← All suppliers
CH2M HILL SINGAPORE PRIVATE LIMITED
- Wins
- 16
- Total value
- S$223.9M
- Median value
- S$4.5M
- First / last win
- 8 Oct 2021 – 30 Mar 2026
Agencies served
- Public Utilities Board13
- Jurong Town Corporation2
- National Parks Board1
Award history
| Date | Description | Agency | Amount |
|---|---|---|---|
| 30 Mar 2026 | Professional Engineering Services for Proposed Sewers in Turf Club Area, Woodlands Avenue 7 and 10 Areas and Bukit Batok Road Area | Public Utilities Board | S$6,518,888 |
| 23 Feb 2026 | Professional Engineering Services for Rehabilitation of Sewerage Network Phase 6 - Big Diameter and Small Diameter Sewers Islandwide | Public Utilities Board | S$6,498,888 |
| 21 Apr 2025 | Professional Engineering Services for Proposed 1600 mm diameter NEWater Pipeline from Tampines Expressway to Pasir Ris Industrial Drive 1 | Public Utilities Board | S$1,888,888 |
| 18 Mar 2025 | Professional Engineering Services for Improvement to Bukit Timah Canal (Maple Avenue to Queen's Road) | Public Utilities Board | S$13,668,888 |
| 29 Mar 2024 | Professional Engineering Services for Rehabilitation of Sewerage Network Phase 6 - Southern Zone | Public Utilities Board | S$6,122,388 |
| 15 Mar 2024 | Professional Engineering Services for the Development of New Kranji Water Reclamation Plant | Public Utilities Board | S$146,948,888 |
| 5 Feb 2024 | Professional Engineering Services for Improvement to Stirling Road Outlet Drain (Queensway to Alexandra Canal) with ABC Waters Enhancement | Public Utilities Board | S$3,128,888 |
| 11 Jan 2024 | Professional Engineering Services for Investigation/Inspection and Rehabilitation Works of Pumping Mains for Sewerage Network Phase 6 | Public Utilities Board | S$3,298,888 |
| 24 Oct 2023 | Consultancy Services for Code Of Practice and the Determination of the Safety Corridor for Coastal Protection Measures and Dam/Dyke Structures | Public Utilities Board | S$4,938,888 |
| 14 Jun 2023 | Feasibility Study For Siting New Wafer Fab Sites In JTC Industrial Estate On (I) Air Quality & Vibration, (II) Surface Runoff Quality Within Water Catchment Area, And (III) H&S Buffer To Sensitive Receptors | Jurong Town Corporation | S$665,798 |
| 11 May 2023 | Professional Engineering Services for Proposed 800/900mm diameter water pipeline along Kranji Way and Sungei Kadut Drive | Public Utilities Board | S$4,138,888 |
| 24 Apr 2023 | APPOINTMENT OF A PANEL OF CONSULTANTS FOR THE PROVISION OF ENVIRONMENTAL CONSULTATION SERVICES FOR A PERIOD OF THREE (3) YEARS | National Parks Board | S$1,621,273 |
| 16 Dec 2022 | Professional Engineering Services for the Feasibility Study of Coastal Barriers for the Southwest Coast of Singapore | Public Utilities Board | S$2,399,888 |
| 13 Dec 2022 | Professional Engineering Services for Improvement of Bedok First Subsidiary Drain (Bedok Reservoir Road to Bedok North Avenue 3) with ABC Waters Enhancements | Public Utilities Board | S$2,938,888 |
| 29 Jul 2022 | Multi-Disciplinary Consultancy Services for the Site Specific Engineering Study for Climate Change Adaptation Planning for Jurong Island | Jurong Town Corporation | S$10,314,861 |
| 8 Oct 2021 | Professional Engineering Services for the Development of Changi Greasy Waste and Food Waste Treatment Facilities | Public Utilities Board | S$8,784,500 |