) | HUATIONG CONTRACTOR PTE LTD | S$18,817,806 |
| 30 Jun 2023 | A&A Works to Bedok Industrial Park E , Tampines Industrial Park A , Defu Industrial Estate and Kampong Ubi Industrial Estate | CHL CONSTRUCTION PTE LTD | S$5,130,836 |
| 30 Jun 2023 | A&A Works to Bedok Industrial Park E , Tampines Industrial Park A , Defu Industrial Estate and Kampong Ubi Industrial Estate | VIGCON CONSTRUCTION PTE LTD | S$13,543,468 |
| 28 Jun 2023 | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Genting Lane, Kallang Way and Sungei Kadut | RECLAIMS ENTERPRISE PTE. LTD. | S$1,668,649 |
| 21 Jun 2023 | Leasing for WAN Connectivity and Hardware at Jurong Island Data Centre | STARHUB LTD. | S$1,780,788 |
| 19 Jun 2023 | REPAIRS AND REFURBISHMENT WORKS AT VARIOUS JTC INDUSTRIAL ESTATES AND COMPLEXES (GROUP 3) | DN HYBRID PTE. LTD. | S$17,574,045 |
| 19 Jun 2023 | REPAIRS AND REFURBISHMENT WORKS AT VARIOUS JTC INDUSTRIAL ESTATES AND COMPLEXES (GROUP 3) | PAL-LINK CONSTRUCTION PTE. LTD. | S$9,451,948 |
| 16 Jun 2023 | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Sungei Kadut, Defu Lane and Tukang Estate | SHENGJIE ENGINEERING PTE. LTD. | S$2,200,000 |
| 14 Jun 2023 | Reinstatement Works to Factory Converted Dormitories (Batch 2) | MUTIARA (FE) PTE. LTD. | S$11,202 |
| 14 Jun 2023 | Feasibility Study For Siting New Wafer Fab Sites In JTC Industrial Estate On (I) Air Quality & Vibration, (II) Surface Runoff Quality Within Water Catchment Area, And (III) H&S Buffer To Sensitive Receptors | CH2M HILL SINGAPORE PRIVATE LIMITED | S$665,798 |
| 14 Jun 2023 | Reinstatement Works to Factory Converted Dormitories (Batch 2) | ANDERCO PTE. LTD. | S$267,600 |
| 12 Jun 2023 | 2-Year Term Contract for Provision of Integrated Digital Delivery (IDD) Managers for JTC's Building & Infrastructure Projects | ACEPLP.COM PTE LTD | S$14,500 |
| 9 Jun 2023 | PROPOSED LIFT REPLACEMENT / CONVERSION WITH 3 YEARS MAINTENANCE FOR JTC EXISTING BUILDING AT FUSIONOPOLIS 2, CHEMHUB AND OASIS @SAKRA | SCHINDLER LIFTS (SINGAPORE) PTE. LTD. | S$7,272,000 |
| 1 Jun 2023 | Study on Pollution Control of Waterfront Industrial Activities in Developed Countries | ENVIRONMENTAL RESOURCES MANAGEMENT (S) PTE LTD | S$395,000 |
| 31 May 2023 | CONSTRUCTION OF UTILITY SPECIFIC DUCTS AT TUAS WESTERN COAST | HARFORD ENGINEERING PTE LTD | S$5,428,977 |
| 29 May 2023 | PROVISION OF CONSULTANCY SERVICES FOR ENVIRONMENTAL MONITORING AND MANAGEMENT PLAN (EMMP) FOR SITE CLEARANCE AND LAND PREPARATION WORKS OF PLOT A2 AT PASIR RIS WAFER FABRICATION PARK | DHI WATER & ENVIRONMENT (S) PTE. LTD. | S$278,800 |
| 29 May 2023 | PROVISION OF TRAFFIC MANAGEMENT SYSTEM AT JURONG ISLAND CHECKPOINT | MAXI MORRIE ENGINEERING PTE. LTD. | S$1,739,000 |
| 26 May 2023 | Appointment of Panel of Valuers for the Provision of Valuation Services for JTC Corporation's Buyback of Industrial Properties for a Period of 3 Years | KNIGHT FRANK PTE LTD | S$1 |
| 26 May 2023 | Appointment of Panel of Valuers for the Provision of Valuation Services for JTC Corporation's Buyback of Industrial Properties for a Period of 3 Years | SAVILLS VALUATION AND PROFESSIONAL SERVICES (S) PTE. LTD. | S$1 |
| 26 May 2023 | Appointment of Panel of Valuers for the Provision of Valuation Services for JTC Corporation's Buyback of Industrial Properties for a Period of 3 Years | CBRE PTE. LTD. | S$1 |
| 26 May 2023 | DESIGN, SUPPLY, INSTALL AND MAINTAIN DIGITAL RETAIL DIRECTORY AND ADVERTISEMENTS DIGITAL PANELS AT FUSIONOPOLIS ONE | CARATS&CO PTE. LTD. | S$210,880 |
| 19 May 2023 | 1 + 1 YEAR TERM CONTRACT FOR RECTIFICATION WORKS TO EXISTING ROADS FOR HANDING OVER TO LTA | SWEE BUILDERS PTE LTD | S$2 |
| 19 May 2023 | 1 + 1 YEAR TERM CONTRACT FOR RECTIFICATION WORKS TO EXISTING ROADS FOR HANDING OVER TO LTA | TONG SHING CONTRACTORS PRIVATE LIMITED | S$2 |
| 18 May 2023 | PROVISION OF INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED OFF LOADING QUAY AT SERAYA, JURONG ISLAND | CAST LABORATORIES PTE LTD | S$68,800 |
| 9 May 2023 | APPOINTMENT OF EVENT ORGANISERS FOR RECREATION CENTRES: (I) CONCERTS AND CARNIVALS & (II) SPORTS TOURNAMENTS | TANTRA INCORPORATED PTE. LTD. | S$275,179 |
| 9 May 2023 | APPOINTMENT OF EVENT ORGANISERS FOR RECREATION CENTRES: (I) CONCERTS AND CARNIVALS & (II) SPORTS TOURNAMENTS | INTO E PTE. LTD. | S$686,520 |
| 9 May 2023 | APPOINTMENT OF EVENT ORGANISERS FOR RECREATION CENTRES: (I) CONCERTS AND CARNIVALS & (II) SPORTS TOURNAMENTS | JEEVASTANA ENTERTAINMENT PTE. LTD. | S$889,500 |
| 9 May 2023 | APPOINTMENT OF EVENT ORGANISERS FOR RECREATION CENTRES: (I) CONCERTS AND CARNIVALS & (II) SPORTS TOURNAMENTS | SEVEN HILLS ENTERTAINMENTS | S$1,033,869 |
| 9 May 2023 | APPOINTMENT OF EVENT ORGANISERS FOR RECREATION CENTRES: (I) CONCERTS AND CARNIVALS & (II) SPORTS TOURNAMENTS | AREINA CREATIVES PTE. LTD. | S$183,508 |
| 9 May 2023 | APPOINTMENT OF EVENT ORGANISERS FOR RECREATION CENTRES: (I) CONCERTS AND CARNIVALS & (II) SPORTS TOURNAMENTS | SOUNDBITEZ PTE. LTD. | S$712,270 |
| 9 May 2023 | APPOINTMENT OF EVENT ORGANISERS FOR RECREATION CENTRES: (I) CONCERTS AND CARNIVALS & (II) SPORTS TOURNAMENTS | SPORTYGO PTE. LTD. | S$224,679 |
| 9 May 2023 | APPOINTMENT OF EVENT ORGANISERS FOR RECREATION CENTRES: (I) CONCERTS AND CARNIVALS & (II) SPORTS TOURNAMENTS | ZOHAAR MEDIA PTE. LTD. | S$1,003,011 |
| 8 May 2023 | JTC Innovation Challenge 2022: Solution for productive construction & building defects detection | VEBITS AI PTE. LIMITED | S$216,465 |
| 5 May 2023 | Conversion of Existing Meeting Room to Multimedia Video Conferencing Room on Level 10, The Treasury Building, Singapore 179434 | TRENDBUILD CONTRACTS PTE. LTD. | S$223,815 |
| 5 May 2023 | DESIGN, DEVELOPMENT AND BUILD FOR PROPOSED TREE CLEARANCE AND LAND PREPARATION WORKS OF PLOT A2 AT PASIR RIS WAFER FABRICATION PARK | KTC CIVIL ENGINEERING & CONSTRUCTION PTE LTD | S$6,312,000 |
| 4 May 2023 | 2-YEAR TERM CONTRACT FOR PROVISION OF PE SERVICES TO CONDUCT INSPECTION AND REVIEW FOR THE SLOPES WITHIN JTC ESTATES | TERS CONSULTING PTE. LTD. | S$225,200 |
| 27 Apr 2023 | 3-YEAR TERM CONTRACT FOR PROCUREMENT OF PERSONAL PROTECTIVE EQUIPMENT (PPE) [SAFETY BOOTS AND SAFETY EYEWEAR] FOR JTC | PDS INTERNATIONAL PTE LTD | S$1 |
| 27 Apr 2023 | JTC Innovation Challenge 2022: Real time automated optimisation of air-conditioning system | CLIMATE ASIA PTE. LTD. | S$250,000 |
| 27 Apr 2023 | 3-YEAR TERM CONTRACT FOR PROCUREMENT OF PERSONAL PROTECTIVE EQUIPMENT (PPE) [SAFETY BOOTS AND SAFETY EYEWEAR] FOR JTC | FLEMINGS SAFETY PTE. LTD. | S$1 |
| 17 Apr 2023 | REPAIR & REFURBISHMENT WORKS AT VARIOUS JTC INDUSTRIAL ESTATES (GROUP 1B) | CHIONG CONSTRUCTION PTE. LTD. | S$4,087,885 |
| 17 Apr 2023 | REPAIR & REFURBISHMENT WORKS AT VARIOUS JTC INDUSTRIAL ESTATES (GROUP 1B) | QXY RESOURCES PTE. LTD. | S$19,470,400 |
| 17 Apr 2023 | Removal and Disposal of a Single Buoy Mooring (SBM) System at Sakra, Jurong Island | YENG TONG CONSTRUCTION PTE LTD | S$81,000 |
| 14 Apr 2023 | Provision of Software Licenses Maintenance for JIRA Service Management and Plugins for JTC Corporation | EASE SOLUTIONS PTE. LTD. | S$102,987 |
| 13 Apr 2023 | TO SUPPLY, IMPLEMENT, SUPPORT AND PROVIDE MAINTENANCE OF SECURITY INFORMATION AND EVENT MANAGEMENT SYSTEM | KNIT TECHNOLOGIES PTE. LTD. | S$1,121,487 |
| 6 Apr 2023 | DESIGN AND BUILD OF OFF-LOADING QUAY AT SERAYA, JURONG ISLAND | ANTARA KOH PRIVATE LIMITED | S$4,307,080 |
| 6 Apr 2023 | PROCUREMENT OF NETWORK CONNECTIVITY FOR INTERNET ACCESS AND DISASTER RECOVERY | SPTEL PTE. LTD. | S$223,302 |
| 31 Mar 2023 | 2-YEAR TERM CONTRACT FOR RESIDENT SITE SUPERVISORS FOR JTC'S BUILDING AND INFRASTRUCTURE PROJECTS (YEAR 2023 to 2025) | RCY PTE. LTD. | S$105,444 |
| 31 Mar 2023 | 2-YEAR TERM CONTRACT FOR RESIDENT SITE SUPERVISORS FOR JTC'S BUILDING AND INFRASTRUCTURE PROJECTS (YEAR 2023 to 2025) | SMM PTE. LTD. | S$99,400 |
| 30 Mar 2023 | PLACEMENT OF INSURANCE POLICIES FOR JTC'S CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS | ZURICH INSURANCE COMPANY LTD (Singapore Branch) | S$1 |
| 30 Mar 2023 | PLACEMENT OF INSURANCE POLICIES FOR JTC'S CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS | MS FIRST CAPITAL INSURANCE LIMITED | S$1 |
| 30 Mar 2023 | PLACEMENT OF INSURANCE POLICIES FOR JTC'S CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS | SOMPO INSURANCE SINGAPORE PTE. LTD. | S$1 |
| 30 Mar 2023 | JTC Innovation Challenge 2022: Chiller selection tool during the design stage | DLABS PTE. LTD. | S$250,000 |
| 30 Mar 2023 | PLACEMENT OF INSURANCE POLICIES FOR JTC'S CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS | QBE INSURANCE (SINGAPORE) PTE. LTD. | S$1 |
| 14 Mar 2023 | PROVISION OF MULTI-DISCIPLINARY CONSULTANCY SERVICES FOR ADDITIONS & ALTERATIONS OF PENJURU RECREATION CENTRE AT 27 PENJURU WALK | ARCHITECTS TEAM 3 PTE. LTD. | S$8 |
| 24 Feb 2023 | Appointment of Facilities Management Company for Facilities Maintenance of Land-based Properties for a Period of 3 years | SMM PTE. LTD. | S$34,905,825 |
| 15 Feb 2023 | Sewer Upgrading at Tuas-Pioneer Industrial Estate | AIK LEONG PLUMBING CONSTRUCTION PTE LTD | S$28,108,000 |
| 1 Feb 2023 | Provision Of Multi-Disciplinary Consultancy Services for The Proposed Addition and Alteration (A&A) Works for Block 28 Ayer Rajah Crescent | RSP ARCHITECTS PLANNERS & ENGINEERS (PTE) LTD | S$6 |
| 29 Dec 2022 | Provision of Specialist Consultancy Services for Environmental Impact Assessment (EIA) Studies at Tengah Heavy Vehicle Parking (HVP), Cleantech Park (CTP) and Bahar Estate | AECOM SINGAPORE PTE. LTD. | S$912,800 |
| 29 Dec 2022 | Procurement of privilege activity recording system (ObserveIT) software licensing support and maintenance for 2 years | ENTIIS PTE. LTD. | S$136,327 |
| 29 Dec 2022 | Provision of Specialist Consultancy Services for Environmental Impact Assessment (EIA) Studies at Tengah Heavy Vehicle Parking (HVP), Cleantech Park (CTP) and Bahar Estate | DHI WATER & ENVIRONMENT (S) PTE. LTD. | S$176,990 |
| 27 Dec 2022 | Provision of Software License Maintenance for JTC DATAHUB | IZENO PRIVATE LIMITED | S$1,093,542 |
| 19 Dec 2022 | Consultancy Services for Manpower Resource Optimisation | Ernst & Young Advisory PTE. LTD. | S$600,000 |
| 7 Dec 2022 | Provision of Quantity Surveying Consultancy Services for Renovation of New Offices at Levels 3 and 6 of The JTC Summit | D+J CONSULTANTS PTE. LTD. | S$1 |
| 5 Dec 2022 | Nominated Sub-Contract for Information Communication Technology (ICT) Systems at Integrated Business Park Development on CC1, CC2 and CC3 at Punggol Digital District | STARHUB LTD. | S$7,986,678 |
| 29 Nov 2022 | 2-YEAR TERM CONTRACT FOR THE PROVISION OF DIRECT BUS SERVICE BETWEEN LOYANG/CHANGI AREA AND NEIGHBOURING TOWNS | Unknown | S$0 |
| 28 Nov 2022 | Engagement of Services for the Research and Consultancy, System Development, Implementation, and Application Maintenance Services of Customer Service Portal (CSP) | Capgemini Singapore PTE. LTD. | S$6,886,350 |
| 11 Nov 2022 | SUPPLY AND INSTALLATION OF PARASOLS AND PICNIC BENCHES FOR JTC RECREATION CENTRES | ABSOLUT OUTDOORS PTE. LTD. | S$310,308 |
| 4 Nov 2022 | APPOINTMENT OF LAW FIRM(S) AS STRATEGIC LEGAL PARTNER FOR ARREARS MANAGEMENT SERVICES FOR A PERIOD OF THREE (3) YEARS | ADSAN LAW LLC | S$1 |
| 4 Nov 2022 | APPOINTMENT OF LAW FIRM(S) AS STRATEGIC LEGAL PARTNER FOR ARREARS MANAGEMENT SERVICES FOR A PERIOD OF THREE (3) YEARS | KELVIN CHIA PARTNERSHIP | S$1 |
| 21 Oct 2022 | Penjuru Recreation Centre - Synthetic Field Returfing, Installation of New Lightings and Resurfacing of Courtyard | SH INTEGRATED SERVICES PTE. LTD. | S$1,388,000 |
| 21 Oct 2022 | Proposed Demolition Works at 47A Jalan Buroh | RECLAIMS ENTERPRISE PTE. LTD. | S$188,000 |
| 21 Oct 2022 | APPOINTMENT OF MANAGING AGENT FOR VARIOUS ESTATES UNDER EAST DIVISION | SAVILLS PROPERTY MANAGEMENT PTE. LTD. | S$1,457,280 |
| 14 Oct 2022 | 2 YEARS TERM CONTRACT FOR PROVISION OF CONTRACTS OFFICERS | WSH EXPERTS PTE. LTD. | S$5,120 |
| 14 Oct 2022 | PROVISION OF SINGLE DISCIPLINARY CONSULTANCY SERVICES (C&S) FOR PHASE 1 SUNGEI KADUT ECO-DISTRICT INFRASTRUCTURE WORKS | Unknown | S$0 |
| 4 Oct 2022 | Proposed Site Clearance at Woodlands Wafer Fab Park | CHARTWORTH ENTERPRISE SINGAPORE PTE. LTD. | S$5,524,020 |
| 30 Sept 2022 | Reinstatement & Refurbishment (R&R) of Black and White Walk-ups and Semi-detach Houses in Wessex | QXY RESOURCES PTE. LTD. | S$15,300,000 |
| 26 Sept 2022 | 3-YEAR TERM CONTRACT FOR PROCUREMENT OF PERSONAL PROTECTIVE EQUIPMENT (PPE) [SAFETY BOOTS, SAFETY EYEWEAR, LONG SLEEVE TOP] FOR JTC STAFFS ENTERING CONSTRUCTION WORKSITES AND FACILITIES & ESTATES | FLEMINGS SAFETY PTE. LTD. | S$1 |
| 22 Sept 2022 | 2 Year Term Contract for Provision of Workplace Safety and Health Managers | GREENSAFE INTERNATIONAL PTE. LTD. | S$20,750 |
| 20 Sept 2022 | ENGAGEMENT OF SERVICES FOR REQUIREMENT STUDY, DESIGN, DEVELOPMENT, TESTING AND IMPLEMENTATION OF GIS PLATFORM ON GCC ENVIRONMENT | Capgemini Singapore PTE. LTD. | S$845,320 |
| 19 Sept 2022 | PROVISION OF AIR QUALITY MONITORING SERVICES AT WOODLANDS WAFER FAB PARK AND NORTH COAST WAFER FAB PARK | ENVIROSOLUTIONS & CONSULTING PTE. LTD. | S$303,000 |
| 19 Sept 2022 | Multi-Disciplinary Consultancy Services for the Proposed Redecoration and Refurbishment Works of Block 55 Ayer Rajah Crescent | HUAY ARCHITECTS | S$12 |
| 14 Sept 2022 | Proposed Facade Repair and Rectifications ("R&R") to Block 1 to 6 of Biopolis on Lot 04932W, 04929W & 04931M Mukim 3 at North Buona Vista Drive (Queenstown Planning Area) and The JTC Summit on Lot 08497V & 08499T Mukim 5 at Jurong Town Hall Road | PRIME STRUCTURES ENGINEERING PTE LTD | S$2,528,708 |
| 31 Aug 2022 | PLACEMENT OF INSURANCE POLICIES FOR THE OPERATION OF JURONG ROCK CAVERNS FOR A PERIOD OF ONE YEAR | MS FIRST CAPITAL INSURANCE LIMITED | S$1 |
| 24 Aug 2022 | 12 MONTHS TERM CONTRACT FOR LICENSING AND SERVICING OF ELECTRICAL INSTALLATION AT VARIOUS JTC INDUSTRIAL ESTATES | PROPELL INTEGRATED PTE LTD | S$452,514 |
| 16 Aug 2022 | Proposed Demolition Works at 1 Pasir Ris Coast Industrial Park 1, 70 Pasir Ris Farmway 1, 63 Pasir Ris Farmway 3 and Substation | HWA AIK ENGINEERING PTE. LTD. | S$1,858,000 |
| 15 Aug 2022 | 24/7 CALL CENTER OPERATION FOR JTC ESSENTIAL SERVICES CENTRE | CPG FACILITIES MANAGEMENT PTE LTD | S$98,126 |
| 12 Aug 2022 | Provision of Civil & Structural Engineering Consultancy Services for Road Widening and Sewer & Drain Upgrading Works at Kolam Ayer Industrial Estate | EXECUTIVE DECISIONS INC. LLP | S$5 |
| 29 Jul 2022 | Appointment of Insurance Broker for a Period of 3 Years | HOWDEN INSURANCE BROKERS (S.) PTE. LIMITED | S$2 |
| 29 Jul 2022 | Multi-Disciplinary Consultancy Services for the Site Specific Engineering Study for Climate Change Adaptation Planning for Jurong Island | CH2M HILL SINGAPORE PRIVATE LIMITED | S$10,314,861 |
| 28 Jul 2022 | Provision of Accredited Checking Organisation and Accredited Checker(Geotechnical) Services for Construction of Infrastructure Works at Bulim (Phase 2) | MEINHARDT (SINGAPORE) PTE LTD | S$668,500 |
| 22 Jul 2022 | PROVISION OF EARTHING SPECIALIST CONSULTANCY SERVICES FOR PROPOSED 66kV SUBSTATION AT LOYANG DRIVE NORTH | HY M&E CONSULTANCY SERVICES PTE. LTD. | S$45,000 |
| 21 Jul 2022 | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Sungei Kadut, Kranji Loop and Defu Lane | HWA AIK ENGINEERING PTE. LTD. | S$1,787,000 |
| 21 Jul 2022 | MULTI-DISCIPLINARY CONSULTANCY SERVICES FOR PROPOSED REPAIRS AND REFURBISHMENT WORKS AT JURONG ISLAND (JI) CHECKPOINT, JURONG PIER ROAD JETTY AND ACCESS ROADS TO PULAU DAMAR LAUT (PDL) | OGP KONSULT PTE. LTD. | S$196,008 |
| 19 Jul 2022 | APPOINTMENT OF FACILITY MANAGEMENT COMPANY FOR THE PROVISION OF FACILITIES MAINTENANCE SERVICES TO COCHRANE RECREATION CENTRE FOR A PERIOD OF 2 YEARS & 7 MONTHS | CTM FACILITIES MANAGEMENT PTE. LTD. | S$2,710,770 |
| 14 Jul 2022 | Sewer Upgrading at Benoi-Gul Industrial Estate | AIK LEONG PLUMBING CONSTRUCTION PTE LTD | S$22,490,000 |
| 14 Jul 2022 | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | AIK SUN DEMOLITION & ENGINEERING PTE LTD | S$1 |
| 14 Jul 2022 | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | S$1 |
| 14 Jul 2022 | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | BENG SOON MACHINERY SERVICES (SINGAPORE) PTE LTD | S$1 |
| 14 Jul 2022 | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | HAO DA PTE LTD | S$0 |
| 14 Jul 2022 | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | HWA AIK ENGINEERING PTE. LTD. | S$1 |
| 14 Jul 2022 | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | NEO & GOH CONSTRUCTION PTE LTD | S$0 |
| 14 Jul 2022 | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | RECLAIMS ENTERPRISE PTE. LTD. | S$1 |
| 14 Jul 2022 | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | SHENGJIE ENGINEERING PTE. LTD. | S$0 |
| 13 Jul 2022 | Jurong Island Renewable Energy Request for Proposal | TUAS POWER LTD | S$2,144,274 |
| 13 Jul 2022 | TERM CONTRACT FOR ARBORICULTURE, HORTICULTURE & TURF WORKS MAINTENANCE TO JTC PROPERTIES AND LAND (EAST) FOR A PERIOD OF 1 YEAR | MAO SHENG QUANJI CONSTRUCTION PTE LTD | S$351,600 |
| 13 Jul 2022 | Jurong Island Renewable Energy Request for Proposal | VFLOWTECH PTE. LTD. | S$2,096,300 |
| 13 Jul 2022 | Jurong Island Renewable Energy Request for Proposal | KEPPEL ENERGY NEXUS PTE. LTD. | S$900,000 |
| 13 Jul 2022 | PROPOSED REPAIR & REFURBISHMENT WORKS AT TOA PAYOH INDUSTRIAL PARK | KJS CONSTRUCTION PTE LTD | S$7,868,443 |
| 8 Jul 2022 | Appointment of Facilities Management Company for Facilities Maintenance of East Department 2 Properties for a Period of 3 Years | JONES LANG LASALLE PROPERTY CONSULTANTS PTE LTD | S$37,027,685 |
| 4 Jul 2022 | LAND PREPARATION AND SOIL IMPROVEMENT WORKS AT NORTH COAST WAFER FABRICATION PARK | Unknown | S$0 |
| 21 Jun 2022 | Engagement of Services for the Implementation and Maintenance of Secure Electronic Signature (SES) Digital Signature System | FUJIFILM BUSINESS INNOVATION SINGAPORE PTE. LTD. | S$357,812 |
| 16 Jun 2022 | Specialist Consultancy Services for Environmental Impact Studies at Woodlands North Coast (WNC) | DHI WATER & ENVIRONMENT (S) PTE. LTD. | S$435,500 |
| 15 Jun 2022 | Proposed Demolition Works at 241 Jalan Ahmad Ibrahim | LEONG HIN SENG CIVIL ENGINEERING PTE LTD | S$419,000 |
| 15 Jun 2022 | Appointment of Specialist Professional Engineer(s) to Perform Inspections for Lifts in all JTC Properties | TUV SUD PSB PTE. LTD. | S$1 |
| 13 Jun 2022 | 2+1 Year Term Contract for Minor Civil Engineering Works | SWEE BUILDERS PTE LTD | S$3 |
| 13 Jun 2022 | 2+1 Year Term Contract for Minor Civil Engineering Works | TONG SHING CONTRACTORS PRIVATE LIMITED | S$3 |
| 9 Jun 2022 | 2-Year Term Contract for the Provision of Storage and Records Management Services | FREIGHT LINKS EXPRESS ARCHIVERS PTE LTD | S$144,000 |
| 6 Jun 2022 | Request For Proposal Of Automated Site Verification Tool For Site Inspection | VEBITS AI PTE. LIMITED | S$89,080 |
| 2 Jun 2022 | Proposed Additions & Alterations to Eating House at 71 Tuas Avenue 1 | KJS CONSTRUCTION PTE LTD | S$886,976 |
| 2 Jun 2022 | Provision Of Multi-Disciplinary Consultancy Services For The Regularisation Of Fire Safety Works (R&R) To Existing Fusionopolis 1 Building | ZARCH COLLABORATIVES PTE. LTD. | S$9 |
| 1 Jun 2022 | 2-YEAR TERM CONTRACT FOR PROVISION OF HORTICULTURE SERVICES AT JURONG ISLAND CHECKPOINT | BSG LANDSCAPE & CONSTRUCTION PTE. LTD. | S$47,030 |
| 23 May 2022 | PROPOSED REINSTATEMENT OF VACANT UNIT AT BLK 16 DEFU LANE 10 #01-374 AND REPAIR/STRENGTHEN THE EXISTING STRUCTURE FOR BOTH UNITS #01-372 (OCCUPIED UNIT) AND #01-374 AND PROPOSED RECONSTRUCTION AND REPAIR WORKS TO BLK 1081 EUNOS AVE 7 FIRE AFFECTED UNIT #01-170 & #01-172 | DING SHENG ENGINEERING PTE LTD | S$651,380 |
| 13 May 2022 | 2-Year Term Contract for Geophysical and Survey Works for JTC Estates | RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | S$1 |
| 13 May 2022 | 2-Year Term Contract for Geophysical and Survey Works for JTC Estates | SOIL INVESTIGATION PTE. LIMITED | S$1 |
| 10 May 2022 | Appointment of a Panel of Photography Service Providers for JTC Properties and Events | ZINKIE AW PHOTOGRAPHY AND DESIGN | S$1 |
| 10 May 2022 | Provision of Psychometric Assessments for a Period of 2 Years | TALOGY (SINGAPORE) PTE. LTD. | S$40,000 |
| 29 Apr 2022 | Provision of Software Licenses Maintenance for JIRA Service Management and Plugins for JTC Corporation | EASE SOLUTIONS PTE. LTD. | S$110,534 |
| 22 Apr 2022 | TERM CONTRACT FOR PROVISION OF CONSTRUCTION QUALITY INSPECTOR TEAM (CQIT) FOR CONDUCTING QUALITY INSPECTIONS TO VARIOUS CONSTRUCTION PROJECTS FOR A PERIOD OF 2 YEARS + 1 YEAR (OPTIONAL) | Unknown | S$0 |
| 11 Apr 2022 | Proposed Infrastructure Works at Tuas South Coast and Tuas South View Avenue 14 Extension | GOH SIN GUAN HUAT PTE LTD | S$18,888,000 |
| 6 Apr 2022 | PROVISION OF CONSULTANCY SERVICES FOR RECLAMATION AT LORONG HALUS | AECOM SINGAPORE PTE. LTD. | S$2,750,000 |
| 5 Apr 2022 | 24 MONTHS TERM CONTRACT FOR PROVISION OF ENVIRONMENTAL ADVISORY SERVICES (YEAR 2022) | AECOM SINGAPORE PTE. LTD. | S$426,500 |
| 31 Mar 2022 | Engagement of Services for the System Development, Implementation, and Application Maintenance Services of ATLAS for JTC | HCL SINGAPORE PTE. LTD. | S$3,430,011 |
| 31 Mar 2022 | Provision of Security & Blast Consultancy Services for 66kV Substation at Loyang Drive North | BETH-EL (ASIA PACIFIC) PTE. LTD. | S$160,000 |
| 22 Mar 2022 | 1-Year Term Contract for the Provision of Shuttle Bus Services at International Business Park | KHIM SEAH ENTERPRISE PTE. LTD. | S$110,250 |
| 21 Mar 2022 | Provision of Design Services, Publication and Production of JTC55 Commemorative Book | EPIGRAM BOOKS PTE. LTD. | S$226,000 |
| 17 Mar 2022 | Provision of Unarmed Security Manpower Services and Systems at Jurong Island for a Period of 5 Years | PROSEGUR SINGAPORE PTE. LTD. | S$38,825,507 |
| 17 Mar 2022 | Provision of Armed Security Manpower Services at Jurong Island for a period of 5 years | AETOS SECURITY MANAGEMENT PTE. LTD. | S$37,030,980 |
| 15 Mar 2022 | 3-Year Term Contract for Engineering Surveys | YJP SURVEYORS PTE LTD | S$2 |
| 15 Mar 2022 | 3-Year Term Contract for Engineering Surveys | CAK & FG SURVEY PTE. LTD. | S$1 |
| 10 Mar 2022 | NSC for Building Management System at Integrated Business Park Development on CC1, CC2 and CC3 at PDD | SIEMENS PTE. LTD. | S$4,131,109 |
| 9 Feb 2022 | Appointment of Facilities Management Company for Facilities Maintenance of Central Department 1 Properties for a Period of 3 Years | C&W SERVICES (S) PTE. LTD. | S$62,505,135 |
| 28 Jan 2022 | Provision of Single Disciplinary Consultancy Services (Civil & Structural Engineering) for Land Preparation and Infrastructure Works at Woodlands Wafer Fabrication Park (WFP) | ABL CONSULTANTS PTE. LTD. | S$4 |
| 28 Jan 2022 | Engagement of services for the provision of vulnerability and compliance management solution for JTC for 3 years | ENSIGN INFOSECURITY (SMARTTECH) PTE. LTD. | S$477,880 |
| 26 Jan 2022 | Provision of Professional Engineering Services to conduct Landfill Gas Study And Sampling Study at Lorong Halus | AECOM SINGAPORE PTE. LTD. | S$335,000 |
| 25 Jan 2022 | ENGAGEMENT OF SERVICES FOR THE SUPPLY, MIGRATION, IMPLEMENTATION AND APPLICATION MANAGEMENT SERVICES OF DOCUMENT MANAGEMENT SYSTEM 2.0 (DMS 2.0) FOR JTC | FUJITSU ASIA PTE LTD | S$4,794,669 |
| 14 Jan 2022 | 18 MONTHS TERM CONTRACT FOR MAINTENANCE OF WATER PUMPING SYSTEM, POTABLE WATER SERVICE INSTALLATION AND WATER TANK CLEANING AT VARIOUS JTC INDUSTRIAL ESTATES | AQUAFORCE PRIVATE LIMITED | S$243,253 |
| 10 Jan 2022 | PROVISION OF ENVIRONMENTAL SUSTAINABLE DESIGN (ESD) CONSULTANCY SERVICES FOR WIND DRIVEN RAIN (WDR) SIMULATION AND FACADE TYPOLOGIES STUDIES FOR JTC DEVELOPMENTS | MOTT MACDONALD SINGAPORE PTE LIMITED | S$298,000 |
| 6 Jan 2022 | JTC's TERM CONTRACT TENDER FOR RENDERING OF TRAFFIC AND TRANSPORT CONSULTANCY SERVICES FOR A PERIOD OF 2 YEARS | CPG CONSULTANTS PTE LTD | S$3 |
| 5 Jan 2022 | APPOINTMENT OF STATUTORY AUDITOR FOR JTC CORPORATION FOR FINANCIAL YEAR ENDING 31 MARCH 2023 WITH OPTION(S) FOR FURTHER APPOINTMENT FOR FINANCIAL YEARS ENDING 31 MARCH 2024, 2025, 2026, 2027, 2028 AND 2029 | ERNST & YOUNG LLP | S$1 |
| 30 Dec 2021 | Provision of Software License Maintenance for JTC Datahub | IZENO PRIVATE LIMITED | S$347,173 |
| 21 Dec 2021 | PERIODIC STRUCTURAL INSPECTION AT VARIOUS JTC PROPERTIES | STERLING ENGINEERS PTE. LTD. | S$39,100 |
| 21 Dec 2021 | PERIODIC STRUCTURAL INSPECTION AT VARIOUS JTC PROPERTIES | FONG CONSULT PTE. LTD. | S$239,400 |
| 17 Dec 2021 | SUPPLY, DELIVERY AND MAINTENANCE OF WEBPAGE DEFACEMENT DETECTION AND AUTO-REPLACEMENT SOLUTION ON GCC | NCS PTE. LTD. | S$223,753 |
| 6 Dec 2021 | 2-YEAR TERM CONTRACT FOR PROVISION OF ON-DEMAND BUS SERVICE AT ONE-NORTH | SWAT MOBILITY PTE. LTD. | S$718,740 |
| 3 Dec 2021 | APPOINTMENT OF FACILITY MANAGEMENT COMPANY FOR FACILITIES MAINTENANCE OF CENTRAL DEPARTMENT 3 PROPERTIES FOR A PERIOD OF 3 YEARS | CBRE GWS PTE. LTD. | S$31,333,827 |
| 17 Nov 2021 | Nominated Sub-Contract for Integrated Security Management System at Integrated Business Park Development on CC1, CC2 and CC3 at Punggol Digital District | O'CONNOR'S SINGAPORE PTE LTD | S$2,736,663 |
| 9 Nov 2021 | TERM CONTRACTS FOR FACTORY UNIT REINSTATEMENT WORKS AT VARIOUS JTC INDUSTRIAL PROPERTIES UNDER CENTRAL & EAST ZONES FOR ONE YEAR | ESPIRIT BUILDING & ENGINEERING PTE. LTD. | S$1 |
| 9 Nov 2021 | TERM CONTRACTS FOR FACTORY UNIT REINSTATEMENT WORKS AT VARIOUS JTC INDUSTRIAL PROPERTIES UNDER CENTRAL & EAST ZONES FOR ONE YEAR | KJS CONSTRUCTION PTE LTD | S$1 |
| 28 Oct 2021 | Insurance Contracts for JTC's Work Injury Compensation, Group Personal Accident and Group Term Life Insurance Programme for a Period of 2 years | ZURICH INSURANCE COMPANY LTD (Singapore Branch) | S$1 |
| 28 Oct 2021 | Insurance Contracts for JTC's Work Injury Compensation, Group Personal Accident and Group Term Life Insurance Programme for a Period of 2 years | SINGAPORE LIFE LTD. | S$1 |
| 28 Oct 2021 | Insurance Contracts for JTC's Work Injury Compensation, Group Personal Accident and Group Term Life Insurance Programme for a Period of 2 years | TOKIO MARINE INSURANCE SINGAPORE LTD. | S$1 |
| 28 Oct 2021 | PROVISION OF MANPOWER FOR VEGETATION CLEARING SERVICES TO FACILITATE LAND SURVEYING WORKS FOR JTC CORPORATION | WSH EXPERTS PTE. LTD. | S$169,200 |
| 27 Oct 2021 | Provision of Security Manpower Services for JTC Properties at Eastern Part of Singapore | CONCORDE SECURITY PTE. LTD. | S$547,650 |
| 11 Oct 2021 | 2-YEAR TERM CONTRACT FOR CLEANING AND CONSERVANCY SERVICES AT VARIOUS JTC INDUSTRIAL ESTATES INCLUDING VACANT LANDS AND ROADS | LS 2 SERVICES PTE LTD | S$11,388,000 |
| 11 Oct 2021 | 2-YEAR TERM CONTRACT FOR CLEANING AND CONSERVANCY SERVICES AT VARIOUS JTC INDUSTRIAL ESTATES INCLUDING VACANT LANDS AND ROADS | 800 SUPER WASTE MANAGEMENT PTE LTD | S$6,202,302 |
| 5 Oct 2021 | Additions & Alterations to Symbiosis Level 21 Office at No.3 Fusionopolis Way | Unknown | S$0 |
| 1 Oct 2021 | Provision of Internal Audit Services for 3 Years | KPMG SERVICES PTE. LTD. | S$505,500 |
| 29 Sept 2021 | Provision of Single Disciplinary Consultancy Services (Civil & Structural Engineering) for Proposed Infrastructure Works at Loyang Drive (North) | EXECUTIVE DECISIONS INC. LLP | S$5 |
| 28 Sept 2021 | MARINE ENVIRONMENTAL IMPACT ASSESSMENT AND SHIP HANDLING STUDY AT LORONG HALUS | DHI WATER & ENVIRONMENT (S) PTE. LTD. | S$1,998,888 |
| 28 Sept 2021 | Soil Investigation and Survey works at Lorong Halus (along Serangoon Harbour) | GEONAMICS (S) PTE LTD | S$1,939,678 |
| 27 Sept 2021 | JTC Innovation Challenge - Phase 1: Automation and Productivity | Tongji University | S$240,000 |
| 27 Sept 2021 | JTC Innovation Challenge - Phase 1: Automation and Productivity | VEBITS AI PTE. LIMITED | S$248,231 |
| 27 Sept 2021 | JTC Innovation Challenge - Phase 1: Automation and Productivity | KPMG SERVICES PTE. LTD. | S$245,780 |
| 27 Sept 2021 | JTC Innovation Challenge - Phase 1: Automation and Productivity | TRANSFORMA ROBOTICS PTE. LTD. | S$233,200 |
| 27 Sept 2021 | JTC Innovation Challenge - Phase 1: Automation and Productivity | VULCAN AI PTE. LTD. | S$246,000 |
| 13 Sept 2021 | Reinstatement Works to Factory Converted Dormitories | SMM PTE. LTD. | S$266,500 |
| 13 Sept 2021 | Reinstatement Works to Factory Converted Dormitories | ACEPROJECT CONSTRUCTION PTE. LTD. | S$258,861 |
| 9 Sept 2021 | PROPOSED REPAIRS AND REFURBISHMENT WORKS TO TERRACE WORKSHOPS AT TOA PAYOH INDUSTRIAL PARK BLOCK 11, INCLUDING BACKYARD RECONSTRUCTION | HD CONTRACTOR PTE. LTD. | S$1,912,827 |
| 31 Aug 2021 | JTC innovation Challenge - Phase 3: Sustainability And Resilience | SINGAPORE INSTITUTE OF TECHNOLOGY | S$245,160 |
| 31 Aug 2021 | JTC innovation Challenge - Phase 3: Sustainability And Resilience | NATIONAL UNIVERSITY OF SINGAPORE | S$229,358 |
| 31 Aug 2021 | JTC innovation Challenge - Phase 3: Sustainability And Resilience | QUANTIFIED ENERGY LABS PTE. LTD. | S$220,000 |
| 26 Aug 2021 | 2-YEAR TERM CONTRACT FOR COMPREHENSIVE MAINTENANCE OF NON-PROPRIETARY SECURITY SYSTEMS AT JURONG ISLAND CHECKPOINT AND PULAU DAMAR LAUT CHECKPOINT | AEQON TJ PTE. LTD. | S$539,400 |
| 6 Aug 2021 | Engagement of Consultancy Services for Finance Data Analytics | KPMG SERVICES PTE. LTD. | S$100,000 |
| 29 Jul 2021 | APPOINTMENT OF A PANEL OF AUTHORISED EXAMINER FOR LIFT CONDITION ASSESSMENT AND AUDIT FOR THE PROPERTIES UNDER JTC CORPORATION | Unknown | S$0 |
| 28 Jul 2021 | PROPOSED REPAIR & REDECORATION WORKS AT BEDOK INDUSTRIAL ESTATE | QXY RESOURCES PTE. LTD. | S$27,517,400 |
| 23 Jul 2021 | Appointment of FMC to provide Start-up Operations and Maintenance Services for new developments for a period of 3 years | CBRE GWS PTE. LTD. | S$9,282,782 |
| 21 Jul 2021 | Provision of Maintenance Contract for IT Equipment | NCS PTE. LTD. | S$2,911,632 |
| 15 Jul 2021 | PROVISION OF MANAGED MEDICAL HEALTHCARE SERVICE TO JTC CORPORATION | INTEGRATED HEALTH PLANS PTE LTD | S$1 |
| 14 Jul 2021 | Provision of VMWARE Licenses renewal and support services | NCS PTE. LTD. | S$726,665 |
| 13 Jul 2021 | APPLICATION MANAGEMENT SERVICES FOR DOCUMENT MANAGEMENT SYSTEM (DMS) FOR JTC | WIPRO NETWORKS PTE. LIMITED | S$910,000 |
| 9 Jul 2021 | PROPOSED CONSTRUCTION OF (A) DLN RAMP AND ASSOCIATED FACILITY BUILDINGS AND (B) ROAD TUNNEL LINKING BAHAR TO BULIM (PART 1) | CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED Singapore Branch | S$135,000,000 |
| 2 Jul 2021 | NOMINATED SUB-CONTRACT FOR STRUCTURED CABLING SYSTEM AT INTEGRATED BUSINESS PARK DEVELOPMENT ON CC1, CC2 AND CC3 AT PUNGGOL DIGITAL DISTRICT | EQUATION TECHNOLOGY & CABLING PTE LTD | S$2,305,748 |
| 28 Jun 2021 | Civil & Structural Consultancy Services to Support Ad-Hoc Intensification at Neythal Road | EXECUTIVE DECISIONS INC. LLP | S$5 |
| 23 Jun 2021 | PROVISION OF CONSULTANCY SERVICE TO BUILD WORKPLACE SAFETY AND HEALTH CULTURE FOR JTC CONSTRUCTION PROJECTS | JMJ ASSOCIATES ASIA PACIFIC (PTE.) LTD. | S$435,000 |
| 17 Jun 2021 | Provision of Multi-Disciplinary Consultancy Services for Repairs & Refurbishment Works at Eating Houses at 101 Pandan Loop and 71 Tuas Avenue 1 | FOMA ARCHITECTS LLP | S$41 |
| 9 Jun 2021 | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | CORNERSTONE GLOBAL PARTNERS PTE. LTD. | S$1 |
| 9 Jun 2021 | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | ARCHER RECRUITMENT PTE. LTD. | S$1 |
| 9 Jun 2021 | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | GOOD JOB CREATIONS (SINGAPORE) PTE. LTD. | S$1 |
| 9 Jun 2021 | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | GLOBAL SEARCH PARTNERS PTE. LTD. | S$1 |
| 9 Jun 2021 | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | EPS CONSULTANTS PTE LTD | S$1 |
| 9 Jun 2021 | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | DYNAMIC HUMAN CAPITAL PTE. LTD. | S$1 |
| 9 Jun 2021 | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | IRTISH CONSULTING PTE. LTD. | S$1 |
| 9 Jun 2021 | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | MANPOWER STAFFING SERVICES (SINGAPORE) PTE LTD | S$1 |
| 9 Jun 2021 | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | RGF TALENT SOLUTIONS SINGAPORE PTE. LTD. | S$1 |
| 9 Jun 2021 | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | RMA CONSULTANTS PTE LTD | S$1 |
| 7 Jun 2021 | 3-Year Term Contract for the Maintenance of Submersible Pumps and Ancillary Electrical System at Jurong Island Roadlink | Unknown | S$0 |
| 25 May 2021 | TWO (2) YEARS TERM CONTRACT FOR MAINTENANCE OF FIRE PROTECTION SYSTEMS AT JTC PROPERTIES | DIGI ENGINEERING PTE. LTD. | S$373,773 |
| 21 May 2021 | Provision of Facial Recognition Access Control with 2 Years Maintenance at JTC Summit | OES TECHNOLOGY PTE. LTD. | S$179,400 |
| 19 May 2021 | 2-YEAR TERM CONTRACT FOR THE PROVISION OF SHUTTLE BUS SERVICE AT SELETAR AEROSPACE PARK AND CLEANTECH PARK | AEDGE HOLDINGS PTE. LTD. | S$591,888 |
| 18 May 2021 | Construction of Roads, Drains, Sewers and Ancillary Works at Tuas link 4 / Tuas Link Drive | BAN CHON CORPORATION & TRADING PTE LTD | S$4,798,000 |
| 18 May 2021 | TWO (2) YEARS TERM CONTRACT FOR MAINTENANCE OF FIRE PROTECTION SYSTEMS AT AMK AUTOPOINT, AMK TECH 2, AMK TECHLINK, YS-ONE AND SIN MING AUTOCARE | RHYTHME TECHNOLOGY PTE LTD | S$487,680 |
| 10 May 2021 | APPOINTMENT OF DORMITORY OPERATOR AT JTC TEMPORARY DORMITORIES AND COMMUNITY CARE FACILITIES | TS GROUP PTE. LTD. | S$1 |
| 4 May 2021 | Appointment of a Media Monitoring Agency for JTC Corporation | Unknown | S$0 |
| 27 Apr 2021 | PROPOSED INSTRUMENTATION AND MONITORING WORKS FOR (A) DLN RAMP AND ASSOCIATED FACILITY BUILDINGS AND (B) ROAD TUNNEL LINKING BAHAR TO BULIM (PART 1) | RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | S$557,000 |
| 27 Apr 2021 | ENGAGEMENT OF CONSULTANCY SERVICES FOR INTERNATIONAL INDUSTRIAL LAND BENCHMARKING STUDY | CUSHMAN & WAKEFIELD VHS PTE. LTD. | S$1 |
| 26 Apr 2021 | PROVISION OF AUTOMATED BARRIER SYSTEM AT JURONG ISLAND CHECKPOINT | MAXI MORRIE ENGINEERING PTE. LTD. | S$431,836 |
| 14 Apr 2021 | Provision of Consultancy Services For Proposed Reinstatement Works To Eunos Fire Affected Unit And Structural Repairs To Two (2) Units At Defu Industrial Estate | DESIGN METABOLISTS | S$18 |
| 13 Apr 2021 | Design, Development And Fit Out Proposed Data Centre With 5 + 5 Years Maintenance At No. 81 Jurong Island Highway | ST ENGINEERING CLOUD AND DATA CENTRE SOLUTIONS PTE. LTD. | S$6,552,775 |
| 6 Apr 2021 | Additions & Alterations to Symbiosis Level 21 Office at No. 3 Fusionopolis Way | Unknown | S$0 |