← All agencies
Housing and Development Board
- Tenders
- 1107
- Total value
- S$33.4B
- Median value
- S$250K
- Suppliers
- 614
Top suppliers
- Unknown22
Recent awards
| Date | Description | Winner | Amount |
|---|---|---|---|
| 31 Mar 2026 | ELECTRICAL LOAD UPGRADING PROGRAMME (ELUP) BATCH 3 PROJECT 1 WEST ZONE | STRATEGIC ENGINEERING & CONSTRUCTION PTE. LTD. | S$32,880,000 |
| 31 Mar 2026 | PROVISION OF SECURITY SERVICES AT HDB HUB | CONCORDE SECURITY PTE. LTD. | S$943,770 |
| 31 Mar 2026 | Term Contract for Provision of Technical Officers and Computer (Hardware and Software) System for Building Inspections and Construction Audits at New Construction Sites | LANDMARK ASIA PACIFIC PTE. LTD. | S$3,412 |
| 25 Mar 2026 | PROVISION TO MANAGE PRIMARY HEALTHCARE SERVICES FOR HDB STAFF FOR A PERIOD OF THREE YEARS | RAFFLES MEDICAL GROUP LTD | S$54 |
| 25 Mar 2026 | LEASING OF CLOUD BUILDING MANAGEMENT SYSTEM, CCTV SYSTEM, VIDEO ANALYTICS SOLUTION, FOOTFALL COUNTERS AND MOBILE DEVICES | UNIVERS PTE. LTD. | S$458,268 |
| 25 Mar 2026 | FIRE INSURANCE COVERAGE FOR HDB PROPERTIES FOR THE PERIOD 1 APRIL 2026 TO 31 MARCH 2029 | WILLY INSURANCE BROKERS PTE. LTD. | S$2,985,000 |
| 25 Mar 2026 | Mechanical And Electrical Cyclical Improvement Works To Multi-Storey Car Parks (Batch 37) | SPECIALIST ELECTRIC PTE LTD | S$4,495,800 |
| 20 Mar 2026 | DESIGN AND RENOVATION WORKS FOR HDB HOLIDAY BUNGALOWS | 5 LANDMARK CONSTRUCTION PTE. LTD. | S$605,950 |
| 20 Mar 2026 | THIRTY-SEVENTH TERM CONTRACT FOR THE SUPPLY, DELIVERY, INSTALLATION AND MAINTENANCE OF LIFTS FOR THREE-YEAR PERIOD | HITACHI ELEVATOR ASIA PTE. LTD. | S$20,982,055 |
| 19 Mar 2026 | Part A: Realignment of Sewer at Ang Mo Kio Avenue 2; Part B: Construction of Bus Shelters along Sumang Lane | GOOD LINK ENGINEERING & CONSTRUCTION PTE. LTD. | S$1,600,000 |
| 18 Mar 2026 | DESIGN AND RENOVATION WORKS TO THE MEZZANINE LEVEL AND LIFT LOBBIES OF HDB CENTRE OF BUILDING RESEARCH (CBR) | ASPACIO DESIGN ASSOCIATES PTE LTD | S$967,636 |
| 17 Mar 2026 | Supply Of Ordinary Portland Cement To The HDB (Batch 60) | LCS PTE. LTD. | S$88 |
| 17 Mar 2026 | PART A: BUILDING WORKS AT PROJECT DI (TOTAL: 193 DWELLING UNITS); PART B: CONTINGENCY WORKS | RIGHT CONSTRUCTION PTE LTD | S$61,000,000 |
| 17 Mar 2026 | PROJECT 1: PART A: BUILDING WORKS AT PROJECT GC (TOTAL: 637 DWELLING UNITS); PART B: CONTINGENCY WORKS. PROJECT 2 : PART A: BUILDING WORKS AT PROJECT EB (TOTAL: 255 DWELLING UNITS); PART B: CONTINGENCY WORKS | H P CONSTRUCTION & ENGINEERING PTE LTD | S$211,800,000 |
| 13 Mar 2026 | Infrastructure Works at Kallang Whampoa (Phase 2) | HAO DA PTE LTD | S$9,548,709 |
| 11 Mar 2026 | TERM CONTRACT FOR TESTING SERVICES ON PAINTS | ELEMENT CONSTRUCTION TESTING (S) PTE. LTD. | S$12,462 |
| 6 Mar 2026 | TERM CONTRACT FOR THE PRODUCTION, SUPPLY AND DELIVERY OF PRECAST HOUSEHOLD SHELTER (PHS) TO VARIOUS HDB BUILDING SITES (BATCH 1) | HL BUILDING MATERIALS PTE. LTD. | S$2,022 |
| 6 Mar 2026 | TERM CONTRACT FOR THE PRODUCTION, SUPPLY AND DELIVERY OF PRECAST HOUSEHOLD SHELTER (PHS) TO VARIOUS HDB BUILDING SITES (BATCH 2) | INTEGRATED PRECAST SOLUTIONS PTE. LTD. | S$2,097 |
| 6 Mar 2026 | Infrastructure Works at Yishun Contract No. 3 | SING TEC DEVELOPMENT PTE. LTD. | S$24,900,000 |
| 6 Mar 2026 | Term Contract for the Provision of Testing Services for Semi-Destructive and Non-Destructive Tests on HDB Buildings (Batch 19) | SETSCO SERVICES PTE LTD | S$161 |
| 4 Mar 2026 | MAJOR INFRASTRUCTURE AND CONSTRUCTION OF ROAD RELATED FACILITIES AT WOODLANDS TOWN N9. (A) CONSTRUCTION OF WOODLANDS NORTH LINK; (B) CONSTRUCTION OF WOODLANDS NORTH ROAD PT1 & RETAINING WALL; (C) CONSTRUCTION OF TRUNK SEWER AT WOODLANDS N9; (D) DRAIN UPGRADING AT ADMIRALTY ROAD; (E) CONSTRUCTION OF COVERED LINKWAY AT WOODLANDS NORTH; (F) CONSTRUCTION OF BUS SHELTER AT WOODLANDS NORTH. | AVENUE ENGINEERING PTE. LTD. | S$58,700,000 |
| 2 Mar 2026 | SPECIALIST ACCREDITED CHECKING SERVICES FOR MOUNT PLEASANT C5-C6 | CPG CONSULTANTS PTE LTD | S$60,000 |
| 27 Feb 2026 | MANAGEMENT AND MAINTENANCE OF HDB PROPERTIES FOR A PERIOD OF 3 YEARS (2026 TO 2029) | INDUSTRIAL & COMMERCIAL FACILITIES MANAGEMENT PTE. LTD. | S$5,600 |
| 27 Feb 2026 | MULTI-DISCIPLINARY (CIVIL & STRUCTURAL ENGINEERING AND QUANTITY SURVEYING) CONSULTANCY SERVICES FOR VARIOUS DEMOLITION PROJECTS (BATCH 33) | EXECUTIVE DECISIONS INC. LLP | S$285,000 |
| 12 Feb 2026 | SPECIALIST ACCREDITED CHECKING SERVICES FOR MOUNT PLEASANT C1-C4 | PH CONSULTING PTE. LTD. | S$56,660 |
| 12 Feb 2026 | Supply of 20MM Aggregate to the HDB (Batch 97) | SAMWOH RESOURCES PTE LTD | S$23 |
| 12 Feb 2026 | PROVISION OF DOCUMENT MANAGEMENT SERVICES (SECTOR 1) | Unknown | S$0 |
| 12 Feb 2026 | PROVISION OF DOCUMENT MANAGEMENT SERVICES (SECTOR 2) | Unknown | S$0 |
| 11 Feb 2026 | CONSTRUCTION OF ROAD RELATED FACILITIES (RRF) AT TENGAH TOWN (PHASE 4) | LANDSCAPE ENGINEERING PTE LTD | S$6,248,988 |
| 10 Feb 2026 | DEMOLITION WORKS FOR PROJECT A (Batch 30) | HI-TACT SOLUTIONS & TRADING PTE. LTD. | S$2,195,000 |
| 5 Feb 2026 | Provision of Management Services (Contract 17) | AAE-CFM PTE. LTD. | S$15,980 |
| 4 Feb 2026 | PROVISION OF TRANSPORT IMPACT ASSESSMENT CONSULTANCY SERVICES FOR NORTH PLANNING AREA | TTS GROUP PTE. LTD. | S$110,650 |
| 3 Feb 2026 | Development of Building Information Modelling Models for HDB's Modularised Unit Layouts and Components | ACEPLP.COM PTE LTD | S$65,800 |
| 2 Feb 2026 | (A) Construction of Trunk Sewer at Jurong East N4; (B) Construction of Trunk Sewer at Clementi N4 | JIN CHOON CIVIL ENGINEERING PTE. LTD. | S$8,645,730 |
| 2 Feb 2026 | DESIGN AND RECONFIGURATION WORKS FOR OFFICE SPACE AT EAST WING, LEVEL 12 OF HDB HUB | MASON MILLER PTE. LTD. | S$614,839 |
| 26 Jan 2026 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | BELMACS PTE LTD | S$11,260 |
| 26 Jan 2026 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | LT&T AVID ARCHITECTS PTE. LTD. | S$16,341 |
| 22 Jan 2026 | Supply of Fine Aggregates to the HDB (Batch 87) | PROSPAQ GROUP PTE. LTD. | S$27 |
| 19 Jan 2026 | ADDITION AND ALTERATION (A&A) WORKS FOR HDB CORPORATE FLOORS (HDB HUB) | HD CONTRACTOR PTE. LTD. | S$3,199,000 |
| 14 Jan 2026 | Demolition Works for Project B (Batch 31) | HWA AIK ENGINEERING PTE. LTD. | S$555,000 |
| 14 Jan 2026 | PROPOSED ADDITION AND ALTERATION WORKS TO EXISTING MND COMPLEX | SUNRAY WOODCRAFT CONSTRUCTION PTE LTD | S$37,477,500 |
| 12 Jan 2026 | DESIGN, SUPPLY, INSTALLATION AND OPERATION OF ENVIRONMENTAL SENSORS TO EVALUATE EFFECTIVENESS OF MARKET AVAILABLE COOLING APPLIANCES IN HDB UNITS | WETEC PTE. LTD. | S$78,459 |
| 9 Jan 2026 | PROJECT 1: (A) DESIGN & BUILD OF UPGRADING PROJECTS FOR G35F; (B) CONTINGENCY WORKS. PROJECT 2: EASE FOR PRIVATE HOUSING (NORTH EAST ZONE - PACKAGE 2) | HEPTACON CONSTRUCTION PTE. LTD. | S$42,380,000 |
| 9 Jan 2026 | Periodic Structural Inspection and Related Works at Various HDB Estates (Batch 47A-2025/26/27) | FONG CONSULT PTE. LTD. | S$710 |
| 9 Jan 2026 | PROJECT 1: (A) DESIGN & BUILD OF UPGRADING PROJECTS FOR G35C; (B) CONTINGENCY WORKS. PROJECT 2: EASE FOR PRIVATE HOUSING (CENTRAL ZONE - PACKAGE 2) | CHUAN LIM CONSTRUCTION PTE LTD | S$36,335,356 |
| 9 Jan 2026 | PROJECT 1: A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G35A; B) CONTINGENCY WORKS. PROJECT 2: ENHANCEMENT FOR ACTIVE SENIORS (EASE) FOR PRIVATE HOUSING (SOUTH EAST ZONE - PACKAGE 1) | SCT CONSTRUCTION PTE. LTD. | S$43,088,900 |
| 9 Jan 2026 | PROJECT 1: A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G35H; B) CONTINGENCY WORKS. PROJECT 2: ENHANCEMENT FOR ACTIVE SENIORS (EASE) FOR PRIVATE HOUSING (SOUTH EAST ZONE - PACKAGE 2) | HTC CONSTRUCTION PTE. LTD. | S$39,970,000 |
| 9 Jan 2026 | PROJECT 1: A) DESIGN & BUILD OF UPGRADING PROJECTS FOR G35D; B) CONTINGENCY WORKS. PROJECT 2: ENHANCEMENT FOR ACTIVE SENIORS (EASE) FOR PRIVATE HOUSING (NORTH EAST ZONE - PACKAGE 1) | PROGRESSIVE BUILDERS PRIVATE LIMITED | S$36,300,000 |
| 9 Jan 2026 | PROJECT 1: (A) DESIGN & BUILD OF UPGRADING PROJECTS FOR G35E; (B) CONTINGENCY WORKS. PROJECT 2: EASE FOR PRIVATE HOUSING (NORTH WEST & SOUTH WEST ZONE - PACKAGE 1) | W'RAY CONSTRUCTION PTE. LTD. | S$40,966,012 |
| 9 Jan 2026 | PROJECT 1: A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G35B B) CONTINGENCY WORKS PROJECT 2: ENHANCEMENT FOR ACTIVE SENIORS (EASE) FOR PRIVATE HOUSING (CENTRAL ZONE - PACKAGE 1) | TRUST-BUILD ENGINEERING & CONSTRUCTION PTE. LTD. | S$37,508,028 |
| 9 Jan 2026 | PROJECT 1: (A) DESIGN & BUILD OF UPGRADING PROJECTS FOR G35G; (B) CONTINGENCY WORKS. PROJECT 2: EASE FOR PRIVATE HOUSING (NORTH WEST & SOUTH WEST ZONE - PACKAGE 2) | HI-TEK CONSTRUCTION PTE. LTD. | S$31,600,000 |
| 7 Jan 2026 | APPOINTMENT OF SITE SUPERVISORS FOR DEMOLITION OF QUICK BUILT DORMITORIES AT 5A, 7A, 11A CHOA CHU KANG GROVE AND 10A EUNOS ROAD 1 | WIDE WINGS PTE. LTD. | S$29,996 |
| 6 Jan 2026 | REMAKING OUR HEARTLAND BATCH 4 - PARK UPGRADING PROGRAMME IN CHOA CHU KANG AND QUEENSTOWN TOWN | FONG YUE DEVELOPMENT PTE. LTD. | S$8,022,000 |
| 6 Jan 2026 | Term Contract for the Provision of Testing Services for Semi- Destructive and Non-Destructive Tests on HDB Buildings (Batch 17) | SETSCO SERVICES PTE LTD | S$145 |
| 31 Dec 2025 | SUPPLY AND DELIVERY OF ENVELOPES TO HDB FOR A PERIOD OF 2 YEARS (YEAR 2026 TO 2028) | NANYANG ENVPAP PTE. LTD. | S$3 |
| 31 Dec 2025 | PROCUREMENT OF CONSULTANCY SERVICES FOR HDB'S SUSTAINABILITY REPORT FOR FY2025 AND FY2026 | ERNST & YOUNG LLP | S$278,000 |
| 30 Dec 2025 | Supply Of Ordinary Portland Cement To The HDB (Batch 59) | LCS PTE. LTD. | S$73 |
| 30 Dec 2025 | Demolition Works to HDB Quick Built Dorms at 5A, 7A, 11A Choa Chu Kang Grove and 10A Eunos Road 1 | SATIATE CONSTRUCTION (S) PTE. LTD. | S$1,783,519 |
| 26 Dec 2025 | ELECTRICAL LOAD UPGRADING PROGRAMME (ELUP) BATCH 3 PROJECT 3 (EAST ZONE) | THONG HUAT BROTHERS (PTE) LIMITED | S$25,800,000 |
| 26 Dec 2025 | Trunk Sewer at Lorong 1 Toa Payoh | XING YUAN CIVIL ENGINEERING & BUILDING PTE. LTD. | S$2,680,000 |
| 26 Dec 2025 | DEMOLITION WORKS FOR PROJECT A (BATCH 31) | BENG HENG ENGINEERING PTE LTD | S$2,399,000 |
| 24 Dec 2025 | Engagement of Drone Service Provider to Carry Out Facade Audit Inspection on Residential Properties - Batch 2 | TNJ CONSULTANTS & PARTNERS PTE. LTD. | S$1,943 |
| 23 Dec 2025 | Mechanical and Electrical Cyclical Improvement Works to Multi-Storey Car Parks (Batch 36) | SPECIALIST ELECTRIC PTE LTD | S$3,658,000 |
| 23 Dec 2025 | Periodic Structural Inspection and Related Works at Various HDB Estates (Batch 46A-2025/26/27) | TSM C&S CONSULTANTS PTE. LTD. | S$680 |
| 22 Dec 2025 | Mechanical and Electrical Cyclical Improvement Works to Multi-Storey Car Parks (Batch 31). | WTS ENGINEERING (M&E) PTE. LTD. | S$6,560,000 |
| 22 Dec 2025 | Term Contract for the Provision of Testing Services for Semi- Destructive and Non-Destructive Tests on HDB Buildings (Batch 18) | SETSCO SERVICES PTE LTD | S$141 |
| 22 Dec 2025 | PROVISION OF CONSULTANCY SERVICES FOR FILE PLAN REVIEW FOR THE HOUSING & DEVELOPMENT BOARD | LIBRARY & ARCHIVES SOLUTIONS PTE. LTD. | S$456,500 |
| 19 Dec 2025 | Periodic Structural Inspection and Related Works at Various HDB Estates (Batch 45A-2025/26/27) | OCTA CONSULTANTS PTE. LTD. | S$780 |
| 19 Dec 2025 | IMPROVEMENT WORKS TO MECHANICAL AND ELECTRICAL SYSTEMS AT HDB MANAGED PROPERTIES | LCE ENGINEERING PTE LTD | S$4,364,189 |
| 18 Dec 2025 | MULTI-DISCIPLINARY (CIVIL & STRUCTURAL ENGINEERING AND QUANTITY SURVEYING) CONSULTANCY SERVICES FOR VARIOUS DEMOLITION PROJECTS (BATCH 32) | EXECUTIVE DECISIONS INC. LLP | S$505,000 |
| 17 Dec 2025 | Supply of 20mm Aggregate To The HDB (Batch 96) | SAMWOH RESOURCES PTE LTD | S$23 |
| 16 Dec 2025 | PROVISION OF SERVICES TO CARRY OUT PERIODIC FACADE INSPECTION FOR HDB MULTI-STOREY CAR PARKS (BATCH 4) AND (BATCH 5) | CAGA CONSULTANTS PTE. LTD. | S$3,250 |
| 16 Dec 2025 | PROVISION OF SERVICES TO CARRY OUT PERIODIC FACADE INSPECTION FOR HDB MULTI-STOREY CAR PARKS (BATCH 4) AND (BATCH 5) | BM BUILDING PTE LTD | S$3,050 |
| 11 Dec 2025 | PROVISION OF TRANSPORT IMPACT ASSESSMENT CONSULTANCY SERVICES AT QUEENSTOWN AREA | TTS GROUP PTE. LTD. | S$54,650 |
| 11 Dec 2025 | PROVISION OF MANAGEMENT AND MAINTENANCE SERVICES FOR STOREY SHELTERS (YEAR 2026 TO 2029) | AIK SAN CONSTRUCTION PTE LTD | S$4,718 |
| 5 Dec 2025 | Proposed Demolition, Earthworks & Drain Construction at St Wilfred Road | HO CHOON TRANSPORT & CONSTRUCTION PTE LTD | S$2,175,000 |
| 4 Dec 2025 | SUBSCRIPTION OF ENTERPRISE WEB ANALYTICS SOFTWARE | Unknown | S$0 |
| 2 Dec 2025 | Construction of Sewer at Queensway Estate (Part 2) | MEIZHUAN BUILDERS PTE LTD | S$5,479,500 |
| 28 Nov 2025 | Demolition Works for Project D (Batch 29) | RECLAIMS ENTERPRISE PTE. LTD. | S$1,172,000 |
| 28 Nov 2025 | Site Clearance and Earthworks (PT 1) at Woodlands N1 | PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | S$8,667,000 |
| 28 Nov 2025 | PART A: BUILDING WORKS AT PROJECT CR (TOTAL: 588 DWELLING UNITS); PART B: CONTINGENCY WORKS | VICO CONSTRUCTION PTE. LTD. | S$146,700,000 |
| 28 Nov 2025 | PART A : BUILDING WORKS AT PROJECT DN (TOTAL: 1,052 DWELLING UNITS); PART B : CONTINGENCY WORKS | NEWCON BUILDERS PTE. LTD. | S$265,380,000 |
| 24 Nov 2025 | ADDITION & ALTERATION WORKS TO GREENRIDGE SHOPPING CENTRE | GLOBALPOINT FAR EAST PTE. LTD. | S$8,500,000 |
| 24 Nov 2025 | (A) Road Improvement Works at Woodgrove Avenue and Construction of New Cul-De-Sac Road; (B) Construction of Bus Shelters along Woodgrove Avenue; (C) Construction of Trunk Sewer at Woodgrove Avenue | ANG TONG SENG BROTHERS ENTERPRISES PTE LTD | S$10,698,000 |
| 20 Nov 2025 | SUPPLY AND DELIVERY OF RADIO FREQUENCY IDENTIFICATION (RFID) TAGS TO HDB ENGINEERING MATERIALS LABORATORY (BATCH 3) | DRAGON CONSTRUCTION PTE. LTD. | S$0 |
| 17 Nov 2025 | Supply of Fine Aggregates to the HDB (Batch 86) | ORIENT NATURAL RESOURCES PTE. LTD. | S$26 |
| 17 Nov 2025 | Instrumentation Monitoring Services for (A) Realignment of Drain in Tengah Town, (B) Construction of Road and Drain at Plantation Walk, (C) Construction of Trunk Sewer at Plantation Walk, (D) Site Preparation Works at Tengah Town (Phase 6), (E) Construction of Outlet Drains at Tengah Town (Phase 3) | RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | S$24,057 |
| 17 Nov 2025 | SPECIALIST ACCREDITED CHECKING SERVICES FOR PROJECT BH AND PROJECT BI | TERS CONSULTING PTE. LTD. | S$177,520 |
| 14 Nov 2025 | INSTRUMENTATION AND MONITORING WORKS FOR MAJOR INFRASTRUCTURE WORKS AT SEMBAWANG (CONTRACT 1) | GEOAPPLICATION ENGINEERS PTE. LTD. | S$37,953 |
| 14 Nov 2025 | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM(PWCS) AT PROJECT EW & FM | STREAM ENVIRONMENT (S) PTE. LTD. | S$4,648,000 |
| 14 Nov 2025 | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT PROJECT FB & FA | ENVAC SINGAPORE PTE. LTD. | S$5,266,000 |
| 14 Nov 2025 | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT PROJECT EG & EH | PV VACUUM ENGINEERING PTE LTD | S$4,781,913 |
| 13 Nov 2025 | PROVISION OF SERVICES FOR THE DETECTION OF UNDERGROUND SERVICES FOR THE PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT DT | CABLES & UTILITIES DETECTION SERVICES PTE LTD | S$15,600 |
| 11 Nov 2025 | TERM CONTRACT FOR FABRICATION, SUPPLY, DELIVERY AND INSTALLATION OF POWDER COATED ALUMINIUM FIXED PANELS (BATCH 11) | Unknown | S$0 |
| 11 Nov 2025 | PROVISION OF INTEGRATED FACILITIES MANAGEMENT SERVICES TO COMMERCIAL PROPERTIES (SECTOR 3) | CPG FACILITIES MANAGEMENT PTE LTD | S$1,218,989 |
| 7 Nov 2025 | ADDITIONS AND ALTERATIONS TO LIFT LOBBIES AND COLLABORATION SPACES AT HDB HUB | HD CONTRACTOR PTE. LTD. | S$4,295,450 |
| 6 Nov 2025 | PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS WITHIN HDB FLATS FOR A PERIOD OF THREE YEARS (NORTH-EAST ZONE) | DIGO CORPORATION PTE. LTD. | S$689,698 |
| 6 Nov 2025 | PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS WITHIN HDB FLATS FOR A PERIOD OF THREE YEARS (CENTRAL ZONE) | KIM YEW INTEGRATED PTE. LTD. | S$636,218 |
| 6 Nov 2025 | PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS WITHIN HDB FLATS FOR A PERIOD OF THREE YEARS (EAST ZONE) | DIGO CORPORATION PTE. LTD. | S$702,238 |
| 6 Nov 2025 | PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS WITHIN HDB FLATS FOR A PERIOD OF THREE YEARS (NORTH ZONE) | CTM FACILITIES MANAGEMENT PTE. LTD. | S$669,589 |
| 6 Nov 2025 | PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS WITHIN HDB FLATS FOR A PERIOD OF THREE YEARS (WEST ZONE) | KIM YEW INTEGRATED PTE. LTD. | S$636,301 |
| 4 Nov 2025 | IMPROVEMENT WORKS WITH ENHANCEMENT OF FIRE PROTECTION SYSTEM AT SEMBAWANG MART | NEW HORIZON DEVELOPMENT PTE LTD | S$399,000 |
| 31 Oct 2025 | PART A: BUILDING WORKS AT PROJECT CH (TOTAL: 1,421 DWELLING UNITS); PART B: CONTINGENCY WORKS | VICO CONSTRUCTION PTE. LTD. | S$303,270,000 |
| 31 Oct 2025 | PART A: BUILDING WORKS AT PROJECT FK (TOTAL: 1,358 DWELLING UNITS); PART B: CONTINGENCY WORKS | BHCC CONSTRUCTION PTE. LTD. | S$340,988,000 |
| 31 Oct 2025 | PART A: BUILDING WORKS AT PROJECT DM (TOTAL: 1,021 DWELLING UNITS); PART B: CONTINGENCY WORKS | HEXACON CONSTRUCTION PTE LTD | S$231,800,000 |
| 31 Oct 2025 | (A) REALIGNMENT OF DRAIN IN TENGAH TOWN; (B) CONSTRUCTION OF ROAD AND DRAIN AT PLANTATION WALK; (C) CONSTRUCTION OF TRUNK SEWER AT PLANTATION WALK; (D) SITE PREPARATION WORKS AT TENGAH TOWN (PHASE 6); (E) CONSTRUCTION OF OUTLET DRAINS AT TENGAH TOWN (PHASE 3) | AVENUE ENGINEERING PTE. LTD. | S$17,600,000 |
| 31 Oct 2025 | Mechanical And Electrical Cyclical Improvement Works To Multi-Storey Car Parks (Batch 35) | SPECIALIST ELECTRIC PTE LTD | S$3,568,000 |
| 30 Oct 2025 | INSTRUMENTATION AND MONITORING WORKS INCLUDING AUTOMATED TUNNEL MONITORING SYSTEM FOR PROJECT GB | ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | S$335,063 |
| 30 Oct 2025 | Supply of 20MM Aggregate to the HDB (Batch 95) | HL BUILDING MATERIALS PTE. LTD. | S$24 |
| 27 Oct 2025 | Renewal of Citrix Licenses | TRANSCEND SOLUTIONS PTE. LTD. | S$4,163 |
| 24 Oct 2025 | Proposed Site Preparation Works in the Central Region | CHUAN LIM CONSTRUCTION PTE LTD | S$36,200,000 |
| 24 Oct 2025 | Supply Of Ordinary Portland Cement To The HDB (Batch 58) | LCS PTE. LTD. | S$70 |
| 23 Oct 2025 | Improvement Works To Columns At Pre And Post War Flats Using Fibre Reinforce Polymer | FIBRWRAP CONSTRUCTION PTE. LTD. | S$51 |
| 21 Oct 2025 | PRODUCTION OF 360 DEGREES VIRTUAL TOURS FOR HDB COMMUNITY EVENTS FOR 24 MONTHS | SILVERSEA MEDIA (S) PTE. LTD. | S$44,050 |
| 21 Oct 2025 | PROVISION OF INTERNET ACCESS CONNECTIONS AND SERVICES | LGA TELECOM PTE LTD | S$7,840 |
| 17 Oct 2025 | Major infrastructure works at Sembawang (Contract 1) | CHYE JOO CONSTRUCTION PTE LTD | S$114,607,663 |
| 17 Oct 2025 | SPECIALIST ACCREDITED CHECKING (GEOTECHNICAL) SERVICES FOR COASTAL WORKS AT PROPOSED DEVELOPMENT | TERS CONSULTING PTE. LTD. | S$301,280 |
| 16 Oct 2025 | PROVISION OF RESIDENT TECHNICAL OFFICER TO SUPERVISE ADDITION & ALTERATION WORKS AT GEK POH SHOPPING CENTRE | CROWN ASSOCIATES PRIVATE LIMITED | S$3,500 |
| 16 Oct 2025 | PROVISION OF RESIDENT ENGINEER TO SUPERVISE ADDITION & ALTERATION WORKS AT GEK POH SHOPPING CENTRE | CROWN ASSOCIATES PRIVATE LIMITED | S$4,000 |
| 9 Oct 2025 | PROVISION, OPERATION AND MAINTENANCE OF ON-SITE FOOD WASTE TREATMENT SYSTEM FOR HDB COMMERCIAL COMPLEXES FOR A PERIOD OF THREE (3) YEARS | 800 SUPER WASTE MANAGEMENT PTE LTD | S$113,800 |
| 7 Oct 2025 | Mechanical And Electrical Cyclical Improvement Works To Multi-Storey Car Parks (Batch 34) | Unknown | S$0 |
| 6 Oct 2025 | (A) Repair and Reconstruction Works along Yishun Avenue 8; (B) Water Mains Diversion along Sembawang Road & Infrastructure Works along Yishun Avenue 8 | ENG XIAN CONSTRUCTION PTE LTD | S$3,464,850 |
| 3 Oct 2025 | TERM CONTRACT FOR DESIGN, PREPARATION AND PACKAGING OF CONTENT FOR USE IN WEBSITES | WIZVISION PTE. LTD. | S$1,950 |
| 30 Sept 2025 | IMPROVEMENT WORKS TO SURFACE CAR PARKS (BATCH 83) | RIGHT CONSTRUCTION PTE LTD | S$21,368,000 |
| 30 Sept 2025 | PART A: BUILDING WORKS AT WOODLANDS NEIGHBOURHOOD 9 CONTRACT 10 (TOTAL 862 DWELLING UNITS); PART B: CONTINGENCY WORKS | QINGJIAN INTERNATIONAL (SOUTH PACIFIC) GROUP DEVELOPMENT CO., PTE. LTD. | S$225,600,000 |
| 30 Sept 2025 | PART A: BUILDING WORKS AT WOODLANDS NEIGHBOURHOOD 9 CONTRACT 9 (TOTAL 835 DWELLING UNITS); PART B: CONTINGENCY WORKS | RICH CONSTRUCTION COMPANY PTE. LTD. | S$222,800,000 |
| 30 Sept 2025 | Part A: Building Works at Project CQ (Total 925 Dwelling Units); Part B: Contingency Works. | SANCHOON BUILDERS PTE LTD | S$202,168,000 |
| 30 Sept 2025 | PART A: BUILDING WORKS AT PROJECT CL & PARK (TOTAL: 777 DWELLING UNITS); PART B: CONTINGENCY WORKS | EXPAND CONSTRUCTION PTE LTD | S$216,000,000 |
| 30 Sept 2025 | Part A: Building Works at Project CX (Total 551 Dwelling Units) and Project CY (Total 809 Dwelling Units); Part B: Contingency Works | CHIP ENG SENG CONTRACTORS (1988) PTE LTD | S$328,368,000 |
| 30 Sept 2025 | PART A: BUILDING WORKS AT PROJECT CS (TOTAL 775 DWELLING UNITS); PART B: CONTINGENCY WORKS | DEBENHO PTE LTD | S$183,000,000 |
| 29 Sept 2025 | ACCREDITED CHECKING SERVICES FOR COASTAL WORKS AT PROPOSED DEVELOPMENT | FONG CONSULT PTE. LTD. | S$710,000 |
| 26 Sept 2025 | Appointment of Credit Rating Agency for Provision of Credit Rating Services | MOODY'S INVESTORS SERVICE SINGAPORE PTE. LTD. | S$197,280 |
| 22 Sept 2025 | Provision of Managing Agent Services and Maintenance Works for a Period of Three Years (North Zone) | ST ENGINEERING SYNTHESIS PTE. LTD. | S$129,479 |
| 22 Sept 2025 | Provision of Managing Agent Services and Maintenance Works for a Period of Three Years (West Zone) | KNIGHT FRANK PROPERTY & FACILITIES MANAGEMENT PTE. LTD. | S$139,799 |
| 22 Sept 2025 | Provision of Managing Agent Services and Maintenance Works for a Period of Three Years (Central Zone - 1) | CHIONG CONSTRUCTION PTE. LTD. | S$140,800 |
| 22 Sept 2025 | Provision of Managing Agent Services and Maintenance Works for a Period of Three Years (Central Zone - 2) | DIGO CORPORATION PTE. LTD. | S$177,800 |
| 22 Sept 2025 | Provision of Managing Agent Services and Maintenance Works for a Period of Three Years (East Zone) | CTM FACILITIES MANAGEMENT PTE. LTD. | S$130,519 |
| 22 Sept 2025 | Provision of Managing Agent Services and Maintenance Works for a Period of Three Years (North-East Zone) | SAVILLS PROPERTY MANAGEMENT PTE. LTD. | S$171,604 |
| 19 Sept 2025 | ACCREDITED CHECKER ORGANISATION (ACO) SERVICES FOR MAJOR INFRASTRUCTURE WORKS AT SEMBAWANG NEIGHBOURHOOD 4 (CONTRACT 1) | ECAS CONSULTANTS PTE. LTD. | S$85,000 |
| 19 Sept 2025 | Major Infrastructure at Redhill Close and Jalan Bukit Merah | TONG SHING CONTRACTORS PRIVATE LIMITED | S$21,866,488 |
| 16 Sept 2025 | IMPROVEMENT WORKS TO BASEMENT ROOMS AT HDB HUB | LINCOTRADE & ASSOCIATES PTE LTD | S$5,788,888 |
| 15 Sept 2025 | RENEWAL AND PURCHASE OF NEW TRICENTIS TOSCA SOFTWARE LICENSES | NCS PTE. LTD. | S$112,458 |
| 15 Sept 2025 | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT FF | GEOREALTIME PTE. LTD. | S$449,800 |
| 11 Sept 2025 | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT DM AND PROJECT DN | RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | S$146,011 |
| 10 Sept 2025 | MAINTENANCE AND ENHANCEMENTS TO EXISTING GREEN ROOFS (Batch 3) | CTM LANDSCAPE PTE. LTD. | S$4,419 |
| 5 Sept 2025 | Construction of Trunk Sewer Along Jalan Tenteram & Jalan Bahagia | HENG SHENG CONSTRUCTION & ENGINEERING PTE. LTD. | S$2,450,000 |
| 5 Sept 2025 | Repair Services including the Replacement of Parts to the Overhead and Gantry Cranes and Production Equipment at HDB Centre of Building Research | EXCEL MARINE & ENGINEERING PTE. LTD. | S$144,435 |
| 5 Sept 2025 | Periodic Structural Inspection and related works at various HDB estates (Batch 44-2025/26/27) | CAGA CONSULTANTS PTE. LTD. | S$2,725 |
| 4 Sept 2025 | PROVISION OF PRINTING, MAILING AND RELATED WORKS (C2/FY25) | Toppan Next Tech PTE. LTD. | S$5,078 |
| 4 Sept 2025 | PROVISION OF PRINTING, MAILING AND RELATED WORKS (C1/FY25) | DATAPOST PTE LTD | S$8,361 |
| 3 Sept 2025 | Renewal Of Software License And Maintenance Of Firewall Policy Management System (FPMS) | AMNET TECHNOLOGY PTE LTD | S$123,500 |
| 29 Aug 2025 | PART A: BUILDING WORKS AT PROJECT EP (TOTAL: 638 DWELLING UNITS); PART B: CONTINGENCY WORKS | PROGRESSIVE BUILDERS PRIVATE LIMITED | S$187,450,000 |
| 26 Aug 2025 | MAINTENANCE OF EXHIBITION SPACE AT MYNICEHOME GALLERY | PICO ART INTERNATIONAL PTE. LTD. | S$5,735 |
| 25 Aug 2025 | (A) CONSTRUCTION OF ROADS AND ROADSIDE DRAINS WITHIN TENGAH TOWN (PHASE 5A); (B) CONSTRUCTION OF TRUNK SEWERS AT TENGAH TOWN (PHASE 5A); (C) CONSTRUCTION OF UTILITIES SERVICES DUCT AT TENGAH TOWN (PHASE 5A) | KTC CIVIL ENGINEERING & CONSTRUCTION PTE LTD | S$29,000,000 |
| 15 Aug 2025 | TERM CONTRACT FOR FABRICATION, SUPPLY, DELIVERY AND INSTALLATION OF POWDER COATED ALUMINIUM FIXED PANELS (BATCH 10) | HONG YING CONSTRUCTION AND ENGINEERING PTE. LTD. | S$1,840 |
| 13 Aug 2025 | Maintenance of HDB LIVINGSPACE Gallery | TRINAX PRIVATE LIMITED | S$7,000 |
| 12 Aug 2025 | APPOINTMENT OF AUDITOR FOR THE AUDIT OF ANNUAL FINANCIAL STATEMENTS AND OTHER SERVICES | KPMG LLP | S$786,118 |
| 11 Aug 2025 | Periodic Structural Inspection and related Works at various HDB Estates (Batch 42-2025/26/27) | JIB SPECIALIST CONSULTANTS PTE. LTD. | S$2,330 |
| 11 Aug 2025 | Periodic Structural Inspection and related works at various HDB estates (Batch 43-2025/26/27) | CAGA CONSULTANTS PTE. LTD. | S$2,725 |
| 11 Aug 2025 | Additions and Alteration Works at Yew Tee Square | GLOBALPOINT FAR EAST PTE. LTD. | S$7,335,000 |
| 11 Aug 2025 | Periodic Structural Inspection and related works at various HDB Estates (Batch 41-2025/26/27) | JIB SPECIALIST CONSULTANTS PTE. LTD. | S$2,440 |
| 11 Aug 2025 | Periodic Structural Inspection and Related Works at Various HDB Estates (Batch 40-2025/26/27) | BUREAU VERITAS BUILDINGS & INFRASTRUCTURE PTE. LTD. | S$2,672 |
| 8 Aug 2025 | PROVISION OF SITE SUPERVISION SERVICES FOR SPRUCING WORKS | OCTA METIER PTE. LTD. | S$8,800 |
| 8 Aug 2025 | Supply of 20MM Aggregate to the HDB (Batch 94) | HL BUILDING MATERIALS PTE. LTD. | S$24 |
| 8 Aug 2025 | Infrastructure Works at Alexandra Road | SING HENG HOE CONSTRUCTION (1988) PTE LTD | S$5,105,455 |
| 7 Aug 2025 | PRODUCTION, SUPPLY AND DELIVERY OF WELCOME KITS | YOUNG GENERATION PTE. LTD. | S$3 |
| 4 Aug 2025 | Consultancy Services to Conduct Heritage Studies for Two Future Development Areas | STUDIO LAPIS CONSERVATION PTE. LTD. | S$335,000 |
| 1 Aug 2025 | Supply of Fine Aggregates to the HDB (Batch 85) | ORIENT NATURAL RESOURCES PTE. LTD. | S$25 |
| 31 Jul 2025 | Project 1 - Part A: Building Works at Ang Mo Kio Neighbourhood 7 Contract 41A (Total: 422 Dwelling Units) Part B: Contingency Works; Project 2 - Construction of High Linkways from Marsiling Grove to Low Linkway Across Woodlands Street 13. | RICH CONSTRUCTION COMPANY PTE. LTD. | S$126,220,000 |
| 31 Jul 2025 | PART A : BUILDING WORKS AT PROJECT FG (TOTAL: 284 DWELLING UNITS); PART B: CONTINGENCY WORKS | SCB BUILDING CONSTRUCTION PTE. LTD. | S$82,380,000 |
| 30 Jul 2025 | TERM CONTRACT FOR MAINTENANCE OF SIGNALISED PEDESTRIAN CROSSINGS IN HDB ESTATES FOR A PERIOD OF 3 YEARS (2025 TO 2028) | ENG HUP ENGINEERING PTE LTD | S$35,115 |
| 30 Jul 2025 | Provision of Services for HDB's Lively Places Challenge (LPC) 2025 | STUCK DESIGN PTE. LTD. | S$79,928 |
| 30 Jul 2025 | SUPPLY AND DELIVERY OF SERVER NETWORK SWITCHES | NCS PTE. LTD. | S$374,710 |
| 28 Jul 2025 | REPLACEMENT OF LIFTS AND ESCALATORS WITH 10 YEARS COMPREHENSIVE MAINTENANCE AT COMMERCIAL COMPLEXES (BATCH 1) | SCHINDLER LIFTS (SINGAPORE) PTE. LTD. | S$1,039,646 |
| 28 Jul 2025 | ELECTRICAL LOAD UPGRADING PROGRAMME (ELUP) BATCH 2 PROJECT 2 (NORTH ZONE) | SCB BUILDING CONSTRUCTION PTE. LTD. | S$36,880,000 |
| 25 Jul 2025 | (A) Site Clearance & Earthworks at Simei; (B) Construction of Roads at Simei | PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | S$10,060,000 |
| 25 Jul 2025 | DESIGN AND BUILD CONTRACT FOR MULTI-STOREY CAR PARKS (MSCP) ENHANCEMENT WORKS | NKH CONSTRUCTION EQUIPMENT PTE. LTD. | S$936,245 |
| 21 Jul 2025 | PROVISION OF LANDSCAPING SERVICES ON TOPMOST PARKING DECKS OF EXISTING MULTI- STOREY CAR PARKS (MSCP) (BATCH 14) | GARDEN WORKS PTE. LTD. | S$848,075 |
| 14 Jul 2025 | THE PROVISION OF TECHNOLOGY REFRESH TO ORACLE MEETING ROOMS AT HDB HUB | PANASONIC FACTORY SOLUTIONS ASIA PACIFIC PTE. LTD. | S$300,810 |
| 10 Jul 2025 | Part A: Building Works at Project BU (Total: 1,118 Dwelling Units); Part B: Contingency Works | CHIP ENG SENG CONTRACTORS (1988) PTE LTD | S$242,700,000 |
| 10 Jul 2025 | SPECIALIST CONSULTANCY SERVICES AT HDB DEVELOPMENT (NORTHERN) | SINGAPORE ENVIRONMENTAL CONSULTANCY AND SOLUTIONS PTE. LTD. | S$1,080,000 |
| 9 Jul 2025 | CONSTRUCTION OF BUS SHELTERS, ROAD RESERVE FACILITIES AND JUNCTION IMPROVEMENT AT YUAN CHING ROAD AND KANG CHING ROAD, JURONG TOWN | ARA GLOBAL CONST PTE. LTD. | S$1,633,239 |
| 4 Jul 2025 | MULTI-DISCIPLINARY CONSULTANCY SERVICES (CIVIL & STRUCTURAL ENGINEERING AND QUANTITY SURVEYING) FOR PROPOSED DEVELOPMENT | SURBANA JURONG CONSULTANTS PTE. LTD. | S$73,236,200 |
| 3 Jul 2025 | Supply, Delivery and Maintenance of Robotic Total Station and Terrestrial Laser Scanner with Processing Software | GPS LANDS (SINGAPORE) PTE LTD | S$287,092 |
| 30 Jun 2025 | Part A: Building Works At Project FH And Park (Total: 380 Dwelling Units); Part B: Contingency Works | CHIU TENG CONSTRUCTION CO. PTE. LTD. | S$137,680,000 |
| 26 Jun 2025 | Instrumentation and Monitoring Works for Proposed Public Housing Development at Project EP | ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | S$137,894 |
| 20 Jun 2025 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | CPG CONSULTANTS PTE LTD | S$180 |
| 20 Jun 2025 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | ECAS CONSULTANTS PTE. LTD. | S$180 |
| 20 Jun 2025 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | PH CONSULTING PTE. LTD. | S$180 |
| 20 Jun 2025 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | KTP CONSULTANTS PTE LTD | S$180 |
| 20 Jun 2025 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | JIB SPECIALIST CONSULTANTS PTE. LTD. | S$180 |
| 20 Jun 2025 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | BUREAU VERITAS BUILDINGS & INFRASTRUCTURE PTE. LTD. | S$180 |
| 20 Jun 2025 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | CKMBT INTERNATIONAL PTE. LTD. | S$180 |
| 20 Jun 2025 | SPECIALIST CONSULTANCY SERVICES FOR ENVIRONMENTAL MANAGEMENT AND MONITORING PLAN AT SEMBAWANG N4 PROJECT | SINGAPORE ENVIRONMENTAL CONSULTANCY AND SOLUTIONS PTE. LTD. | S$975,000 |
| 20 Jun 2025 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | ENGINEERS 2002 PRIVATE LIMITED | S$180 |
| 19 Jun 2025 | DIVERSION OF EXISTING 700MM WATER PIPE FOR THE PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT CR | SINGCONTEC PTE. LTD. | S$599,000 |
| 17 Jun 2025 | Supply Of Ordinary Portland Cement To The HDB (Batch 57) | ENGRO CORPORATION LIMITED | S$71 |
| 17 Jun 2025 | (A) Construction of Road Related Facilities (RRF) at Bukit Batok N4; (B) Construction of Trunk Sewers at Bukit Batok N4 | SING HENG HOE CONSTRUCTION (1988) PTE LTD | S$5,936,000 |
| 13 Jun 2025 | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to various HDB Building Sites (Batch 15) | PRECAST CONCRETE PTE. LTD. | S$4,313 |
| 13 Jun 2025 | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to Various HDB Building Sites (Batch 18) | GREYFORM PTE. LTD. | S$4,579 |
| 13 Jun 2025 | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to Various HDB Building Sites (Batch 17) | INTEGRATED PRECAST SOLUTIONS PTE. LTD. | S$5,989 |
| 13 Jun 2025 | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to Various HDB Building Sites (Batch 16) | SUNWAY CONCRETE PRODUCTS (S) PTE LTD | S$1,761 |
| 13 Jun 2025 | SITE INVESTIGATION PHASE 1 FOR PROPOSED DEVELOPMENT | RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | S$2,600,989 |
| 12 Jun 2025 | PROVISION OF SERVICES TO CARRY OUT PERIODIC FACADE INSPECTION (PFI) FOR HDB MULTI-STOREY CAR PARKS FOR BATCH 2 AND BATCH 3 | TNJ CONSULTANTS & PARTNERS PTE. LTD. | S$3,450 |
| 12 Jun 2025 | PROVISION OF SERVICES TO CARRY OUT PERIODIC FACADE INSPECTION (PFI) FOR HDB MULTI-STOREY CAR PARKS FOR BATCH 2 AND BATCH 3 | OCTA CONSULTANTS PTE. LTD. | S$3,300 |
| 6 Jun 2025 | SPRUCING WORKS FOR HDB FLATS (CONTRACT 4) | HEPTACON CONSTRUCTION PTE. LTD. | S$100,300 |
| 2 Jun 2025 | MAINTENANCE OF NETWORK RESOURCE MANAGEMENT SOLUTION FOR A PERIOD OF 5 YEARS | PTC SYSTEM (S) PTE LTD | S$78,428 |
| 30 May 2025 | PART A: BUILDING WORKS AT PROJECT CE (TOTAL 609 DWELLING UNITS); PART B: CONTINGENCY WORKS | THONG HUAT BROTHERS (PTE) LIMITED | S$139,900,000 |
| 30 May 2025 | PROJECT 1: PART A: BUILDING WORKS AT PROJECT CJ (TOTAL: 643 DWELLING UNITS); PART B: CONTINGENCY WORKS. PROJECT 2: PART A: BUILDING WORKS AT KALLANG WHAMPOA CONTRACT 76 (TOTAL: 312 DWELLING UNITS); PART B: CONTINGENCY WORKS | L.S. CONSTRUCTION PTE LTD | S$268,000,000 |
| 30 May 2025 | PART A: BUILDING WORKS AT PROJECT BT (TOTAL: 485 DWELLING UNITS); PART B: CONTINGENCY WORKS | KEN-PAL (S) PTE. LTD. | S$145,330,000 |
| 28 May 2025 | ADDITION & ALTERATION WORKS TO BLOCK 267, SERANGOON AVENUE 3 | FONG YUE DEVELOPMENT PTE. LTD. | S$1,205,000 |
| 26 May 2025 | APPOINTMENT OF PANEL LAW FIRMS | YUSARN AUDREY LLC | S$3,620 |
| 26 May 2025 | APPOINTMENT OF PANEL LAW FIRMS | DREW & NAPIER LLC | S$13,604 |
| 26 May 2025 | APPOINTMENT OF PANEL LAW FIRMS | ALLEN & GLEDHILL LLP | S$20 |
| 26 May 2025 | APPOINTMENT OF PANEL LAW FIRMS | ADSAN LAW LLC | S$7,200 |
| 26 May 2025 | APPOINTMENT OF PANEL LAW FIRMS | DENTONS RODYK & DAVIDSON LLP | S$22,745 |
| 26 May 2025 | APPOINTMENT OF PANEL LAW FIRMS | AMICA LAW LLC | S$3,300 |
| 26 May 2025 | APPOINTMENT OF PANEL LAW FIRMS | CENTRAL CHAMBERS LAW CORPORATION | S$1,200 |
| 23 May 2025 | PART A: BUILDING WORKS AT PROJECT ES (TOTAL: 569 DWELLING UNITS); PART B: CONTINGENCY WORKS | SINGAPORE ENGINEERING & CONSTRUCTION PTE. LTD. | S$119,800,000 |
| 21 May 2025 | Infrastructure Works at Ghim Moh Road | BA CONTRACTS PTE LTD | S$681,963 |
| 19 May 2025 | IMPLEMENTATION OF INFRASTRUCTURE AND ROAD RELATED FACILITIES AT BISHAN TOWN | UNITED E & P PTE. LTD. | S$10,376,000 |
| 16 May 2025 | Project 1: Part A: Building Works at Geylang Contract 55 & Park (Total: 433 Dwelling Units); Part B: Contingency Works. Project 2: Part A: Building Works at Ang Mo Kio Neighbourhood 7 Contract 41A (Total: 422 Dwelling Units); Part B: Contingency Works | MASTER CONTRACT SERVICES PTE LTD | S$107,300,000 |
| 16 May 2025 | INSTRUMENTATION AND MONITORING WORKS FOR THE PROPOSED PUBLIC HOUSING AT PROJECT BL (TOTAL: 683 DWELLING UNITS) | RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | S$62,855 |
| 16 May 2025 | TERM CONTRACT FOR THE PRODUCTION, SUPPLY AND DELIVERY OF SPIRAL CONNECTOR SYSTEM (BATCH 2) | BRC ASIA LIMITED | S$1,129 |
| 16 May 2025 | Supply Of 20MM Aggregate to the HDB (Batch 93) | SAMWOH RESOURCES PTE LTD | S$24 |
| 15 May 2025 | PROVISION OF ONE-ON-ONE EXECUTIVE COACHING | PACIFIC CENTURY CONSULTING PTE LTD | S$1,900 |
| 13 May 2025 | Demolition Works for Project B (Batch 29) | HAO DA PTE LTD | S$1,670,000 |
| 9 May 2025 | Project 1: Road Widening at Tanjong Rhu Road, Kampong Arang Road and Sampan Place. Project 2: Road Improvement Work at Bukit Merah View | CHC CONSTRUCTION PTE. LTD. | S$13,560,000 |
| 5 May 2025 | (A) Repair and Reconstruction Works along Yishun Avenue 8; (B) Water Mains Diversion along Sembawang Road & Infrastructure Works along Yishun Avenue 8 | Unknown | S$0 |
| 5 May 2025 | PROVISION OF SERVICES TO CARRY OUT PERIODIC FACADE INSPECTION (PFI) AT VARIOUS HDB COMMERCIAL COMPLEXES FOR BATCH 1 AND BATCH 2 | NOVAARS INTERNATIONAL PTE. LTD. | S$7,900 |
| 5 May 2025 | PROVISION OF SERVICES TO CARRY OUT PERIODIC FACADE INSPECTION (PFI) AT VARIOUS HDB COMMERCIAL COMPLEXES FOR BATCH 1 AND BATCH 2 | OCTA CONSULTANTS PTE. LTD. | S$8,200 |
| 5 May 2025 | Supply of 20MM Aggregate to the HDB (Batch 92) | HL BUILDING MATERIALS PTE. LTD. | S$24 |
| 5 May 2025 | ADDITION AND ALTERATION WORKS TO LOYANG POINT | TIMBERPARK PTE. LTD. | S$331,000 |
| 5 May 2025 | Project 1: Part A: Building Works At Jurong West Neighbourhood 1 Contract 34 (Total: 1,844 Dwelling Units); Part B: Contingency Works. Project 2: Infrastructure Works At Jurong West Neighbourhood 1 Contract 34 | LIM WEN HENG CONSTRUCTION PTE LTD | S$473,000,000 |
| 2 May 2025 | ADDITION AND ALTERATION WORKS TO JOO CHIAT COMPLEX | GLOBALPOINT FAR EAST PTE. LTD. | S$22,338,000 |
| 30 Apr 2025 | PART A: BUILDING WORKS AT WOODLANDS NEIGHBOURHOOD 2 CONTRACT 19B (TOTAL: 818 DWELLING UNITS); PART B: CONTINGENCY WORKS | QINGJIAN ENGINEERING & CONSTRUCTION PTE. LTD. | S$177,909,000 |
| 30 Apr 2025 | PART A: BUILDING WORKS AT PROJECT ER (TOTAL: 862 DWELLING UNIT); PART B: CONTINGENCY WORKS | WEE HUR CONSTRUCTION PTE LTD | S$203,000,000 |
| 29 Apr 2025 | FORMAL SAFETY ASSESSMENT STUDY FOR PROPOSED DEVELOPMENT | SIMPLUS PTE. LTD. | S$179,000 |
| 29 Apr 2025 | Improvement Works To Void Deck Columns Of Residential Buildings Using Polymer Fibre Wrapping (Batch 15) | FIBRWRAP CONSTRUCTION PTE. LTD. | S$58 |
| 25 Apr 2025 | MAJOR INFRASTRUCTURE WORKS AT ANG MO KIO NEIGHBOURHOOD 8 (CONTRACT 2) | CHAN & CHAN ENGINEERING PTE. LTD. | S$46,735,825 |
| 23 Apr 2025 | IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 66) | MACBUILD CONSTRUCTION PTE. LTD. | S$9,568,222 |
| 21 Apr 2025 | (A) CONSTRUCTION OF YISHUN AVENUE 10, YISHUN STREET 53 & MILTONIA CLOSE EXTENSION; (B) CONSTRUCTION OF SEWER AT YISHUN NEIGHBOURHOOD 5 | TKB C-E CONTRACTOR PTE. LTD. | S$15,288,000 |
| 21 Apr 2025 | PREPARATION AND DELIVERY OF ARCHITECTURAL PERSPECTIVES AND VIDEO FOR TWO HDB ESTATES (A AND B) | SPOT WORKS PTE. LTD. | S$35,600 |
| 17 Apr 2025 | ADDITION & ALTERATION WORKS TO OFFICES AT LEVEL 1, 4 AND 6 OF HDB HUB | NGAI CHIN CONSTRUCTION PTE LTD | S$6,358,000 |
| 16 Apr 2025 | Appointment of Site Supervisors for Improvement Works at Various HDB Residential Buildings | WIDE WINGS PTE. LTD. | S$8,318 |
| 15 Apr 2025 | Supply of Fine Aggregates to the HDB (Batch 84) | ORIENT NATURAL RESOURCES PTE. LTD. | S$25 |
| 15 Apr 2025 | PART A: BUILDING WORKS AT PASIR RIS N5 C21, N5 C22 & LINEAR PARK (TOTAL: 767 DWELLING UNITS); PART B: CONTINGENCY WORKS | L.S. CONSTRUCTION PTE LTD | S$220,000,000 |
| 14 Apr 2025 | Addition & Alteration Works at Gek Poh Shopping Centre | PT-G BUILDERS PTE. LTD. | S$29,848,000 |
| 11 Apr 2025 | TERM CONTRACT FOR PROVISION OF TESTING SERVICES FOR WINDSOR PROBE TEST, CORE TEST AND CONSTRUCTION MATERIALS TESTING (BATCH 9) | SETSCO SERVICES PTE LTD | S$299 |
| 11 Apr 2025 | Infrastructure Works at Telok Blangah | JIN CHOON CIVIL ENGINEERING PTE. LTD. | S$34,273,000 |
| 11 Apr 2025 | Provision of Services to Support Emergency Housing Operations | ONEBERRY TECHNOLOGIES PTE. LTD. | S$4,126,200 |
| 11 Apr 2025 | IMPROVEMENT WORKS TO SURFACE CAR PARKS (BATCH 86) | SHINCON INDUSTRIAL PTE. LTD. | S$14,100,000 |
| 11 Apr 2025 | Term Contract for the Provision of Robotics Service (Painting Robots) for Selected BTO Projects under HDB (Batch 1) | DAFANG AI PTE. LTD. | S$121,736 |
| 11 Apr 2025 | Term Contract for the Provision of Robotics Service (Painting Robots) for Selected BTO Projects under HDB (Batch 2) | LINKWISE TECHNOLOGY PTE. LTD. | S$125,260 |
| 11 Apr 2025 | ADDITION AND ALTERATION WORKS TO TOILETS AT HDB COMMERCIAL COMPLEXES (BATCH 1) | TRENDBUILD CONTRACTS PTE. LTD. | S$3,591,177 |
| 10 Apr 2025 | RENOVATION WORKS TO EXISTING SHOP WITH UPPER DWELLING UNIT INTO SELF-SERVICE LOBBY (E-LOBBY) WITH INTERVIEW ROOMS AND WAITING AREA | MS PROJECTS PTE. LTD. | S$152,760 |
| 10 Apr 2025 | PRODUCTION AND MAINTENANCE / MODIFICATION OF ARCHITECTURAL MODELS FOR TWO HDB ESTATES (A AND B) | ANNESING PTE. LTD. | S$174,800 |
| 10 Apr 2025 | PROPOSED INFRASTRUCTURE WORKS AT JURONG EAST CENTRAL AND JURONG WEST STREET 93 (A) CONSTRUCTION OF TRUNK SEWER AT JURONG EAST CENTRAL; (B) ROAD WIDENING AND JUNCTION IMPROVEMENT WORKS AT JURONG WEST STREET 93 | CHC CONSTRUCTION PTE. LTD. | S$6,180,000 |
| 9 Apr 2025 | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT BT | APS ASIA PDA ENTERPRISE PTE. LTD. | S$86,657 |
| 8 Apr 2025 | MAINTENANCE OF NETWORK RESOURCE MANAGEMENT SOLUTION FOR A PERIOD OF 5 YEARS | Unknown | S$0 |
| 7 Apr 2025 | MULTI-DISCIPLINARY (CIVIL & STRUCTURAL ENGINEERING AND QUANTITY SURVEYING) CONSULTANCY SERVICES FOR DEMOLITION PROJECTS FOR A PERIOD OF 1.5 YEARS (SPC(DEMO) 1) TENDER EXERCISE BATCH 4 (2 PROJECTS) | EXECUTIVE DECISIONS INC. LLP | S$322,000 |
| 7 Apr 2025 | Supply Of Ordinary Portland Cement To The HDB (Batch 56) | LCS PTE. LTD. | S$71 |
| 7 Apr 2025 | MULTI-DISCIPLINARY (CIVIL & STRUCTURAL ENGINEERING AND QUANTITY SURVEYING) CONSULTANCY SERVICES FOR DEMOLITION PROJECTS FOR A PERIOD OF 1.5 YEARS (SPC(DEMO) 1) TENDER EXERCISE BATCH 4 (2 PROJECTS) | ABL CONSULTANTS PTE. LTD. | S$286,000 |
| 28 Mar 2025 | INSTRUMENTATION AND MONITORING WORKS FOR THE PROPOSED PUBLIC HOUSING AT PROJECT FD (TOTAL: 1,039 DWELLING UNITS) | GROUND INSTRUMENTATION & ENGINEERING PTE. LTD. | S$78,590 |
| 28 Mar 2025 | PART A : BUILDING WORKS AT PROJECT BJ (TOTAL: 1,039 DWELLING UNITS); PART B : CONTINGENCY WORKS | WEE HUR CONSTRUCTION PTE LTD | S$236,398,000 |
| 28 Mar 2025 | SUPPLY OF VIRTUAL DESKTOP INFRASTRUCTURE (VDI) WARRANTY AND MAINTENANCE RENEWAL | LOGICALIS SINGAPORE PTE. LTD. | S$739,115 |
| 27 Mar 2025 | SUPPLY OF A UNIFIED PLATFORM FOR OBSERVABILITY & SECURITY ANALYTICS AND SERVICES | IMPERIUM SOLUTIONS PTE. LTD. | S$2,901,379 |
| 26 Mar 2025 | Replacement of Air Conditioning & Mechanical Ventilation System at Various HDB Branches - Sector 2 | G STAR ENGINEERING PTE. LTD. | S$3,092,220 |
| 26 Mar 2025 | IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 67) | TKB C-E CONTRACTOR PTE. LTD. | S$7,390,000 |
| 25 Mar 2025 | PROVISION OF MANAGING AGENT AND COMPREHENSIVE MAINTENANCE OF THE HDB MECHANISED PARKING SYSTEM (MPS) AND BUILDING FACILITIES | CYCLECT FACILITIES MANAGEMENT PTE. LTD. | S$3,800,290 |
| 24 Mar 2025 | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT ER | GROUND INSTRUMENTATION & ENGINEERING PTE. LTD. | S$79,701 |
| 24 Mar 2025 | REPAIR & REDECORATION (R&R) WORKS TO HDB COMMERCIAL COMPLEXES (BATCH 1) | E3 CONSTRUCTION PTE LTD | S$6,483,000 |
| 24 Mar 2025 | Supply of Autodesk Software | INNOCOM TECHNOLOGIES PTE LTD | S$177,590 |
| 21 Mar 2025 | Term Contract for the Provision of Testing Services for Semi- Destructive and Non-Destructive Tests on HDB Buildings (Batch 16) | SETSCO SERVICES PTE LTD | S$150 |
| 21 Mar 2025 | RENEWAL OF MAINTENANCE SUPPORT FOR BITBUCKET, CONFLUENCE AND JIRA SOFTWARE | INFORMATION OFFICER PTE. LTD. | S$374,960 |
| 21 Mar 2025 | PROVISION OF RESIDENT TECHNICAL OFFICERS TO SUPERVISE ADDITION & ALTERATION PROJECTS AT HDB PROPERTIES | WIDE WINGS PTE. LTD. | S$3,799 |
| 18 Mar 2025 | ELECTRICAL LOAD UPGRADING PROGRAMME (ELUP) BATCH 3 PROJECT 4 (CENTRAL ZONE) | COSBY PTE. LTD. | S$27,729,900 |
| 17 Mar 2025 | Supply, Delivery And Maintenance Of Bentley Map Software For 36 Months | BENTLEY SYSTEMS SINGAPORE PTE LTD | S$10,087 |
| 17 Mar 2025 | SITE CLEARANCE AND EARTHWORKS AT GEYLANG - PHASE 2 | WFY CIVIL ENGINEERING PTE. LTD. | S$7,369,000 |
| 14 Mar 2025 | MAJOR INFRASTRUCTURE WORKS AT BAYSHORE (PHASE 1B) | JUPITER BUILDER PTE. LTD. | S$26,600,000 |
| 13 Mar 2025 | SPECIALIST PROFESSIONAL ENGINEERING (GEOTECHNICAL) CONSULTANCY SERVICES FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT FF | ONE SMART ENGINEERING PTE. LTD. | S$238,000 |
| 13 Mar 2025 | Term Contract for Maintenance of Mechanical and Electrical Systems at HDB Commercial Complexes, Branch Offices and Carparks Adjoining Commercial Complexes (Zone 2) | SH INTEGRATED SERVICES PTE. LTD. | S$254,617 |
| 13 Mar 2025 | Term Contract for Maintenance of Mechanical and Electrical Systems at HDB Commercial Complexes, Branch Offices and Carparks Adjoining Commercial Complexes (Zone 1) | MKV ENGINEERING AND TRADING SERVICES PTE. LTD. | S$444,905 |
| 12 Mar 2025 | Supply and Delivery of Tablet Computers and Data Plan Subscription | SINGAPORE TELECOMMUNICATIONS LIMITED | S$23 |
| 12 Mar 2025 | Demolition Works for Project C (Batch 29) | HAO DA PTE LTD | S$1,078,965 |
| 10 Mar 2025 | Coastal Development At Pulau Sudong | SANTARLI CONSTRUCTION PTE. LTD. | S$180,800,000 |
| 7 Mar 2025 | (A) DEMOLITION WORKS AT CENTRAL AREA; (B) EARTHWORKS AT CENTRAL AREA; (C) RETURFING AND MAINTENANCE WORKS AT TOA PAYOH WEST | YONGSHENG E & C PTE. LTD. | S$1,800,000 |
| 6 Mar 2025 | Proposed Removal of Existing Water Main, Sealing Up of Abandoned Sewer Line and Reinstatement Works at Project CQ | HUNG YAO SHENG ENGINEERING PTE. LTD. | S$120,188 |
| 5 Mar 2025 | Tender For Salvaging / Storage / Maintenance Works at Project A | HI-TACT SOLUTIONS & TRADING PTE. LTD. | S$229,000 |
| 4 Mar 2025 | PART A: BUILDING WORKS AT BM (TOTAL: 1,244 DWELLING UNITS); PART B: CONTINGENCY WORKS | JIA YI CONSTRUCTION PTE. LTD. | S$235,800,000 |
| 3 Mar 2025 | INSTRUMENTATION AND MONITORING WORKS FOR THE PROPOSED PUBLIC HOUSING AT PROJECT BW (TOTAL: 1,138 DWELLING UNITS) | BETIME ENGINEERING PTE. LTD. | S$89,340 |
| 28 Feb 2025 | PART A: BUILDING WORKS AT QUEENSTOWN HOLLAND C1 & PARK (TOTAL: 342 DWELLING UNITS); PART B: CONTINGENCY WORKS | WEIMA BUILDERS PTE. LTD. | S$89,880,000 |
| 28 Feb 2025 | ROAD IMPROVEMENT WORKS AT ANG MO KIO NEIGHBOURHOOD 7 | SHUILINGLONG (FUJIAN) CONSTRUCTION ENGINEERING CO., LTD. (Singapore Branch) | S$10,988,000 |
| 28 Feb 2025 | PART A: BUILDING WORKS AT YISHUN NEIGHBOURHOOD 5 CONTRACT 11 (TOTAL: 987 DWELLING UNITS); PART B: CONTINGENCY WORKS | DEBENHO PTE LTD | S$248,000,000 |
| 28 Feb 2025 | PART A: BUILDING WORKS AT YISHUN NEIGHBOURHOOD 5 CONTRACT 9 & 10 (TOTAL: 1,334 DWELLING UNITS); PART B: CONTINGENCY WORKS | CHIP ENG SENG CONTRACTORS (1988) PTE LTD | S$287,716,380 |
| 28 Feb 2025 | PART A: BUILDING WORKS AT PROJECT CA (TOTAL: 750 DWELLING UNITS); PART B: CONTINGENCY WORKS | RICH CONSTRUCTION COMPANY PTE. LTD. | S$189,800,000 |
| 28 Feb 2025 | PART A: BUILDING WORKS AT PROJECT BZ (TOTAL: 754 DWELLING UNITS); PART B: CONTINGENCY WORKS | CHIU TENG CONSTRUCTION CO. PTE. LTD. | S$174,330,000 |
| 28 Feb 2025 | PROJECT 1: PART A: BUILDING WORKS AT PROJECT BW (TOTAL: 1,138 DWELLING UNITS); PART B: CONTINGENCY WORKS. PROJECT 2: ROAD IMPROVEMENT AND INFRASTRUCTURE WORKS AT PROJECT BW | NEWCON BUILDERS PTE. LTD. | S$310,380,000 |
| 28 Feb 2025 | PART A: BUILDING WORKS AT PROJECT BL (TOTAL: 683 DWELLING UNITS); PART B: CONTINGENCY WORKS | JIA YI CONSTRUCTION PTE. LTD. | S$173,700,000 |
| 28 Feb 2025 | PART A: BUILDING WORKS AT PROJECT BN (TOTAL: 848 DWELLING UNITS); PART B: CONTINGENCY WORKS | EXPAND CONSTRUCTION PTE LTD | S$216,000,000 |
| 26 Feb 2025 | Operate and Manage HDB Car Parks (Batch 57) | GUTHRIE ENGINEERING (S) PTE LTD | S$1,583,334 |
| 26 Feb 2025 | Operate and Manage HDB Car Parks (Batch 59) | WILSON PARKING (SINGAPORE) PTE. LTD. | S$58,750 |
| 26 Feb 2025 | Operate and Manage HDB Car Parks (Batch 58) | RE SUSTAINABILITY SOLUTIONS PTE. LTD. | S$892,090 |
| 26 Feb 2025 | Operate and Manage HDB Car Parks (Batch 56) | RE SUSTAINABILITY SOLUTIONS PTE. LTD. | S$1,393,800 |
| 26 Feb 2025 | Operate and Manage HDB Car Parks (Batch 55) | P-PARKING INTERNATIONAL PTE LTD | S$2,562,100 |
| 26 Feb 2025 | Operate and Manage HDB Car Parks (Batch 54) | CBM PARKING PTE. LTD. | S$2,316,840 |
| 26 Feb 2025 | Operate and Manage HDB Car Parks (Batch 52) | WILSON PARKING (SINGAPORE) PTE. LTD. | S$2,006,751 |
| 26 Feb 2025 | Operate and Manage HDB Car Parks (Batch 53) | ST ENGINEERING URBAN SOLUTIONS LTD. | S$2,364,847 |
| 24 Feb 2025 | DEMOLITION PROJECT AT PUBLIC HOUSING ESTATE (BATCH 8) | HAO DA PTE LTD | S$1,178,097 |
| 21 Feb 2025 | Specialist Consultancy Services at Central Area | SINGAPORE ENVIRONMENTAL CONSULTANCY AND SOLUTIONS PTE. LTD. | S$1,495,000 |
| 18 Feb 2025 | Construction and Demolition of Facilities at Mount Pleasant | ZHONG KAI CONSTRUCTION COMPANY PTE. LTD. | S$3,298,600 |
| 17 Feb 2025 | Engagement of Drone Service Provider with Artificial Intelligence Technology to Carry Out Facade Audit Inspection on Residential Properties - Batch 1 | H3 ZOOM PTE. LTD. | S$2,715 |
| 11 Feb 2025 | Independent Instrumentation Monitoring Services For Coastal Development At Pulau Sudong | GEOSMART INTERNATIONAL PTE. LTD. | S$888,888 |
| 7 Feb 2025 | INSTRUMENTATION AND MONITORING WORKS INCLUDING AUTOMATED TUNNEL MONITORING SYSTEM FOR THE PROPOSED PUBLIC HOUSING AT TAMPINES SIMEI CONTRACT 24 & PARK | RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | S$390,190 |
| 6 Feb 2025 | Term Contract for the Provision of Testing Services for Semi- Destructive and Non-Destructive Tests on HDB Buildings (Batch 15) | ELEMENT CONSTRUCTION TESTING (S) PTE. LTD. | S$158 |
| 6 Feb 2025 | Supply of 20MM Aggregate to the HDB (Batch 91) | SAMWOH RESOURCES PTE LTD | S$23 |
| 6 Feb 2025 | THIRTY-SIXTH TERM CONTRACT FOR THE SUPPLY, DELIVERY, INSTALLATION AND MAINTENANCE OF LIFTS FOR THREE-YEAR PERIOD | CHEVALIER SINGAPORE HOLDINGS PTE. LTD. | S$11,182,278 |
| 6 Feb 2025 | Term Contract for the Provision of Testing Services for Semi- Destructive and Non-Destructive Tests on HDB Buildings (Batch 14) | ELEMENT CONSTRUCTION TESTING (S) PTE. LTD. | S$151 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34C; (B) CONTINGNECY WORKS | SANCHOON BUILDERS PTE LTD | S$37,000,000 |
| 31 Jan 2025 | TERM CONTRACT FOR VECTOR CONTROL SERVICES TO HDB DEVELOPMENT SITES FOR A PERIOD OF TWENTY-FOUR MONTHS | STAR PEST CONTROL PTE LTD | S$860 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33F; (B) CONTINGENCY WORKS | WEIMA BUILDERS PTE. LTD. | S$29,528,000 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34H; (B) CONTINGENCY WORKS | THONG HUAT BROTHERS (PTE) LIMITED | S$37,555,000 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33G; (B) CONTINGENCY WORKS | HI-TEK CONSTRUCTION PTE. LTD. | S$37,500,000 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33A; (B) CONTINGENCY WORKS | KIAN HIAP CONSTRUCTION PTE LTD | S$30,219,881 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34A; (B) CONTINGENCY WORKS | KIENTA ENGINEERING CONSTRUCTION PTE. LTD. | S$41,850,000 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33B; (B) CONTINGENCY WORKS | THONG HUAT BROTHERS (PTE) LIMITED | S$34,355,000 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33C; (B) CONTINGENCY WORKS | CHIP ENG SENG CONTRACTORS (1988) PTE LTD | S$36,755,000 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34D; (B) CONTINGENCY WORKS | PAL-LINK CONSTRUCTION PTE. LTD. | S$39,900,000 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33H; (B) CONTINGENCY WORKS | FUJIAN CHENGJIAN CONSTRUCTION CORPORATION LIMITED (Singapore Branch) | S$37,000,000 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34G; (B) CONTINGENCY WORKS | KIAN HIAP CONSTRUCTION PTE LTD | S$44,817,183 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34F; (B) CONTINGENCY WORKS | HI-TEK CONSTRUCTION PTE. LTD. | S$28,770,000 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34B; (B) CONTINGENCY WORKS | CHIP ENG SENG CONTRACTORS (1988) PTE LTD | S$33,155,000 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33D; (B) CONTINGENCY WORKS | SCT CONSTRUCTION PTE. LTD. | S$37,652,000 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34E; (B) CONTINGENCY WORKS | SOON THONG CONSTRUCTION PTE. LTD. | S$34,888,000 |
| 31 Jan 2025 | PART A: BUILDING WORKS AT TAMPINES NEIGHBOURHOOD 9 CONTRACT 20 (TOTAL: 585 DWELLING UNITS); PART B: CONTINGENCY WORKS | CHIU TENG CONSTRUCTION CO. PTE. LTD. | S$135,510,000 |
| 31 Jan 2025 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33E; (B) CONTINGENCY WORKS | WING TUCK ENGINEERING PTE LTD | S$36,888,000 |
| 28 Jan 2025 | PROVISION OF TELECOMMUNICATION LINE SERVICES FOR HOUSING MANAGEMENT GROUP FOR A PERIOD OF 3 YEARS | STARHUB LTD. | S$237 |
| 24 Jan 2025 | PROVISION OF 24 HOURS TELEPHONE ANSWERING SERVICE | CPG FACILITIES MANAGEMENT PTE LTD | S$78,880 |
| 24 Jan 2025 | Proposed Relocation Works at Designated Sites | ORIENT NATURAL RESOURCES PTE. LTD. | S$24,690,785 |
| 24 Jan 2025 | SUPPLY AND DELIVERY OF RADIO FREQUENCY IDENTIFICATION (RFID) TAGS TO HDB ENGINEERING MATERIALS LABORATORY (BATCH 2) | TECH-CARE PTE. LTD. | S$0 |
| 24 Jan 2025 | DESIGN, RENOVATION AND REINSTATEMENT WORKS TO VARIOUS OFFICE SPACES AT HDB HUB (WEST WING, LEVEL 21, 22, 23, EAST WING, LEVEL 23) | A I ASSOCIATES PTE. LTD. | S$2,533,741 |
| 20 Jan 2025 | ELECTRICAL UPGRADING WORKS AT BLOCK 51, OLD AIRPORT ROAD | XLPRIME ENGINEERING PTE. LTD. | S$89,000 |
| 16 Jan 2025 | UPGRADING AND MAINTENANCE OF TELEPHONY SYSTEM | NXGEN COMMUNICATIONS PTE LTD | S$695,842 |
| 15 Jan 2025 | DEMOLITION WORKS FOR PROJECT B (BATCH 28) | BENG HENG ENGINEERING PTE LTD | S$1,888,000 |
| 15 Jan 2025 | Supply Of Ordinary Portland Cement To The HDB (Batch 55) | LCS PTE. LTD. | S$71 |
| 9 Jan 2025 | INSTRUMENTATION AND MONITORING WORKS FOR DRAINAGE RECONSTRUCTION WORKS ALONG NEW UPPER CHANGI ROAD | GEOAPPLICATION ENGINEERS PTE. LTD. | S$71,669 |
| 7 Jan 2025 | Supply of Fine Aggregates to the HDB (Batch 83) | ORIENT NATURAL RESOURCES PTE. LTD. | S$26 |
| 6 Jan 2025 | PART A: BUILDING WORKS AT KALLANG WHAMPOA CONTRACT 60 AND COMMON GREEN (TOTAL: 650 DWELLING UNITS); PART B: CONTINGENCY WORKS | EXPAND CONSTRUCTION PTE LTD | S$171,000,000 |
| 6 Jan 2025 | PART A: BUILDING WORKS AT KALLANG WHAMPOA CONTRACT 69 (TOTAL: 271 DWELLING UNITS) ;PART B: CONTINGENCY WORKS | TRUST-BUILD ENGINEERING & CONSTRUCTION PTE. LTD. | S$79,560,000 |
| 6 Jan 2025 | PART A: BUILDING WORKS AT PROJECT BG (TOTAL 1,015 DWELLING UNITS); PART B: CONTINGENCY WORKS | BHCC CONSTRUCTION PTE. LTD. | S$245,988,000 |
| 3 Jan 2025 | Part A: Appointment of Managing Agent to Manage HDB Construction Resources Services (No.7); Part B: Appointment of Managing Agent for Sand & Granite Storage Site (Batch 5); Part C: Contingency Works | CTM FACILITIES MANAGEMENT PTE. LTD. | S$326,967 |
| 3 Jan 2025 | DIVERSION OF WATER MAIN & DOUBLE PILLAR HYDRANT FOR BLOCK 427 & 431 HOUGANG AVENUE 6 SUBSTATIONS | SKK WORKS PTE. LTD. | S$236,493 |
| 3 Jan 2025 | PART A: BUILDING WORKS AT BEDOK KEMBANGAN CONTRACT 3, COMMUNITY CLUB & PARK (TOTAL: 348 DWELLING UNITS); PART B: CONTINGENCY WORKS | KIMLY CONSTRUCTION PRIVATE LIMITED | S$162,800,000 |
| 31 Dec 2024 | PART A: BUILDING WORKS AT YISHUN NEIGHBOURHOOD 8 CONTRACT 16-17 AND PARK (TOTAL: 1,277 DWELLING UNITS); PART B: CONTINGENCY WORKS | WELLTECH CONSTRUCTION PTE LTD | S$332,600,000 |
| 30 Dec 2024 | ACCREDITED CHECKING SERVICES FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT DM AND PROJECT DN | MEINHARDT (SINGAPORE) PTE LTD | S$599,620 |
| 30 Dec 2024 | Implementation of Cooling Intervention Trial and Measurement of Environmental Data | LHW CONSTRUCTION PTE. LTD. | S$2,257,122 |
| 30 Dec 2024 | PART A: BUILDING WORKS AT KALLANG WHAMPOA CONTRACT 61 AND 62 (TOTAL: 1,413 DWELLING UNITS); PART B: CONTINGENCY WORKS | BHCC CONSTRUCTION PTE. LTD. | S$330,988,000 |
| 30 Dec 2024 | TERM CONTRACT FOR PROVISION OF SERVICES FOR LABORATORY TESTING, OPERATION AND MAINTENANCE AT HDB ENGINEERING MATERIALS LABORATORY (BATCH 8) | R.A.K. MATERIALS CONSULTANTS PTE LTD | S$27,180 |
| 26 Dec 2024 | Mechanical and Electrical Cyclical Improvement Works to Multi-Storey Car Parks (Batch 28) | LEAP INTEGRATED PTE. LTD. | S$6,447,799 |
| 24 Dec 2024 | RENEWAL OF MAINTENANCE FOR FIREWALL FOR 1 YEAR AND PROVISION OF PROFESSIONAL SERVICES FOR FIREWALL HARDWARE MIGRATION | NEC ASIA PACIFIC PTE. LTD. | S$76,340 |
| 20 Dec 2024 | Appointment of Site Supervisors for Concrete Testing Works on HDB Buildings (Batch 4) | LANDMARK ASIA PACIFIC PTE. LTD. | S$4,016 |
| 19 Dec 2024 | MODERNISATION OF ESCALATORS AND SIX (6) YEARS COMPREHENSIVE MAINTENANCE WORKS AT NEW BRIDGE CENTRE | GYLET LIFT (M&S) PRIVATE LIMITED | S$388,100 |
| 16 Dec 2024 | Provision of Managing Agent Services and Improvement Works within HDB Flats (North Zone) | AIK SAN CONSTRUCTION PTE LTD | S$73,694 |
| 11 Dec 2024 | TERM CONTRACT FOR MAINTENANCE OF FIRE PROTECTION, MECHANICAL AND ELECTRICAL SYSTEMS AT HDB MANAGED PROPERTIES FOR A PERIOD OF SIXTY (60) MONTHS | KOYO ENGINEERING (S.E. ASIA) PTE. LTD. | S$512,030 |
| 11 Dec 2024 | Specialist Consultancy Services For Project BY | TEMBUSU ASIA CONSULTING PTE. LTD. | S$1,960,000 |
| 6 Dec 2024 | ABC WATERS PROFESSIONAL CONSULTANCY SERVICES FOR THE PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT DM AND PROJECT DN | PE CONSULTANTS PTE. LTD. | S$65,000 |
| 6 Dec 2024 | Demolition Works for Project A (Batch 29) | BENG HENG ENGINEERING PTE LTD | S$1,780,000 |
| 4 Dec 2024 | MAINTENANCE OF NETWORK EQUIPMENT FOR TWO (2) YEARS | NCS PTE. LTD. | S$9,626 |
| 29 Nov 2024 | Supply Of Ordinary Portland Cement to the HDB (Batch 54) | ENGRO CORPORATION LIMITED | S$72 |
| 29 Nov 2024 | Replacement of Air Conditioning & Mechanical Ventilation System at Various HDB Branches - Sector 1 | SQUARE FRESCO PTE. LTD. | S$4,447,099 |
| 29 Nov 2024 | ADDITION AND ALTERATION WORKS TO WEST WING, LEVEL 29 AT HDB HUB | KJS CONSTRUCTION PTE LTD | S$1,135,000 |
| 29 Nov 2024 | PROJECT 1: PART A: BUILDING WORKS AT BEDOK NEIGHBOURHOOD 8 CONTRACT 14 (TOTAL: 1,234 DWELLING UNITS); PART B: CONTINGENCY WORKS. PROJECT 2: PART A: BUILDING WORKS AT PROJECT ED (TOTAL: 292 DWELLING UNITS); PART B: CONTINGENCY WORKS | L.S. CONSTRUCTION PTE LTD | S$368,000,000 |
| 28 Nov 2024 | IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 63) | AIK SAN CONSTRUCTION PTE LTD | S$8,360,200 |
| 25 Nov 2024 | Term Contract of Building Inspector Services for Building Works | WSH EXPERTS PTE. LTD. | S$55 |
| 22 Nov 2024 | SEWER DIVERSION FOR CHINESE TEMPLE AND PARTIAL ROAD EXPUNCTION AT REDHILL CLOSE REQUIRED FOR LAND PREPARATION OF REDHILL CLOSE | HO CHOON TRANSPORT & CONSTRUCTION PTE LTD | S$1,300,000 |
| 22 Nov 2024 | THE DEVELOPMENT OF STRUCTURAL HEALTH MONITORING SYSTEM (SHM) | ST ENGINEERING URBAN SOLUTIONS LTD. | S$11,230,000 |
| 22 Nov 2024 | Structural Inspection at MND Complex | ELEMENT CONSTRUCTION TESTING (S) PTE. LTD. | S$86,290 |
| 19 Nov 2024 | IMPROVEMENT WORKS TO CEILING LIGHTS AT HDB HUB | G STAR ENGINEERING PTE. LTD. | S$498,000 |
| 18 Nov 2024 | INTERIOR DESIGN, DECORATION AND MAINTENANCE OF SHOWFLATS (SET A & SET B) | CISEERN BY DESIGNER FURNISHINGS PTE. LTD. | S$0 |
| 15 Nov 2024 | PROVISION OF ON-SITE HEALTH SCREENING SERVICES FOR HDB OFFICERS | MINMED GROUP PTE. LTD. | S$167 |
| 15 Nov 2024 | SPECIALIST PROFESSIONAL ENGINEERING (GEOTECHNICAL) CONSULTANCY SERVICES FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT DM AND PROJECT DN | ONE SMART ENGINEERING PTE. LTD. | S$338,000 |
| 15 Nov 2024 | ADDITION & ALTERATION WORKS TO DAWSON PLACE AND FAJAR SHOPPING CENTRE | WEIMA BUILDERS PTE. LTD. | S$14,615,300 |
| 14 Nov 2024 | Additions And Alterations Works To Multi-Storey Car Park PM28 (Block 586A, Pasir Ris Street 53) | MACTECH ENGINEERING & TRADING PTE. LIMITED | S$800,020 |
| 13 Nov 2024 | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT HOUGANG NEIGHBOURHOOD 1 CONTRACT 13A AT HOUGANG STREET 13 | ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | S$83,277 |
| 13 Nov 2024 | Construction of Road at Queen's Crescent (Part) | WFY CIVIL ENGINEERING PTE. LTD. | S$7,980,000 |
| 12 Nov 2024 | Mechanical And Electrical Cyclical Improvement Works To Multi-Storey Car Parks (Batch 30) | WTS ENGINEERING (M&E) PTE. LTD. | S$5,560,200 |
| 6 Nov 2024 | BALANCE OF WORKS FOR: (A) ROAD AND DRAIN IMPROVEMENT WORKS AT YISHUN AVE 6 (PART 2); (B) CONSTRUCTION OF SIGNALISED PEDESTRIAN CROSSINGS AT YISHUN AVE 6; (C) CONSTRUCTION OF BUS BAY AND BUS SHELTER AT YISHUN AVE 6; (D) CONSTRUCTION OF BUS SHELTERS AT YISHUN AVE 1 & YISHUN ST 42; (E) CONSTRUCTION OF BUS SHELTERS AT CANBERRA WALK | JUPITER BUILDER PTE. LTD. | S$1,426,000 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | SD ARCHITECTS & ASSOCIATES PTE. LTD. | S$16,341 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | TRANSURBAN ASSOCIATES | S$16,341 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | LCA PRIVATE LIMITED | S$16,341 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | LBS ENGINEERING CONSULTANTS | S$16,341 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | KTB ARCHITECTS | S$16,341 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | JON ARCHITECTS AND ASSOCIATES | S$16,341 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | FOCUS ARCHITECTS | S$16,341 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | DESIGN GROUP INC. ARCHITECTS | S$16,341 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | ARTY ARCHITECTS | S$16,341 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | ARCHIVISION ARCHITECTS | S$16,341 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | YKLUM PTE. LTD. | S$11,260 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | TAN HENG WEE REGISTERED INSPECTOR | S$11,260 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | ENKON INTERNATIONAL CONSULTING ENGINEERS PTE LTD | S$11,260 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | CALVARY PROJECTS & CONSULTANCY | S$11,260 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | C H LIM CONSULTANTS | S$11,260 |
| 1 Nov 2024 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | BMS ENGINEERS PTE LTD | S$11,260 |
| 29 Oct 2024 | DESIGN, SUPPLY, OPERATION, SUPPORT AND MAINTENANCE OF ENHANCED CONSUMER CONTROL UNIT (CCU) ADAPTERS AND SMART HOME SOLUTIONS FOR HDB HOMES | M1 NET LTD. | S$2,871,000 |
| 28 Oct 2024 | Term Contract for Fabrication and Supply of the Prefabricated Extensive Green (PEG) Roof Tray System and its Extension Panels and Sole Distributorship for HDB and Non-HDB Projects | PLANTWERKZ PTE. LTD. | S$45,101 |
| 28 Oct 2024 | INSTRUMENTATION AND MONITORING WORKS INCLUDING AUTOMATED TUNNEL MONITORING SYSTEM FOR THE PROPOSED PUBLIC HOUSING AT PROJECT BZ AND PROJECT CA | ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | S$480,539 |
| 28 Oct 2024 | Renewal of Citrix Licenses | LOGICALIS SINGAPORE PTE. LTD. | S$1,721 |
| 24 Oct 2024 | IMPROVEMENT WORKS TO HDB HUB | CHIONG CONSTRUCTION PTE. LTD. | S$4,868,000 |
| 23 Oct 2024 | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT PROJECT CM, CN & DB | PV VACUUM ENGINEERING PTE LTD | S$6,515,632 |
| 23 Oct 2024 | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT PROJECT CL, CZ & DA | GREENWAVE SOLUTIONS PTE. LTD. | S$7,588,800 |
| 21 Oct 2024 | RENOVATION WORKS TO MY NICE HOME GALLERY | PICO ART INTERNATIONAL PTE. LTD. | S$1,098,116 |
| 15 Oct 2024 | Supply Of Ordinary Portland Cement To The HDB (Batch 53) | LCS PTE. LTD. | S$74 |
| 15 Oct 2024 | Supply of 20MM Aggregate to the HDB (Batch 90) | HL BUILDING MATERIALS PTE. LTD. | S$24 |
| 14 Oct 2024 | ROAD WIDENING AND JUNCTION IMPROVEMENT AT KING GEORGE'S AVENUE AND SYED ALWI ROAD | STARLAND CONSTRUCTION PTE LTD | S$5,388,000 |
| 10 Oct 2024 | Provision Of Cyber Threat Intelligence & Cybersecurity Forensic Retainer Services | ST ENGINEERING INFO-SECURITY PTE. LTD. | S$90,860 |
| 9 Oct 2024 | SUPPLY AND DELIVERY OF BACKPACKS FOR HDB | NANYANG TECH PTE. LTD. | S$35 |
| 2 Oct 2024 | (A) CONSULTANCY SERVICES FOR DESIGN FEASIBILITY STUDY FOR A HDB TOWN CENTRE; (B) MULTI-DISCIPLINARY (ARCHITECTURAL, CIVIL & STRUCTURAL ENGINEERING, MECHANICAL & ELECTRICAL ENGINEERING, QUANTITY SURVEYING & PROJECT MANAGEMENT) CONSULTANCY SERVICES FOR PUBLIC HOUSING PROJECT CO | SAA ARCHITECTS PTE LTD | S$1,000,000 |
| 30 Sept 2024 | ELECTRICAL LOAD UPGRADING PROGRAMME (ELUP) BATCH 2 PROJECT 3 CENTRAL ZONE | ACL CONSTRUCTION (S) PTE LTD | S$30,800,000 |
| 30 Sept 2024 | PART A: BUILDING WORKS AT JURONG EAST NEIGHBOURHOOD 4 CONTRACT 19 (TOTAL: 1,086 DWELLING UNITS); PART B: CONTINGENCY WORKS | STRAITS CONSTRUCTION SINGAPORE PRIVATE LIMITED | S$258,300,000 |
| 30 Sept 2024 | PART A: BUILDING WORKS AT HOUGANG NEIGHBOURHOOD 1 CONTRACT 13A (TOTAL: 360 DWELLING UNITS) PART B: CONTINGENCY WORKS | THONG HUAT BROTHERS (PTE) LIMITED | S$98,000,000 |
| 30 Sept 2024 | PART A: BUILDING WORKS AT BEDOK NEIGHBOURHOOD 5 CONTRACT 18 (TOTAL: 433 DWELLING UNITS); PART B: CONTINGENCY WORKS | KIAN HIAP CONSTRUCTION PTE LTD | S$105,120,000 |
| 30 Sept 2024 | PART A: BUILDING WORKS AT PROJECT DR (TOTAL: 355 DWELLING UNITS); PART B: CONTINGENCY WORKS | PAL-LINK CONSTRUCTION PTE. LTD. | S$100,970,000 |
| 19 Sept 2024 | CONSULTANCY SERVICES TO CONDUCT HERITAGE SURVEY FOR A FUTURE DEVELOPMENT AREA | NATIONAL UNIVERSITY OF SINGAPORE | S$102,000 |
| 17 Sept 2024 | Term Contract for Maintenance of Mechanical and Electrical Systems at HDB Commercial Complexes, Branch Offices and Carparks adjoining Commercial Complexes (Zone 1) | Unknown | S$0 |
| 17 Sept 2024 | Term Contract for Maintenance of Mechanical and Electrical Systems at HDB Commercial Complexes, Branch Offices and Carparks adjoining Commercial Complexes (Zone 2) | Unknown | S$0 |
| 12 Sept 2024 | SPECIALIST PROFESSIONAL ENGINEERING (GEOTECHNICAL) CONSULTANCY SERVICES FOR PROJECT EP | MEINHARDT (SINGAPORE) PTE LTD | S$168,000 |
| 10 Sept 2024 | SPECIALIST ACCREDITED CHECKING SERVICES FOR PROJECT BW | CPG CONSULTANTS PTE LTD | S$72,000 |
| 9 Sept 2024 | Term Contract for Maintenance of Mechanical and Electrical Installations in HDB Civil Defence Shelters for A Period of Thirty-Six (36) Months (Zone 1) | N & T ENGINEERING ENTERPRISE (PTE) LTD | S$751 |
| 9 Sept 2024 | Term Contract for Maintenance of Mechanical and Electrical Installations in HDB Civil Defence Shelters for a Period of Thirty-Six (36) Months (Zone 2) | CHUAN SOON M&E PTE. LTD. | S$831 |
| 6 Sept 2024 | TERM CONTRACT FOR MAINTENANCE OF FIRE PROTECTION SYSTEMS TO VARIOUS HDB COMMERCIAL PROPERTIES (YEAR 2024 TO 2027) (ZONE 2 - CENTRAL & WEST CLUSTER) | J. KEART ALLIANCES PTE. LTD. | S$18,004 |
| 6 Sept 2024 | TERM CONTRACT FOR MAINTENANCE OF FIRE PROTECTION SYSTEMS TO VARIOUS HDB COMMERCIAL PROPERTIES (YEAR 2024 TO 2027) (ZONE 1 - EAST & NORTH CLUSTER) | DIGO CORPORATION PTE. LTD. | S$52,182 |
| 6 Sept 2024 | RENOVATION WORKS AT VARIOUS LEVELS OF THE MINISTRY OF NATIONAL DEVELOPMENT (MND) TOWER BLOCK | LINCOTRADE & ASSOCIATES PTE LTD | S$12,838,888 |
| 6 Sept 2024 | PRODUCTION AND MAINTENANCE / MODIFICATION OF ARCHITECTURAL MODEL FOR A HDB NEIGHBOURHOOD | ANNESING PTE. LTD. | S$171,800 |
| 5 Sept 2024 | Laboratory Services For The Environmental Monitoring And Management Plan For Coastal Development At Pulau Sudong | SETSCO SERVICES PTE LTD | S$578,481 |
| 5 Sept 2024 | Specialist Consultancy Services For The Environmental Monitoring And Management Plan For Coastal Development At Pulau Sudong | DHI WATER & ENVIRONMENT (S) PTE. LTD. | S$14,388,888 |
| 4 Sept 2024 | PROVISON OF SPECIALIZED CYBERSECURITY CONSULTANCY SERVICES FOR A PERIOD OF3 YEARS (YEAR 2024 TO 2026) | EVAGROUP ASIA PACIFIC PTE. LTD. | S$1,590 |
| 30 Aug 2024 | PROJECT 1: PART A: BUILDING WORKS AT TANGLIN HALT CONTRACT 2 (TOTAL 251 DWELLING UNITS); PART B: CONTINGENCY WORKS; PROJECT 2: INFRASTRUCTURE WORKS AT TANGLIN HALT CONTRACT 2 | NEWCON BUILDERS PTE. LTD. | S$182,380,000 |
| 30 Aug 2024 | INSTRUMENTATION AND MONITORING WORKS INCLUDING AUTOMATED TUNNEL MONITORING SYSTEM FOR PROJECT BG | ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | S$490,283 |
| 30 Aug 2024 | PART A: BUILDING WORKS AT PROJECT BC (TOTAL: 753 DWELLING UNITS); PART B: CONTINGENCY WORKS | STRAITS CONSTRUCTION SINGAPORE PRIVATE LIMITED | S$169,200,000 |
| 30 Aug 2024 | Part A: Fire Safety Enhancement Works at MND Complex; Part B: Fire Protection System Maintenance Works at MND Complex | Unknown | S$0 |
| 30 Aug 2024 | PART A: BUILDING WORKS AT CHOA CHU KANG NEIGHBOURHOOD 1 CONTRACT 17 / 18 AND PARK (TOTAL: 465 DWELLING UNITS); PART B: CONTINGENCY WORKS | KEN-PAL (S) PTE. LTD. | S$154,200,000 |
| 30 Aug 2024 | PART A: BUILDING WORKS AT PUNGGOL WEST CONTRACT 41 (TOTAL: 1,026 DWELLING UNITS); PART B: CONTINGENCY WORKS | KAY LIM CONSTRUCTION & TRADING PTE LTD | S$270,900,000 |
| 28 Aug 2024 | PROVISION OF FINANCIAL PLANNING AND ANALYSIS SYSTEM | PRICEWATERHOUSECOOPERS CONSULTING (SINGAPORE) PTE. LTD. | S$3,501,420 |
| 28 Aug 2024 | IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 65) | FOONG AH WENG CONSTRUCTION PTE LTD | S$11,463,000 |
| 28 Aug 2024 | FOURTEEN TERM CONTRACT FOR THE SUPPLY, DELIVERY, INSTALLATION AND MAINTENANCE OF LIFT SURVEILLANCE SYSTEM (LSS) FOR A PERIOD OF FORTY EIGHT (48) MONTHS | IFOCUS PTE LTD | S$1,321,500 |
| 27 Aug 2024 | PROVISION OF CONCEPTUALISATION AND EVENT MANAGEMENT SERVICES FOR: PART A: COMMUNITY CARE APARTMENT EXHIBITION AT HDB HUB ATRIUM AND PART B: MOCK-UP UNIT FOR COMMUNITY CARE APARTMENT | CITYNEON HOLDINGS PTE. LTD. | S$39,521 |
| 26 Aug 2024 | PROVISION OF SECURITY MONITORING SERVICES AND MAINTENANCE OF SECURITY ALARM SYSTEM AT HDB BRANCHES FOR A PERIOD OF 33 MONTHS (YEAR 2024 TO 2027) | PEDRO INVESTIGATIONS & SECURITY SERVICES PTE LTD | S$23,000 |
| 23 Aug 2024 | IMPROVEMENT WORKS TO WOODLANDS NORTH PLAZA AND 888 PLAZA | ML INTERNATIONAL TRADING PTE. LTD. | S$272,368 |
| 19 Aug 2024 | Construction Of Bus Shelters Along Yishun Ave 1 | HWEE WAH ENGINEERING PTE. LTD. | S$1,755,000 |
| 16 Aug 2024 | PART A : BUILDING WORKS AND COMMON GREEN AND INTERIM SURFACE CAR PARK AND RECONFIGURATION OF EXISTING SURFACE CAR PARK AT PROJECT BB (TOTAL: 897 DWELLING UNITS); PART B : CONTINGENCY WORKS | CHAN RONG FEN BUILDING CONSTRUCTION PTE LTD | S$220,000,000 |
| 16 Aug 2024 | Provision of Managing Agent Services and Improvement Works within HDB Flats for a period of 2 years (North Zone) | Unknown | S$0 |
| 15 Aug 2024 | SPECIALIST ACCREDITED CHECKING SERVICES FOR PROJECT BJ | TERS CONSULTING PTE. LTD. | S$89,600 |
| 13 Aug 2024 | Provision of Managing Agent Services and Improvement Works within HDB Flats for a period of 2 years (North-East Zone) | KIM YEW INTEGRATED PTE. LTD. | S$65,008 |
| 13 Aug 2024 | Provision of Managing Agent Services and Improvement Works within HDB Flats for a period of 2 years (West Zone) | CTM FACILITIES MANAGEMENT PTE. LTD. | S$163,450 |
| 13 Aug 2024 | (A) IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 64) AND (B) TERM CONTRACT FOR MINOR IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (ZONE 2) | SIONG CONSTRUCTION & ENGINEERING PTE. LTD. | S$8,876,000 |
| 13 Aug 2024 | Provision of Managing Agent Services and Improvement Works within HDB Flats for a period of 2 years (Central Zone) | SAVILLS PROPERTY MANAGEMENT PTE. LTD. | S$81,728 |
| 13 Aug 2024 | (A) IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 62) AND (B) TERM CONTRACT FOR MINOR IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (ZONE 1) | FOONG AH WENG CONSTRUCTION PTE LTD | S$7,693,000 |
| 13 Aug 2024 | (A) CONSTRUCTION OF ROAD RELATED FACILITIES (RRF) AT TENGAH TOWN (PHASE 3); (B) UPGRADING OF EXISTING BUS STOP AT CHOA CHU KANG N8; (C) SEWER RECTIFICATION WORK AT CHOA CHU KANG N8; (D) CONSTRUCTION OF TRUNK SEWER AT TENGAH PARK AVENUE | SING HENG HOE CONSTRUCTION (1988) PTE LTD | S$6,070,858 |
| 13 Aug 2024 | Provision of Managing Agent Services and Improvement Works within HDB Flats for a period of 2 years (East Zone) | ST ENGINEERING SYNTHESIS PTE. LTD. | S$88,554 |
| 12 Aug 2024 | 3D SIMULATION-READY MODELS FOR ENVIRONMENTAL MODELLING | WOOLPERT SINGAPORE PTE. LTD. | S$77,400 |
| 12 Aug 2024 | PROVISION OF SITE SUPERVISION SERVICES FOR SPRUCING WORKS | OCTA METIER PTE. LTD. | S$21,800 |
| 12 Aug 2024 | TERM CONTRACT FOR PROVISION OF SECURITY SERVICES AT MND COMPLEX FOR A PERIOD OF THREE (3) YEARS | ONEBERRY TECHNOLOGIES PTE. LTD. | S$324,933 |
| 12 Aug 2024 | SPRUCING WORKS FOR HDB FLATS (CONTRACT 3) | HTC CONSTRUCTION PTE. LTD. | S$85,956 |
| 12 Aug 2024 | SPRUCING WORKS FOR HDB FLATS (CONTRACT 2) | HEPTACON CONSTRUCTION PTE. LTD. | S$85,294 |
| 12 Aug 2024 | SPRUCING WORKS FOR HDB FLATS (CONTRACT 1) | TEAMBUILD ENGINEERING & CONSTRUCTION PTE. LTD. | S$189,916 |
| 8 Aug 2024 | Supply of 20MM Aggregate To The HDB (Batch 89) | SAMWOH RESOURCES PTE LTD | S$24 |
| 8 Aug 2024 | PROVISION OF INTEGRATED FACILITIES MANAGEMENT (IFM) SERVICES TO COMMERCIAL PROPERTIES (SECTOR 2) | CPG FACILITIES MANAGEMENT PTE LTD | S$1,039,680 |
| 7 Aug 2024 | DEMOLITION WORKS FOR HDB RESIDENTIAL BLOCKS (BATCH 17- PARCEL 2A) | HAO DA PTE LTD | S$1,377,811 |
| 2 Aug 2024 | PREPARATION AND DELIVERY OF ARCHITECTURAL PERSPECTIVES FOR A HDB NEIGHBOURHOOD | ENARI PTE. LTD. | S$8,800 |
| 2 Aug 2024 | Consultancy Services to Conduct Heritage Impact Assessment for Gillman Barracks Site | STUDIO LAPIS CONSERVATION PTE. LTD. | S$405,000 |
| 1 Aug 2024 | INSTRUMENTATION AND MONITORING WORKS OF AUTOMATIC TUNNEL MONITORING SYSTEM FOR PROJECT BS | SENSINGTECH PTE. LTD. | S$148,440 |
| 31 Jul 2024 | Supply of Fine Aggregates to the HDB (Batch 82) | ORIENT NATURAL RESOURCES PTE. LTD. | S$27 |
| 30 Jul 2024 | Soil Investigation Works on HDB Land at Bedok South Avenue 3 | RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | S$190,200 |
| 29 Jul 2024 | MECHANICAL AND ELECTRICAL CYCLICAL IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 29) | SRK ENGINEERING PTE. LTD. | S$5,737,800 |
| 26 Jul 2024 | PROVISION OF LANDSCAPING SERVICES ON TOPMOST PARKING DECKS OF EXISTING MULTI-STOREY CAR PARKS (MSCP) (BATCH 13) | PLANTWERKZ PTE. LTD. | S$143,724 |
| 19 Jul 2024 | ACCREDITED CHECKING SERVICES FOR PROJECT BR | CKMBT INTERNATIONAL PTE. LTD. | S$45,800 |
| 15 Jul 2024 | SUPPLY OF PROGRAMMING AND IT RELATED SERVICES FOR A PERIOD OF 3 YEARS (CONTRACT 43 - 2024) | TECHCOM SOLUTIONS PTE. LTD. | S$3,600 |
| 15 Jul 2024 | SUPPLY OF PROGRAMMING AND IT RELATED SERVICES FOR A PERIOD OF 3 YEARS (CONTRACT 41 - 2024) | WSH EXPERTS PTE. LTD. | S$3,600 |
| 15 Jul 2024 | SUPPLY OF PROGRAMMING AND IT RELATED SERVICES FOR A PERIOD OF 3 YEARS (CONTRACT 42 - 2024) | INFORMA SOLUTIONS PTE. LTD. | S$3,785 |
| 12 Jul 2024 | SUPPLY, INSTALLATION AND MAINTENANCE OF 4 NUMBERS OF COMPRESSION TESTING MACHINES TO HDB ENGINEERING MATERIALS LABORATORY | AVERY SYSTEM | S$41,578 |
| 10 Jul 2024 | Cyber Resilient Storage for Enterprise Server Backup | NCS COMMUNICATIONS ENGINEERING PTE. LTD. | S$629,975 |
| 10 Jul 2024 | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT PROJECT CQ & CX-CY | GREENWAVE SOLUTIONS PTE. LTD. | S$4,590,700 |
| 10 Jul 2024 | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT PROJECT CV-CW, CU & CK | PV VACUUM ENGINEERING PTE LTD | S$5,784,329 |
| 8 Jul 2024 | Supply, Delivery, Installation and Maintenance of Lift Monitoring Device for TeleMonitoring System (Phase 16) | IFOCUS PTE LTD | S$442,200 |
| 8 Jul 2024 | DEMOLITION WORKS FOR PROJECT B (BATCH 24) | BENG SOON MACHINERY SERVICES (SINGAPORE) PTE LTD | S$5,909,000 |
| 4 Jul 2024 | Addition and Alteration Works to Car Parks (C10) | SING YIET CIVIL ENGINEERING CONTRACTOR PTE LTD | S$8,988,000 |
| 2 Jul 2024 | IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 61) | SH INTEGRATED SERVICES PTE. LTD. | S$8,111,111 |
| 1 Jul 2024 | PART A: BUILDING WORKS AT BUKIT PANJANG NEIGHBOURHOOD 1 CONTRACT 14 (TOTAL: 334 DWELLING UNITS); PART B: CONTINGENCY WORKS | QING FENG CONSTRUCTION PTE LTD | S$89,500,000 |
| 28 Jun 2024 | Renewal and Purchase of HCL Software Licenses and Support Services | CRAYON PTE. LTD. | S$2,338,054 |
| 28 Jun 2024 | DESIGN, DEVELOP, TEST, INTEGRATE, COMMISSION AND MAINTENANCE OF IDENTITY AND ACCESS MANAGEMENT SYSTEM (IDAMS) | HEXADIUS CONSULTING PTE. LTD. | S$1,491,000 |
| 28 Jun 2024 | PART A: BUILDING WORKS AT WOODLANDS NEIGHBOURHOOD 9 CONTRACT 2 (TOTAL: 848 DWELLING UNITS); PART B: CONTINGENCY WORKS | WELLTECH CONSTRUCTION PTE LTD | S$214,600,000 |
| 28 Jun 2024 | PROJECT 1: PART A: BUILDING WORKS AT PROJECT DL (TOTAL: 528 DWELLING UNITS); PART B: CONTINGENCY WORKS. PROJECT 2: DRAINAGE RECONSTRUCTION WORKS ALONG NEW UPPER CHANGI ROAD | LIM WEN HENG CONSTRUCTION PTE LTD | S$126,343,900 |
| 28 Jun 2024 | PART A: BUILDING WORKS AT WOODLANDS NEIGHBOURHOOD 1 CONTRACT 31 (TOTAL: 399 DWELLING UNITS); PART B: CONTINGENCY WORKS | LC&T BUILDER (1971) PTE. LTD. | S$126,900,000 |
| 28 Jun 2024 | PART A: BUILDING WORKS AT JURONG WEST NEIGHBOURHOOD 4 CONTRACT 22 (TOTAL: 716 DWELLING UNITS); PART B: CONTINGENCY WORKS | TEAMBUILD ENGINEERING & CONSTRUCTION PTE. LTD. | S$194,788,000 |
| 26 Jun 2024 | RENEWAL OF IBM SYSTEM SOFTWARE AND MAINTENANCE FOR THREE (3) YEARS | ST ENGINEERING TRAINING & SIMULATION SYSTEMS PTE. LTD. | S$21,506,353 |
| 14 Jun 2024 | Maintenance of Tremor Monitoring System (TRS) 2024 | CAMBRIAN ENGINEERING CORPORATION PTE LTD | S$24,940 |
| 14 Jun 2024 | ACCREDITED CHECKING SERVICES FOR CONSTRUCTION OF URBANWATER HARVESTING SYSTEM AT EXISTING ESTATES | ECAS CONSULTANTS PTE. LTD. | S$145,000 |
| 12 Jun 2024 | DEMOLITION WORKS FOR HDB RESIDENTIAL BLOCKS (BATCH 17 - PARCEL 3) | BENG SIEW CONSTRUCTION PTE LTD | S$4,794,100 |
| 6 Jun 2024 | ENGINEERING CONSULTANCY SERVICES FOR CERTIFICATION OF FITNESS OF RECLAIMED LAND FOR THE PURPOSE OF PROCLAMATION OF POLDER AT AREAS A AND C OF PULAU TEKONG | ABL CONSULTANTS PTE. LTD. | S$120,000 |
| 31 May 2024 | PART A: BUILDING WORKS AT PROJECT AO (TOTAL: 741 DWELLING UNITS); PART B: CONTINGENCY WORKS | LBD ENGINEERING PTE. LTD. | S$175,000,000 |
| 31 May 2024 | Infilling Works (Phase 4) | TOA CORPORATION | S$108,597,000 |
| 31 May 2024 | PART A: BUILDING WORKS AT WOODLANDS NEIGHBOURHOOD 4 CONTRACT 7 (TOTAL: 1,127 DWELLING UNITS); PART B: CONTINGENCY WORKS | VICO CONSTRUCTION PTE. LTD. | S$248,777,000 |
| 31 May 2024 | PART A: BUILDING WORKS AT PROJECT AR (TOTAL: 545 DWELLING UNITS); PART B: CONTINGENCY WORKS | TEAMBUILD ENGINEERING & CONSTRUCTION PTE. LTD. | S$169,628,000 |
| 31 May 2024 | PART A: BUILDING WORKS AT BUKIT MERAH CONTRACT 54 AND 54A (TOTAL 1,462 DWELLING UNITS); PART B: CONTINGENCY WORKS | TEAMBUILD ENGINEERING & CONSTRUCTION PTE. LTD. | S$427,000,000 |
| 30 May 2024 | SUPPLY OF TESTING SERVICES TO MECHANICAL COUPLER FOR REINFORCEMENT BAR SIZE OF 16MM DIAMETER AND 20MM DIAMETER | SETSCO SERVICES PTE LTD | S$15,666 |
| 30 May 2024 | MULTI-DISCIPLINARY (CIVIL & STRUCTURAL ENGINEERING AND QUANTITY SURVEYING) CONSULTANCY SERVICES FOR VARIOUS DEMOLITION PROJECTS (BATCH 29) | ANG & ONG CONSULTANTS PTE. LTD. | S$426,000 |
| 24 May 2024 | INSTRUMENTATION MONITORING SERVICES FOR EARTHWORKS AND INFRASTRUCTURE WORKS AT TENGAH TOWN (PHASE 5) | GEOAPPLICATION ENGINEERS PTE. LTD. | S$87,855 |
| 24 May 2024 | DEMOLITION WORKS FOR PROJECT B (BATCH 23) | AIK SUN DEMOLITION & ENGINEERING PTE LTD | S$1,200,000 |
| 24 May 2024 | Demolition Works for Project A (Batch 28) | HWA AIK ENGINEERING PTE. LTD. | S$2,700,000 |
| 17 May 2024 | Provision of Shuttle Bus Services for Commercial Complexes for a Period of Two (2) Years | BT&TAN TRANSPORT PTE. LTD. | S$25,900 |
| 15 May 2024 | TERM CONTRACT FOR MAINTENANCE OF FIRE PROTECTION SYSTEMS AT HDB HUB FOR A PERIOD OF THIRTY-SIX (36) MONTHS | CHUBB SINGAPORE PRIVATE LIMITED | S$16,790 |
| 15 May 2024 | Installation, Upgrading, Testing, Commissioning and Maintenance of (COTS) Customer Communication Management Software - Quadient Inspire | ESPIRE INFOLABS (SINGAPORE) PTE. LTD. | S$1,203,488 |
| 15 May 2024 | Design, Supply, Installation and Maintenance for Lift Monitoring Devices (LMD) under the LMD Enhancement Programme Phase 2 - 1,500 units | WILLOWGLEN SERVICES PTE LTD | S$2,273,505 |
| 10 May 2024 | Installation of Safety Fencing at 15 MSCP Top Deck Community / Allotment Gardens | BAN SENG ENGINEERING PTE. LTD. | S$112,813 |
| 10 May 2024 | PROVISION OF FACILITIES MANAGEMENT SERVICES (YEAR 2024 TO 2027) | C+H ASSOCIATES PTE. LTD. | S$232,800 |
| 9 May 2024 | Demolition Works For State Property - Batch 20 Project A | I-LOGIC CONCEPTS PTE. LTD. | S$860,400 |
| 9 May 2024 | Mechanical and Electrical Cyclical Improvement Works to Multi-Storey Car Parks (Batch 23) | LEAP INTEGRATED PTE. LTD. | S$3,525,705 |
| 8 May 2024 | Repair of Trunk Sewer No. 9 at Anchorvale St, Anchorvale Crescent, Anchorvale Link and Sengkang East Road | PERMA-LINER INDUSTRIES (SINGAPORE) PTE. LTD. | S$1,889,123 |
| 8 May 2024 | (A) Road Repair and Resurfacing at Choa Chu Kang; (B) Road Repair and Resurfacing at Bukit Batok; (C) Re-turfing for Slopes at Bukit Batok; (D) CE Term Contract (Balance of Works) | AVENUE ENGINEERING PTE. LTD. | S$9,000,000 |
| 7 May 2024 | Construction of Pedestrian Overhead Bridge at Tampines Avenue 12 | UNITED SPECIALISTS PTE LTD | S$2,512,000 |
| 6 May 2024 | PART A: BUILDING WORKS AT KALLANG WHAMPOA CONTRACT 72 (TOTAL: 1,040 DWELLING UNITS); PART B: CONTINGENCY WORKS | CHAN RONG FEN BUILDING CONSTRUCTION PTE LTD | S$233,000,000 |
| 3 May 2024 | DESIGN & RECONFIGURATION WORKS FOR OFFICE SPACE AT HDB HUB (LEVEL 31) | YUAN MEI CHEN (S) PTE. LTD. | S$995,786 |
| 3 May 2024 | Addition And Alteration Works to Toilets (Phase 2), Lift Lobbies & Escalator at HDB Hub | DN HYBRID PTE. LTD. | S$9,273,000 |
| 30 Apr 2024 | PROPOSED DEMOLITION OF EXISTING BUILDINGS AND ANCILLARY STRUCTURES (BATCH 25) | I-LOGIC CONCEPTS PTE. LTD. | S$1,548,000 |
| 29 Apr 2024 | ELECTRICAL LOAD UPGRADING PROGRAMME (ELUP) BATCH 3 PROJECT 2 (SOUTH ZONE) | W'RAY CONSTRUCTION PTE. LTD. | S$38,688,000 |
| 25 Apr 2024 | ABC WATERS PROFESSIONAL CONSULTANCY SERVICES FOR THE PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT BZ AND PROJECT CA | VENGINEERS CONSULTANCY PTE. LTD. | S$116,000 |
| 24 Apr 2024 | (A) SITE PREPARATION WORKS AT TENGAH TOWN (PHASE 5); (B) TERM CONTRACT FOR CIVIL ENGINEERING WORKS | KTC CIVIL ENGINEERING & CONSTRUCTION PTE LTD | S$39,545,000 |
| 19 Apr 2024 | APPOINTMENT OF INDEPENDENT 3RD PARTY ASSESSOR FOR SOLAR PV ASSESSMENT (SOLARNOVA PHASE 8) AT HDB RESIDENTIAL BLOCKS | NATIONAL UNIVERSITY OF SINGAPORE | S$567,600 |
| 19 Apr 2024 | OPEN SYSTEM DISK STORAGE AND SAN SWITCHES | NCS COMMUNICATIONS ENGINEERING PTE. LTD. | S$2,126,937 |
| 18 Apr 2024 | THIRTY-FIFTH TERM CONTRACT FOR THE SUPPLY, DELIVERY, INSTALLATION AND MAINTENANCE OF LIFTS FOR THREE-YEAR PERIOD | HITACHI ELEVATOR ASIA PTE. LTD. | S$12,294,565 |
| 17 Apr 2024 | Supply of BIM Specialist Services (Batch 4B) | BIM ENGINEERING & CONSTRUCTION PTE. LTD. | S$5,150 |
| 17 Apr 2024 | Supply of BIM Specialist Services (Batch 4A) | ACEPLP.COM PTE LTD | S$13,200 |
| 12 Apr 2024 | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to Various HDB Building Sites (Batch 12) | ROBIN VILLAGE DEVELOPMENT PTE. LTD. | S$3,591 |
| 12 Apr 2024 | Supply of Fine Aggregates to the HDB (Batch 81) | ORIENT NATURAL RESOURCES PTE. LTD. | S$27 |
| 12 Apr 2024 | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to Various HDB Building Sites (Batch 14) | SUNWAY CONCRETE PRODUCTS (S) PTE LTD | S$3,563 |
| 12 Apr 2024 | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to Various HDB Building Sites (Batch 13) | PRECAST CONCRETE PTE. LTD. | S$3,801 |
| 12 Apr 2024 | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to Various HDB Building Sites (Batch 11) | HL BUILDING MATERIALS PTE. LTD. | S$4,120 |
| 12 Apr 2024 | Provision Of Professional Services To Maintain, Support And Enhance The HDB Digital Document Repository (HDB DDR) For Three (3) Years | FPT ASIA PACIFIC PTE. LTD. | S$42,285 |
| 12 Apr 2024 | Provision of Management Services (Year 2024 to 2027) | New Hope Community Services | S$118,180 |
| 11 Apr 2024 | (A) CONSTRUCTION OF SIN MING STREET (PART 1); (B) TRUNK SEWER DIVERSION AT SIN MING ESTATE | SAMKANG CONSTRUCTION PTE LTD | S$6,432,583 |
| 8 Apr 2024 | Earthworks At Yishun Contract No. 2 | YENG TONG CONSTRUCTION PTE LTD | S$18,266,917 |
| 2 Apr 2024 | (A) CONSTRUCTION OF BUS SHELTERS ALONG TAMPINES ST. 96 (B) CONSTRUCTION OF BUS SHELTERS ALONG TAMPINES ST. 95 (C) CONSTRUCTION OF HIGH COVERED LINKWAY ACROSS TAMPINES ST. 96 | CHANG FENG CONSTRUCTION PTE. LTD. | S$1,813,000 |
| 1 Apr 2024 | ADDITION AND ALTERATION (A&A) WORKS AT BLK 712, ANG MO KIO AVE 6 | E-TENG BUILDERS PTE. LTD. | S$49,800 |
| 26 Mar 2024 | PROVISION OF PUBLIC LIABILITY INSURANCE FOR THE PERIOD 1 APRIL 2024 TO 31 MARCH 2027 | WILLY INSURANCE BROKERS PTE. LTD. | S$135,000 |
| 25 Mar 2024 | Supply of Autodesk Software | INNOCOM TECHNOLOGIES PTE LTD | S$176,630 |
| 22 Mar 2024 | DESIGN AND RENOVATION WORKS TO THE EAST WING LEVEL 8 OFFICE EXTENSION AND ENHANCEMENT WORKS TO EAST WING 19 AND WEST WING 26 OFFICES AT HDB HUB | YUAN MEI CHEN (S) PTE. LTD. | S$698,880 |
| 18 Mar 2024 | Instrumentation and Monitoring Works for Proposed Public Housing Development at Ulu Pandan Contract 2 and Contract 3 | KWANG SING ENGINEERING PTE. LTD. | S$316,188 |
| 15 Mar 2024 | PROVISION OF FIRE INSURANCE FOR SOLD HDB FLATS FOR THE PERIOD 16 AUGUST 2024 TO 15 AUGUST 2029 | ETIQA INSURANCE PTE. LTD. | S$21 |
| 14 Mar 2024 | Site Clearance & Earthworks at Telok Blangah (Contract 2) | KTC CIVIL ENGINEERING & CONSTRUCTION PTE LTD | S$24,150,000 |
| 13 Mar 2024 | Project 1: Balance of Works at Tampines St 92, Tampines Ave 1 & Tampines Concourse; Project 2: Balance of Works at Punggol; Project 3: Balance of Works at Tengah (Phase 1) | GUAN JOO CONSTRUCTION PTE LTD | S$21,490,755 |
| 11 Mar 2024 | INSTRUMENTATION AND MONITORING WORKS FOR INFRASTRUCTURE WORKS AT TOA PAYOH WEST (CONTRACT 1) | RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | S$509,474 |
| 8 Mar 2024 | IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 60) | STRATEGIC ENGINEERING & CONSTRUCTION PTE. LTD. | S$9,770,000 |
| 7 Mar 2024 | PART A: BUILDING WORKS AT CHOA CHU KANG NEIGHBOURHOOD 1 CONTRACT 19-20 PART I & PARK (TOTAL: 873 DWELLING UNITS); PART B: CONTINGENCY WORKS | KEN-PAL (S) PTE. LTD. | S$249,500,000 |
| 6 Mar 2024 | Appointment of Panel of Contractors for Provision and Supply of ICT Professional Services (Augmentation Resources) for a Period of Three Years with Option to Extend for Two Years | ACTIVATE INTERACTIVE PTE LTD | S$15,525 |
| 6 Mar 2024 | SITE CLEARANCE AND EARTHWORKS AT GEYLANG | KOK KIAT MACHINERY PTE LTD | S$1,442,400 |
| 6 Mar 2024 | PROJECT 1: ADDITION AND ALTERATION WORKS TO CAR PARKS (C9) - BALANCE OF WORKS; PROJECT 2: IMPROVEMENT WORKS TO SURFACE CAR PARKS (BATCH 79) - BALANCE OF WORKS | SHINCON INDUSTRIAL PTE. LTD. | S$6,088,651 |
| 6 Mar 2024 | Appointment of Panel of Contractors for Provision and Supply of ICT Professional Services (Augmentation Resources) for a Period of Three Years with Option to Extend for Two Years | WSH EXPERTS PTE. LTD. | S$14,790 |
| 6 Mar 2024 | Appointment of Panel of Contractors for Provision and Supply of ICT Professional Services (Augmentation Resources) for a Period of Three Years with Option to Extend for Two Years | TOPPAN ECQUARIA PTE. LTD. | S$14,450 |
| 6 Mar 2024 | Appointment of Panel of Contractors for Provision and Supply of ICT Professional Services (Augmentation Resources) for a Period of Three Years with Option to Extend for Two Years | TATA CONSULTANCY SERVICES ASIA PACIFIC PTE. LTD. | S$9,787 |
| 6 Mar 2024 | Appointment of Panel of Contractors for Provision and Supply of ICT Professional Services (Augmentation Resources) for a Period of Three Years with Option to Extend for Two Years | MORGAN MCKINLEY PTE. LTD. | S$4,559 |
| 6 Mar 2024 | Appointment of Panel of Contractors for Provision and Supply of ICT Professional Services (Augmentation Resources) for a Period of Three Years with Option to Extend for Two Years | COGNIZANT TECHNOLOGY SOLUTIONS ASIA PACIFIC PTE. LTD. | S$5,152 |
| 5 Mar 2024 | Construction of Trunk Sewer at Indus Road | HUNG YAO SHENG ENGINEERING PTE. LTD. | S$1,688,560 |
| 1 Mar 2024 | SERVICES FOR BUILDING OF DIGITAL UNITISED MODEL FOR HDB BLOCKS IN HDB TOWNS | ARUP SINGAPORE PRIVATE LIMITED | S$1,859,000 |
| 1 Mar 2024 | Term Contract For The Production And Delivery Of Precast Concrete Components At HDB Centre Of Building Research (Batch 5) | ROBIN VILLAGE DEVELOPMENT PTE. LTD. | S$201,723 |
| 29 Feb 2024 | PART A: BUILDING WORKS AT PROJECT CP (TOTAL: 689 DWELLING UNITS); PART B: CONTINGENCY WORKS | LC&T BUILDER (1971) PTE. LTD. | S$175,100,000 |
| 29 Feb 2024 | PART A: BUILDING WORKS AT YISHUN NEIGHBOURHOOD 5 CONTRACT 12 (TOTAL: 725 DWELLING UNITS); PART B: CONTINGENCY WORKS | LC&T BUILDER (1971) PTE. LTD. | S$190,000,000 |
| 29 Feb 2024 | PART A: BUILDING WORKS AT CHOA CHU KANG NEIGHBOURHOOD 1 CONTRACT 19-20 PART II & PARK & PEDESTRIAN BRIDGE (TOTAL: 1,022 DWELLING UNITS); PART B: CONTINGENCY WORKS | JIA YI CONSTRUCTION PTE. LTD. | S$307,800,000 |
| 29 Feb 2024 | INSTRUMENTATION AND MONITORING WORKS FOR THE PROPOSED PUBLIC HOUSING DEVELOPMENT AT CHOA CHU KANG N1 C19-20 PART 2 & PARK | KWANG SING ENGINEERING PTE. LTD. | S$76,474 |
| 28 Feb 2024 | Term Contract For Provision of Technical Officers For Building Inspections and Construction Audits at New Construction Sites | LANDMARK ASIA PACIFIC PTE. LTD. | S$3,296 |
| 28 Feb 2024 | Supply Of Ordinary Portland Cement To The HDB (Batch 52) | ENGRO CORPORATION LIMITED | S$83 |
| 27 Feb 2024 | Addition and Alteration Works at Level 5 & Level 6 of HDB Hub | EXPONENT PTE. LTD. | S$1,695,049 |
| 23 Feb 2024 | Supply of 20mm Aggregate to the HDB (Batch 88) | SAMWOH RESOURCES PTE LTD | S$23 |
| 22 Feb 2024 | Periodic Structural Inspection and Related Works at Various HDB Estates (Batch 39A-2023/24) | CKMBT INTERNATIONAL PTE. LTD. | S$475 |
| 20 Feb 2024 | DIVERSION OF EXISTING WATER MAINS AT JURONG WEST NEIGHBOURHOOD 4 CONTRACT 22 | SING & SAN CONSTRUCTION PTE LTD | S$147,000 |
| 19 Feb 2024 | IMPROVEMENT WORKS FOR OFFICE ENTRANCES AT HDB HUB | ENTRE' AUTOMATICS PTE. LTD. | S$7,100 |
| 19 Feb 2024 | Addition and Alteration Works at East Wing, Level 14, HDB Hub | YUAN MEI CHEN (S) PTE. LTD. | S$1,282,280 |
| 16 Feb 2024 | Major Infrastructure Works at Neighbourhood B (Phase 1A) | KOK TONG CONSTRUCTION PTE LTD | S$15,450,000 |
| 16 Feb 2024 | Earthworks At Yishun Contract No. 1 (Balance Of Works) | CHYE JOO CONSTRUCTION PTE LTD | S$14,676,860 |
| 7 Feb 2024 | ACCREDITED CHECKING SERVICES FOR PROJECT AM | JIB SPECIALIST CONSULTANTS PTE. LTD. | S$88,000 |
| 2 Feb 2024 | Periodic Structural Inspection and Related Works at Various HDB Estates (Batch 37-2023/24W) | LANDMARK ASIA PACIFIC PTE. LTD. | S$2,560 |
| 1 Feb 2024 | The Development of the HDB Smart Research Management System | SIMPLIFYNEXT PTE. LTD. | S$1,006,700 |
| 1 Feb 2024 | Provision of Resident Technical Officers (RTO) Services for Supervision Works | RCY PTE. LTD. | S$56,196 |
| 1 Feb 2024 | PROVISION OF LANDSCAPING SERVICES ON TOPMOST PARKING DECKS OF EXISTING MULTI- STOREY CAR PARKS (MSCP) (BATCH 12) | GARDEN WORKS PTE. LTD. | S$320,000 |
| 31 Jan 2024 | Periodic Structural Inspection and Related Works at Various HDB Estates (Batch 38-2023/24C2) | FONG CONSULT PTE. LTD. | S$2,220 |
| 31 Jan 2024 | PART A: BUILDING WORKS AT ULU PANDAN CONTRACT 3 (TOTAL: 890 DWELLING UNITS); PART B: CONTINGENCY WORKS | WELLTECH CONSTRUCTION PTE LTD | S$301,600,000 |
| 31 Jan 2024 | PART A: BUILDING WORKS AT SERANGOON NORTH CONTRACT 21 (TOTAL: 330 DWELLING UNITS); PART B: CONTINGENCY WORKS | NIPPON BUILDERS PTE. LTD. | S$97,555,555 |
| 29 Jan 2024 | RENEWAL OF ENTERPRISE VULNERABILITIES ASSESSMENT SYSTEM | ST ENGINEERING INFO-SECURITY PTE. LTD. | S$242,400 |
| 29 Jan 2024 | Design & Reconfiguration Works for Office Space at HDB Hub (Level 30) | D' PERCEPTION SINGAPORE PTE. LTD. | S$627,955 |
| 29 Jan 2024 | Periodic Structural Inspection and Related Works at Various HDB Estates (Batch 36-2023/24E2) | BUREAU VERITAS BUILDINGS & INFRASTRUCTURE PTE. LTD. | S$2,460 |
| 22 Jan 2024 | PROVISION OF SERVICES FOR MANAGEMENT OF ENTERPRISE SYSTEM | KYNDRYL (SINGAPORE) PTE. LTD. | S$332,143 |
| 19 Jan 2024 | PROVISON OF CAR PARK OPERATION SERVICE FOR A PERIOD OF 3 YEARS | CBM PARKING PTE. LTD. | S$11,800 |
| 16 Jan 2024 | ADDITION & ALTERATION WORKS AT HDB HUB ATRIUM LEVEL 3 | D' PERCEPTION SINGAPORE PTE. LTD. | S$8,561,533 |
| 11 Jan 2024 | Design and Renovation Works at Various Office Spaces at HDB Hub (Basement 1, Level 12, 20 and 21) | A.MAX PTE. LTD. | S$2,660,000 |
| 8 Jan 2024 | Provision of IT Advisory and Research Services | GARTNER ADVISORY (SINGAPORE) PTE LTD | S$1,227,400 |
| 8 Jan 2024 | SPRUCING WORKS FOR HDB FLATS | NKH CONSTRUCTION EQUIPMENT PTE. LTD. | S$19,388 |
| 5 Jan 2024 | Instrumentation and Monitoring Works for Infrastructure Works at Bedok Town | APS ASIA PDA ENTERPRISE PTE. LTD. | S$185,193 |
| 4 Jan 2024 | DESIGN, CONTENT DEVELOPMENT AND DISTRIBUTION OF COMMUNITY PUBLICATION 2024/2025 | REDBEAN DE PTE. LTD. | S$16,701 |
| 4 Jan 2024 | Periodic Structural Inspection and Related Works at Various HDB Estates (Batch 35-2023/24C1) | OCTA CONSULTANTS PTE. LTD. | S$2,150 |
| 4 Jan 2024 | Maintenance Of Terminal Emulation Software Licences For Three (3) Years | UIC ASIAN COMPUTER SERVICES PTE LTD | S$179 |
| 29 Dec 2023 | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT - PROJECT AE | RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | S$119,979 |
| 29 Dec 2023 | PART A: BUILDING WORKS AT TENGAH PLANTATION CONTRACT 8 (TOTAL: 971 DWELLING UNITS); PART B: CONTINGENCY WORKS | NEWCON BUILDERS PTE. LTD. | S$282,380,000 |
| 29 Dec 2023 | PART A: BUILDING WORKS AT TENGAH PLANTATION CONTRACT 5 & COMMON GREEN (TOTAL: 1,261 DWELLING UNITS); PART B: CONTINGENCY WORKS | KEONG HONG CONSTRUCTION PTE LTD | S$293,730,000 |
| 29 Dec 2023 | EARTHWORK AND SITE WORK FOR PROPOSED PUBLIC HOUSING DEVELOPMENT - PROJECT AE | HO CHOON TRANSPORT & CONSTRUCTION PTE LTD | S$1,600,000 |
| 29 Dec 2023 | PART A: BUILDING WORKS AT ULU PANDAN CONTRACT 1, CONTRACT 2 AND PARK (TOTAL: 2,062 DWELLING UNITS); PART B: CONTINGENCY WORKS | CES ENGINEERING & CONSTRUCTION PTE. LTD. | S$606,000,000 |
| 29 Dec 2023 | Development and Piloting Of A Smart Facilities Management (FM) Platform as-a-service to Town Councils | SURBANA TECHNOLOGIES PTE. LTD. | S$650,000 |
| 29 Dec 2023 | (A) SITE CLEARANCE AND EARTHWORKS AT QUEENSTOWN; (B) SEWER DIVERSION WORKS AT QUEENSTOWN | WFY CIVIL ENGINEERING PTE. LTD. | S$7,313,000 |
| 29 Dec 2023 | IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 59) | STRATEGIC ENGINEERING & CONSTRUCTION PTE. LTD. | S$8,970,000 |
| 29 Dec 2023 | PART A: BUILDING WORKS AT TENGAH PARK CONTRACT 1B (TOTAL: 981 DWELLING UNITS); PART B: CONTINGENCY WORKS | TEAMBUILD ENGINEERING & CONSTRUCTION PTE. LTD. | S$283,000,000 |
| 28 Dec 2023 | RENEWAL OF BIM REMOTE ACCESS SOFTWARE LICENSES & MAINTENANCE SUPPORT | LOGICALIS SINGAPORE PTE. LTD. | S$118,500 |
| 22 Dec 2023 | MECHANICAL AND ELECTRICAL CYCLICAL IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 27) | DIGO CORPORATION PTE. LTD. | S$2,969,324 |
| 22 Dec 2023 | Soil Investigation for the Proposed Development | ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | S$3,058,326 |
| 21 Dec 2023 | ADDITION AND ALTERATIONS WORKS TO TOILETS AT HDB HUB | SH INTEGRATED SERVICES PTE. LTD. | S$5,072,420 |
| 21 Dec 2023 | SUPPLY AND DELIVERY OF ENVELOPES TO HDB FOR A PERIOD OF 2 YEARS (YEAR 2023 TO 2025) | NANYANG ENVPAP PTE. LTD. | S$6 |
| 20 Dec 2023 | (A) CONSTRUCTION OF ROADS AND ROADSIDE DRAINS WITHIN TENGAH TOWN (PHASE 4); (B) CONSTRUCTION OF UTILITIES SERVICES DUCT WITHIN TENGAH TOWN (PHASE 4); (C) CONSTRUCTION OF TRUNK SEWERS AT TENGAH TOWN (PHASE 4); (D) CONSTRUCTION OF ROADSIDE DRAIN ALONG TENGAH GARDEN AVENUE | SHUAN HUAT TRACTOR SERVICES PTE. LTD. | S$30,303,800 |
| 19 Dec 2023 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | Unknown | S$0 |
| 18 Dec 2023 | TERM CONTRACT FOR FABRICATION, SUPPLY, DELIVERY AND INSTALLATION OF POWDER COATED ALUMINIUM FIXED PANELS (BATCH 9) | ANCON ANDA PTE. LTD. | S$1,736 |
| 18 Dec 2023 | Geophysical Survey Works at Project BX | GEONAMICS (S) PTE LTD | S$119,000 |
| 18 Dec 2023 | Proposed Addition and Alteration to Existing Sembawang Mart | SOONLY PTE. LTD. | S$2,083,800 |
| 15 Dec 2023 | Multi-Disciplinary (Civil & Structural Engineering and Quantity Surveying) Consultancy Services for Proposed Development | AECOM SINGAPORE PTE. LTD. | S$10,288,000 |
| 15 Dec 2023 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | BELMACS PTE LTD | S$9,158 |
| 15 Dec 2023 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | YKLUM PTE. LTD. | S$9,158 |
| 14 Dec 2023 | IMPROVEMENT WORKS TO SURFACE CAR PARKS (BATCH 85) | NEWCON BUILDERS PTE. LTD. | S$18,380,000 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | PROPERTY CONTEXT PTE. LTD. | S$1 |
| 11 Dec 2023 | Supply Of Ordinary Portland Cement To The HDB (Batch 51) | SINGAPORE CEMENT MANUFACTURING COMPANY (PRIVATE) LIMITED | S$86 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | PACER PROPERTY CONSULTANTS PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | PACIFIC ABACUS VALUERS PTE LTD | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | PIONEER PROPERTY CONSULTANTS LLP | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | PREMAS VALUERS & PROPERTY CONSULTANTS PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | PROPNEX REALTY PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | PROSPERCO INTERNATIONAL PROPERTY CONSULTANTS PTE LTD | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | READING PROPERTY CONSULTANTS PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | REALTY INTERNATIONAL ASSOCIATES PTE LTD | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | RHT VALUATION PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | ROBERT KHAN & CO PTE LTD | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | SAVILLS VALUATION AND PROFESSIONAL SERVICES (S) PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | SIERRA APPRAISERS LLP | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | SRE GLOBAL PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | STERLING PROPERTY CONSULTANTS PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | TAN & CHANG PROPERTY CONSULTANTS | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | TEHO PROPERTY CONSULTANTS PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | TKL APPRAISAL PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | UNITED VALUERS PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | 3C PROPERTY CONSULTANTS PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | A STAR VALUER PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | ACRES PROPERTY CONSULTANTS LLP | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | ALPHA APPRAISERS LLP | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | ASPAC PROPERTY CONSULTANTS PTE LTD | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | ASSOCIATED PROPERTY CONSULTANTS PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | ATLAS 21 REALTY PTE LTD | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | BEACON PROPERTY VALUERS LLP | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | C & L VALUERS PTE LTD | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | CENTURY 99 PTE LTD | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | CKS PROPERTY CONSULTANTS PTE LTD | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | CUSHMAN & WAKEFIELD VHS PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | ESMACO VALUERS & PROPERTY AGENTS PTE LTD | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | GB GLOBAL PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | H&U REAL ESTATE CONSULTANTS PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | INTEGRATED PROPERTY CONSULTANTS PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | JUST VALUES LLP | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | JY REALTY PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | KIONG CHAI WOON & COMPANY PRIVATE LIMITED | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | LANDSFIELD VALUATION CONSULTANTS PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | LING PROPERTY CONSULTANTS PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | NEWMAN SRE PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | OHB REAL ESTATE CONSULTANTS & SERVICES PTE LTD | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | OPC VALUERS PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | ORANGETEE ADVISORY PTE. LTD. | S$1 |
| 11 Dec 2023 | APPOINTMENT OF HDB PANEL VALUERS FROM 1 JAN 2024 TO 31 DEC 2026 | P M C SERVICES PTE LTD | S$1 |
| 8 Dec 2023 | ISA Certified Arborist Consultancy Services for Public Housing Skyrise Greenery Locations in HDB Towns - Batch 1 | MAO SHENG QUANJI CONSTRUCTION PTE LTD | S$90,000 |
| 8 Dec 2023 | Instrumentation and Monitoring Works for Proposed Public Housing Development at Kallang Whampoa Contract 23A | APS ASIA PDA ENTERPRISE PTE. LTD. | S$19,080 |
| 4 Dec 2023 | ACCREDITED CHECKER SERVICES FOR INFRASTRUCTURE WORKS AT TOA PAYOH WEST (CONTRACT 1) | ECAS CONSULTANTS PTE. LTD. | S$58,000 |
| 4 Dec 2023 | SPECIALIST ACCREDITED CHECKER SERVICES FOR INFRASTRUCTURE WORKS AT TOA PAYOH WEST (CONTRACT 1) | CKMBT INTERNATIONAL PTE. LTD. | S$46,800 |
| 1 Dec 2023 | DIVERSION WORKS OF PUB WATER SERVICES AT HOUGANG AVE 8 & 10 BLOCKS 438, 442, 443, 444, 457, 458 AND SERANGOON NORTH AVE 4, BLOCKS 506, 515 | SING & SAN CONSTRUCTION PTE LTD | S$580,286 |
| 30 Nov 2023 | PART A: BUILDING WORKS AT BEDOK NEIGHBOURHOOD 2 CONTRACT 13 (TOTAL: 1,640 DWELLING UNITS); PART B: ROAD IMPROVEMENT WORKS ALONG BEDOK SOUTH AVENUE 3 AND BEDOK SOUTH ROAD; PART C: CONTINGENCY WORKS | CHANG HUA CONSTRUCTION PTE LTD | S$359,700,000 |
| 30 Nov 2023 | PART A: BUILDING WORKS AT TENGAH PARK CONTRACT 1A AND COMMON GREEN (TOTAL: 1,004 DWELLING UNITS); PART B: CONTINGENCY WORKS | TEAMBUILD ENGINEERING & CONSTRUCTION PTE. LTD. | S$298,000,000 |
| 30 Nov 2023 | PART A: BUILDING WORKS AT KALLANG WHAMPOA CONTRACT 46 (TOTAL: 569 DWELLING UNITS); PART B: CONTINGENCY WORKS | PROGRESSIVE BUILDERS PRIVATE LIMITED | S$161,945,000 |
| 30 Nov 2023 | Design, Build, Maintain, Own and Operate Centralised Cooling System (Batch 1) | KEPPEL DHCS PTE. LTD. | S$901 |
| 30 Nov 2023 | PART A: BUILDING WORKS AT TENGAH BRICKLAND CONTRACT 2 (TOTAL: 1,641 DWELLING UNITS); PART B: CONTINGENCY WORKS | CES ENGINEERING & CONSTRUCTION PTE. LTD. | S$410,680,000 |
| 30 Nov 2023 | PART A: BUILDING WORKS AT PROJECT CF; PART B: CONTINGENCY WORKS | SANCHOON BUILDERS PTE LTD | S$195,188,000 |
| 29 Nov 2023 | PROVISION OF SITE SUPERVISION SERVICES FOR SPRUCING WORKS | WSH EXPERTS PTE. LTD. | S$12,230 |
| 28 Nov 2023 | IMPROVEMENT WORKS TO AIR HANDLING UNITS (AHU) AT HDB HUB | YINSHENG ENGINEERING PTE. LTD. | S$22,000 |
| 28 Nov 2023 | PROVISION OF SERVICES TO CARRY OUT PERIODIC FACADE INSPECTION (PFI) FOR HDB MULTI-STOREY CAR PARKS | OCTA CONSULTANTS PTE. LTD. | S$2,700 |
| 27 Nov 2023 | Mechanical and Electrical Cyclical Improvement Works to Multi-Storey Car Parks (Batch 22) | SPECIALIST ELECTRIC PTE LTD | S$5,955,800 |
| 22 Nov 2023 | Supply, Delivery, Installation, Configuration, Testing and Maintenance of IT Security System | NTT SINGAPORE PTE. LTD. | S$215,723 |
| 22 Nov 2023 | AIR-CONDITIONING IMPROVEMENT WORKS AT CONNECTION ONE | SENSOR ONE PTE LTD | S$987,000 |
| 22 Nov 2023 | INSTRUMENTATION AND MONITORING WORKS FOR EARTHWORKS AND INFRASTRUCTURE WORKS AT ANG MO KIO N8 | BETIME ENGINEERING PTE. LTD. | S$78,598 |
| 20 Nov 2023 | Periodic Structural Inspection and Related Works at Various HDB Estates (Batch 34-2023/24E1) | OCTA CONSULTANTS PTE. LTD. | S$1,368 |
| 17 Nov 2023 | (A) CONSTRUCTION OF ROAD IN SENGKANG N4; (B) CONSTRUCTION OF TRUNK SEWER IN SENGKANG N4; (C) SIGNALISED PEDESTRIAN CROSSING IN SENGKANG N4; (D) MINOR EARTHWORKS IN SENGKANG N4; (E) CONSTRUCTION OF 2 NOS BUS SHELTERS AND COVERED LINKWAYS AT SENTUL WALK; (F) CONSTRUCTION OF 2 NOS BUS SHELTERS AT HOUGANG STREET 13; (G) CONSTRUCTION OF 2 NOS BUS SHELTERS AT HOUGANG STREET 12 (PROVISIONAL SUM); (H) DRAIN DIVERSION AT SUMANG LANE; (I) EXTENSION OF CYCLING PATH AT SENGKANG WEST DRIVE | SING HENG HOE CONSTRUCTION (1988) PTE LTD | S$26,065,600 |
| 17 Nov 2023 | Supply of Fine Aggregates to the HDB (Batch 80) | ORIENT NATURAL RESOURCES PTE. LTD. | S$25 |
| 15 Nov 2023 | PROPOSED SLOPE IMPROVEMENT AND REPAIR WORKS AT EXISTING SLOPE BEHIND BLOCK 141, JALAN BUKIT MERAH | SIN HUA CIVIL ENGINEERING & CONSTRUCTION PTE. LTD. | S$840,000 |
| 15 Nov 2023 | (A) SITE CLEARANCE AND EARTHWORKS (PHASE II) AT ANG MO KIO N8; (B) CONSTRUCTION OF ANG MO KIO STREET 81 (PART I), ANG MO KIO STREET 82 & ANG MO KIO DRIVE (PART I); (C)CONSTRUCTION OF TRUNK SEWERS (PART I) AT ANG MO KIO N8 | MEGASTONE HOLDINGS PTE LTD | S$35,990,000 |
| 7 Nov 2023 | Specialist Consultancy Services for the Environmental Monitoring and Management Plan for the Infilling Works (Phase 4) | WORLEY PTE. LIMITED | S$5,999,880 |
| 3 Nov 2023 | Demolition Project at Public Housing Estate (Batch 22) | BENG HENG ENGINEERING PTE LTD | S$1,864,400 |
| 31 Oct 2023 | Multi-Disciplinary (Civil & Structural Engineering and Quantity Surveying) Consultancy Services for Various Demolition Projects (Batch 28) | ABL CONSULTANTS PTE. LTD. | S$253,000 |
| 30 Oct 2023 | PRODUCTION OF 360 DEGREES VIRTUAL TOURS FOR HDB COMMUNITY EVENTS FOR 24 MONTHS | SILVERSEA MEDIA (S) PTE. LTD. | S$45,499 |
| 30 Oct 2023 | SUPPLY, DELIVERY AND INSTALLATION OF ARTWORKS TO PARK AT WHAMPOA ROAD | HONG HAI ENVIRONMENTAL ART PTE LTD | S$82,500 |
| 30 Oct 2023 | REMAKING OUR HEARTLAND BATCH 3 - PARKS UPGRADING PROGRAMME IN TOA PAYOH & WOODLANDS TOWNS | Unknown | S$0 |
| 27 Oct 2023 | Laboratory Services for the Environmental Monitoring and Management Plan for the Infilling Works (Phase 4) | MARCHWOOD LABORATORY SERVICES PTE. LTD. | S$588,869 |
| 27 Oct 2023 | REMAKING OUR HEARTLAND BATCH 3 - PARKS UPGRADING PROGRAMME IN TOA PAYOH & WOODLANDS TOWNS | ADVANCED CONSTRUCTION & ENGINEERING PTE LTD | S$5,610,630 |
| 27 Oct 2023 | DESIGN AND BUILD OF ETFE ROOFING SYSTEM FOR KAMPUNG ADMIRALTY SKYLIGHT OPENING | MULTIMEDIA ENGINEERING PTE LTD | S$285,500 |
| 27 Oct 2023 | SUPPLY, INSTALLATION, COMMISSIONING AND MAINTENANCE OF THE HARDWARE AND SOFTWARE OF RADIO FREQUENCY IDENTIFICATION SYSTEM (RFID) | MEDIATECH MARKETING PTE LTD | S$245,234 |
| 24 Oct 2023 | SUPPLY AND DELIVERY OF RADIO FREQUENCY INDENTIFICATION (RFID) TAGS TO HDB ENGINEERING MATERIALS LABORATORY | MARUNDA PRIVATE LIMITED | S$0 |
| 23 Oct 2023 | DESIGN AND BUILD OF ROOFTOP LANDSCAPE GARDEN AND MINOR IMPROVEMENT WORKS AT MND COMPLEX | EARTHSCAPE CONCEPTS PTE. LTD. | S$1,518,990 |
| 20 Oct 2023 | Appointment of Panel of Financial Institutions for HDB's Bond issuances for a Period of Two (2) Years with option to extend for One (1) Year | BANK OF CHINA LIMITED | S$1 |
| 20 Oct 2023 | Appointment of Panel of Financial Institutions for HDB's Bond issuances for a Period of Two (2) Years with option to extend for One (1) Year | UNITED OVERSEAS BANK LIMITED | S$1 |
| 20 Oct 2023 | Appointment of Panel of Financial Institutions for HDB's Bond issuances for a Period of Two (2) Years with option to extend for One (1) Year | THE HONGKONG AND SHANGHAI BANKING CORPORATION LIMITED | S$1 |
| 20 Oct 2023 | Appointment of Panel of Financial Institutions for HDB's Bond issuances for a Period of Two (2) Years with option to extend for One (1) Year | STANDARD CHARTERED BANK (SINGAPORE) LIMITED | S$1 |
| 20 Oct 2023 | Appointment of Panel of Financial Institutions for HDB's Bond issuances for a Period of Two (2) Years with option to extend for One (1) Year | OVERSEA-CHINESE BANKING CORPORATION LIMITED | S$1 |
| 20 Oct 2023 | Appointment of Panel of Financial Institutions for HDB's Bond issuances for a Period of Two (2) Years with option to extend for One (1) Year | MAYBANK SECURITIES PTE. LTD. | S$1 |
| 20 Oct 2023 | Appointment of Panel of Financial Institutions for HDB's Bond issuances for a Period of Two (2) Years with option to extend for One (1) Year | INDUSTRIAL AND COMMERCIAL BANK OF CHINA LIMITED | S$1 |
| 20 Oct 2023 | Appointment of Panel of Financial Institutions for HDB's Bond issuances for a Period of Two (2) Years with option to extend for One (1) Year | DBS BANK LTD. | S$1 |
| 20 Oct 2023 | Appointment of Panel of Financial Institutions for HDB's Bond issuances for a Period of Two (2) Years with option to extend for One (1) Year | CIMB BANK BERHAD | S$1 |
| 20 Oct 2023 | Appointment of Panel of Financial Institutions for HDB's Bond issuances for a Period of Two (2) Years with option to extend for One (1) Year | CHINA CONSTRUCTION BANK CORPORATION Singapore Branch | S$1 |
| 20 Oct 2023 | Appointment of Panel of Financial Institutions for HDB's Bond issuances for a Period of Two (2) Years with option to extend for One (1) Year | AUSTRALIA AND NEW ZEALAND BANKING GROUP LIMITED | S$1 |
| 20 Oct 2023 | Appointment of Panel of Financial Institutions for HDB's Bond issuances for a Period of Two (2) Years with option to extend for One (1) Year | DEUTSCHE BANK AKTIENGESELLSCHAFT | S$1 |
| 17 Oct 2023 | CONSULTANCY SERVICES FOR RISK AND RESILIENCE ASSESSMENT FOR 66KV ELECTRICAL SUBSTATION AT PROJECT CG | BETH-EL (ASIA PACIFIC) PTE. LTD. | S$198,000 |
| 16 Oct 2023 | Addition and Alteration Works To Elias Mall | STEEL GIANT ENGINEERING PTE. LTD. | S$1,018,889 |
| 16 Oct 2023 | ELECTRICAL LOAD UPGRADING PROGRAMME (ELUP) BATCH 2 PROJECT 1 (WEST ZONE) | ISO-TEAM CORPORATION PTE LTD | S$28,800,000 |
| 12 Oct 2023 | Provision of Resident Technical Officer (RTO) Services for Supervision Works | Unknown | S$0 |
| 11 Oct 2023 | (A) Construction of Sumang Crescent; (B) Construction of Trunk Sewer 20B along Sumang Crescent; (C) Construction of Signalised Pedestrian Crossing at Sumang Crescent | WFY CIVIL ENGINEERING PTE. LTD. | S$7,836,000 |
| 11 Oct 2023 | TERM CONTRACT FOR FABRICATION, SUPPLY, DELIVERY AND INSTALLATION OF POWDER COATED ALUMINIUM FIXED PANELS (BATCH 8) | ANCON ANDA PTE. LTD. | S$2,153 |
| 10 Oct 2023 | Supply Of Ordinary Portland Cement To The HDB (Batch 50) | SINGAPORE CEMENT MANUFACTURING COMPANY (PRIVATE) LIMITED | S$91 |
| 6 Oct 2023 | Addition and Alteration Works to Multi-Storey Car Park at Block 808, French Road | WD BUILDER PTE. LTD. | S$779,960 |
| 6 Oct 2023 | TERM CONTRACT FOR THE PRODUCTION, SUPPLY AND DELIVERY OF PRECAST LARGE PANEL SLAB (LPS) TO VARIOUS HDB BUILDING SITES (BATCH 10) | GREYFORM PTE. LTD. | S$5,607 |
| 6 Oct 2023 | TERM CONTRACT FOR THE PRODUCTION, SUPPLY AND DELIVERY OF PRECAST LARGE PANEL SLAB (LPS) TO VARIOUS HDB BUILDING SITES (BATCH 8) | SUNWAY CONCRETE PRODUCTS (S) PTE LTD | S$5,649 |
| 6 Oct 2023 | TERM CONTRACT FOR THE PRODUCTION, SUPPLY AND DELIVERY OF PRECAST LARGE PANEL SLAB (LPS) TO VARIOUS HDB BUILDING SITES (BATCH 9) | PRECAST CONCRETE PTE. LTD. | S$4,148 |
| 6 Oct 2023 | Accredited Checking Services for Earth Retaining & Stabilising Structure Works and Slope Stabilising Works at (A) Demolition Project A; (B) Demolition Project B; (C) Demolition Project C; (D) Demolition Project D | CPG CONSULTANTS PTE LTD | S$80,000 |
| 6 Oct 2023 | TERM CONTRACT FOR THE PRODUCTION, SUPPLY AND DELIVERY OF PRECAST LARGE PANEL SLAB (LPS) TO VARIOUS HDB BUILDING SITES (BATCH 7) | ROBIN VILLAGE DEVELOPMENT PTE. LTD. | S$6,189 |
| 5 Oct 2023 | SPECIALIST PROFESSIONAL ENGINEERING (GEOTECHNICAL) CONSULTANCY SERVICES FOR PROJECT AU AND BD | TERS CONSULTING PTE. LTD. | S$268,240 |
| 4 Oct 2023 | Procurement of Consultancy Services for HDB's Sustainability Report for FY2023 and FY2024 | PRICEWATERHOUSECOOPERS RISK SERVICES PTE. LTD. | S$239,000 |
| 29 Sept 2023 | Supply of 20MM Aggregate to the HDB (Batch 87) | HL BUILDING MATERIALS PTE. LTD. | S$21 |
| 28 Sept 2023 | SPECIALIST PROFESSIONAL ENGINEERING (GEOTECHNICAL) CONSULTANCY SERVICES FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT AS | JIB SPECIALIST CONSULTANTS PTE. LTD. | S$189,000 |
| 27 Sept 2023 | ACCREDITED CHECKING SERVICES FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT BD | CPG CONSULTANTS PTE LTD | S$150,000 |
| 27 Sept 2023 | DISMANTLING AND DISPOSAL OF VERTICAL STEEL MOULDS SYSTEMS AND REINSTATEMENT WORKS AT HDB CENTRE OF BUILDING RESEARCH (CBR) | BENLY CONSTRUCTION COMPANY PTE. LTD. | S$39,500 |
| 26 Sept 2023 | Infrastructure Works for HDB Development (Eastern) | WFY CIVIL ENGINEERING PTE. LTD. | S$5,480,000 |
| 25 Sept 2023 | MULTI-DISCIPLINARY (CIVIL & STRUCTURAL ENGINEERING AND QUANTITY SURVEYING) CONSULTANCY SERVICES FOR VARIOUS DEMOLITION PROJECTS (BATCH 24) | ANG & ONG CONSULTANTS PTE. LTD. | S$181,000 |
| 22 Sept 2023 | Tender for Specialist Accredited Checking Services For Various Demolition Works At: A) Project A; B) Project B; C) Project C | GEOALLIANCE CONSULTANTS PTE. LTD. | S$105,000 |
| 21 Sept 2023 | PROVISION AND MAINTENANCE OF CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM FOR HDB BRANCHES | G-CUBE ENGINEERING PTE. LTD. | S$105,658 |
| 18 Sept 2023 | PROVISION OF INTEGRATED FACILITIES MANAGEMENT (IFM) SERVICES TO COMMERCIAL PROPERTIES (SECTOR 1) | JONES LANG LASALLE PROPERTY CONSULTANTS PTE LTD | S$1,410,970 |
| 18 Sept 2023 | PROVISION OF FACILITIES MANAGEMENT SERVICES TO HDB HUB FROM YEAR 2023 TO YEAR 2026 | CPG FACILITIES MANAGEMENT PTE LTD | S$182,455 |
| 15 Sept 2023 | PROVISION OF LANDSCAPING SERVICES ON TOPMOST PARKING DECKS OF EXISTING MULTI- STOREY CAR PARKS (MSCP) (BATCH 11) | GARDEN WORKS PTE. LTD. | S$315,182 |
| 15 Sept 2023 | Term Contract for the Provision of Testing Services for Semi-Destructive and Non-Destructive Tests on HDB Buildings (Batch 13) | R.A.K. MATERIALS CONSULTANTS PTE LTD | S$126 |
| 14 Sept 2023 | Provision of One-On-One Leadership Coaching | ALIGN SMA PTE. LTD. | S$1,560 |
| 8 Sept 2023 | PROVISION OF MANAGING AGENT SERVICES AND MAINTENANCE WORKS [YEAR 2023 TO YEAR 2025] (EAST ZONE) | KNIGHT FRANK PROPERTY & FACILITIES MANAGEMENT PTE. LTD. | S$120,800 |
| 8 Sept 2023 | PROVISION OF MANAGING AGENT SERVICES AND MAINTENANCE WORKS [YEAR 2023 TO YEAR 2025] (NORTH-EAST ZONE) | CPG FACILITIES MANAGEMENT PTE LTD | S$140,050 |
| 8 Sept 2023 | PROVISION OF MANAGING AGENT SERVICES AND MAINTENANCE WORKS [YEAR 2023 TO YEAR 2025] (CENTRAL ZONE) | CBM PTE. LTD. | S$106,500 |
| 8 Sept 2023 | PART A: BUILDING WORKS AT ANG MO KIO NEIGHBOURHOOD 8 CONTRACT 38A (TOTAL: 1,068 DWELLING UNITS); PART B: CONTINGENCY WORKS | HI-TEK CONSTRUCTION PTE. LTD. | S$241,500,000 |
| 8 Sept 2023 | PROVISION OF MANAGING AGENT SERVICES AND MAINTENANCE WORKS [YEAR 2023 TO YEAR 2025] (NORTH ZONE) | CHIONG CONSTRUCTION PTE. LTD. | S$119,300 |
| 8 Sept 2023 | PROVISION OF MANAGING AGENT SERVICES AND MAINTENANCE WORKS [YEAR 2023 TO YEAR 2025] (WEST ZONE) | CTM FACILITIES MANAGEMENT PTE. LTD. | S$133,971 |
| 7 Sept 2023 | Mechanical and Electrical Cyclical Improvement Works to Multi-Storey Car Parks (Batch 21) | SH INTEGRATED SERVICES PTE. LTD. | S$5,018,793 |
| 7 Sept 2023 | THIRTY-FOURTH TERM CONTRACT FOR THE SUPPLY, DELIVERY, INSTALLATION AND MAINTENANCE OF LIFTS FOR THREE-YEAR PERIOD | E M SERVICES PRIVATE LIMITED | S$8,193,243 |
| 6 Sept 2023 | Multi-Disciplinary (Civil & Structural Engineering and Quantity Surveying) Consultancy Services for Various Demolition Projects (Batch 25) | ANG & ONG CONSULTANTS PTE. LTD. | S$113,000 |
| 5 Sept 2023 | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT BUKIT BATOK NEIGHBOURHOOD 4 CONTRACT 28 | BETIME ENGINEERING PTE. LTD. | S$116,670 |
| 31 Aug 2023 | PART A: BUILDING WORKS AT BUKIT BATOK NEIGHBOURHOOD 4 CONTRACT 28 (TOTAL: 790 DWELLING UNITS); PART B: CONTINGENCY WORKS | SIM LIAN CONSTRUCTION CO. (PTE.) LTD. | S$216,400,000 |
| 31 Aug 2023 | Main Building Works for Funeral Parlour Complex | WEE HUR CONSTRUCTION PTE LTD | S$79,500,000 |
| 31 Aug 2023 | PART A : BUILDING WORKS AT JURONG WEST NEIGHBOURHOOD 9 CONTRACT 21 (TOTAL: 271 DWELLING UNITS); PART B : CONTINGENCY WORKS | H P CONSTRUCTION & ENGINEERING PTE LTD | S$80,655,000 |
| 31 Aug 2023 | PART A: BUILDING WORKS AT KALLANG WHAMPOA CONTRACT 54 (TOTAL: 510 DWELLING UNITS); PART B: CONTINGENCY WORKS | HI-TEK CONSTRUCTION PTE. LTD. | S$140,500,000 |
| 29 Aug 2023 | IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 58) | SH INTEGRATED SERVICES PTE. LTD. | S$6,933,333 |
| 29 Aug 2023 | Collection of Cash Payments to HDB via Cash Payment Kiosks | RFNET TECHNOLOGIES PTE LTD | S$12,985 |
| 28 Aug 2023 | MECHANICAL AND ELECTRICAL CYCLICAL IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 26) | DIGO CORPORATION PTE. LTD. | S$4,735,578 |
| 25 Aug 2023 | Demolition Works For Project A (Batch 23) | BENG HENG ENGINEERING PTE LTD | S$777,000 |
| 23 Aug 2023 | Term Contract for the Provision of Testing Services for Semi-Destructive and Non-Destructive Tests on HDB Buildings (Batch 12) | SETSCO SERVICES PTE LTD | S$126 |
| 22 Aug 2023 | Construction of Bus Bays, Signalized Traffic Junction cum U-Turn, Cycling Path and Linkways at Jalan Boon Lay / Boon Lay Way | NU SYSTEMS PTE. LTD. | S$2,080,300 |
| 21 Aug 2023 | PRODUCTION OF ARCHITECTURAL MODEL AND MAINTENANCE/DISPOSAL OF OTHER MODELS | ANNESING PTE. LTD. | S$288,000 |
| 21 Aug 2023 | TERM CONTRACT FOR DESIGN, PREPARATION AND PACKAGING OF CONTENT FOR USE IN WEBSITES | CHUNG PRINTING PTE. LTD. | S$7,188 |
| 16 Aug 2023 | DEMOLITION WORKS FOR PROJECT C2 (BATCH 21) | SHENGJIE ENGINEERING PTE. LTD. | S$1,100,000 |
| 14 Aug 2023 | Provision of Management Services (Batch 5) | Blue Cross Charitable Institution | S$635 |
| 14 Aug 2023 | IMPROVEMENT WORKS AT HDB HUB OFFICES | SENG JOO HUAT PTE. LTD. | S$27,822 |
| 14 Aug 2023 | Provision of Management Services (Batch 4) | New Hope Community Services | S$404 |
| 14 Aug 2023 | Provision of Management Services (Batch 6) | New Hope Community Services | S$409 |
| 11 Aug 2023 | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT QUEENSWAY CONTRACT 2 | ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | S$84,280 |
| 11 Aug 2023 | Infrastructure Works at Toa Payoh West (Contract 1) | CHUAN LIM CONSTRUCTION PTE LTD | S$41,939,900 |
| 11 Aug 2023 | Term Contract for Conservancy Services and Related Works at HDB Properties (2023 to 2026) | CLEANMAGE PTE. LTD. | S$462,864 |
| 11 Aug 2023 | SPECIALIST CONSULTANCY SERVICES AT HDB DEVELOPMENT (EASTERN 2) | WSP CONSULTANCY PTE. LTD. | S$2,348,800 |
| 7 Aug 2023 | TERM CONTRACT FOR PROVISION OF TESTING SERVICES FOR WINDSOR PROBE TEST, CORE TEST AND CONSTRUCTION MATERIALS TESTING (BATCH 8) | CAST LABORATORIES PTE LTD | S$339 |
| 2 Aug 2023 | PROVISION OF NEW DIGITAL ASSET MANAGEMENT SYSTEM | DIW PTE. LTD. | S$252,200 |
| 1 Aug 2023 | ELECTRICAL LOAD UPGRADING PROGRAMME (ELUP) BATCH 2 - PROJECT 4 | SHIN KHAI CONSTRUCTION PTE. LTD. | S$29,024,046 |
| 28 Jul 2023 | Supply and Delivery of Fine Aggregates to the HDB including Stockpiling and Ground Monitoring Works (Batch 79) | ORIENT NATURAL RESOURCES PTE. LTD. | S$26 |
| 28 Jul 2023 | Supply Of Ordinary Portland Cement To The HDB (Batch 49) | ENGRO CORPORATION LIMITED | S$96 |
| 27 Jul 2023 | PROVISION OF RETAIL CONSULTANCY SERVICES FOR HDB COMMERCIAL CLUSTERS | CBRE PTE. LTD. | S$448,240 |
| 27 Jul 2023 | PROPOSED SEWER DIVERSION WORKS FOR PUBLIC HOUSING AT PROJECT U | GOOD LINK ENGINEERING & CONSTRUCTION PTE. LTD. | S$249,000 |
| 25 Jul 2023 | Design and Installation of Vertical Green Wall System at HDB Hub | CONSIS ENGINEERING PTE. LTD. | S$171,450 |
| 25 Jul 2023 | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT BH-BI-BJ | ENVAC SINGAPORE PTE. LTD. | S$5,940,000 |
| 25 Jul 2023 | Design, Build & Operate Pneumatic Waste Conveyance System (PWCS) at BK-BL-BM-BM1 | PV VACUUM ENGINEERING PTE LTD | S$6,922,246 |
| 24 Jul 2023 | INSTRUMENTATION AND MONITORING WORKS (AUTOMATED TUNNEL MONITORING SYSTEM) FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT KALLANG WHAMPOA CONTRACT 45A AND 45B | APS ASIA PDA ENTERPRISE PTE. LTD. | S$556,696 |
| 21 Jul 2023 | PROVISION OF GENERAL CLEANING SERVICES, GENERAL WASTE DISPOSAL SERVICES AND BUILDING MAINTENANCE SERVICES AT HDB CENTRE OF BUILDING RESEARCH (CBR) | CORA ENVIRONMENT PTE. LTD. | S$561,408 |
| 20 Jul 2023 | Supply of BIM Specialist and BIM IT Specialist Services (Batch 3) | ACEPLP.COM PTE LTD | S$22,800 |
| 20 Jul 2023 | Improvement Works To Void Deck Columns Of Residential Buildings Using Polymer Fibre Wrapping (Batch 14) | FIBRWRAP CONSTRUCTION PTE. LTD. | S$64 |
| 19 Jul 2023 | SPECIALIST ACCREDITED CHECKER (GEOTECHNICAL) FOR PROPOSED COASTAL WORKS AT CHANGI | TERS CONSULTING PTE. LTD. | S$148,400 |
| 19 Jul 2023 | ACCREDITED CHECKING ORGANISATION FOR PROPOSED COASTAL WORKS AT CHANGI | CPG CONSULTANTS PTE LTD | S$150,000 |
| 14 Jul 2023 | Design, Build & Operate Pneumatic Waste Conveyance System (PWCS) at BN-BO-BP | STREAM ENVIRONMENT (S) PTE. LTD. | S$6,180,000 |
| 14 Jul 2023 | Design, Build & Operate Pneumatic Waste Conveyance System (PWCS) at BE-BG | ENVAC SINGAPORE PTE. LTD. | S$5,729,000 |
| 11 Jul 2023 | Supply of 20MM Aggregate to the HDB (Batch 86) | SAMWOH RESOURCES PTE LTD | S$21 |
| 10 Jul 2023 | PART A: BUILDING WORKS AT QUEENSWAY CONTRACT 2 (TOTAL: 996 DWELLING UNITS); PART B: CONTINGENCY WORKS | KAY LIM CONSTRUCTION & TRADING PTE LTD | S$287,100,000 |
| 4 Jul 2023 | REMAKING OUR HEARTLAND BATCH 3 - PARKS UPGRADING PROGRAMME AND IMPROVEMENT TO PEDESTRIAN NETWORK IN PASIR RIS TOWN | SWP CONSTRUCTION PTE. LTD. | S$10,758,800 |
| 3 Jul 2023 | DEMOLITION WORKS AT HDB QUICK BUILD DORMS | PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | S$1,720,000 |
| 30 Jun 2023 | Term Contract for Building, Sanitary and Plumbing Works at HDB Properties for a Period of Three (3) Years | PHYLLIS ENGINEERING PTE. LTD. | S$3,555 |
| 30 Jun 2023 | Term Contract for Building, Sanitary and Plumbing Works at HDB Properties for a Period of Three (3) Years | FULL HOUSE BUILDING CONSTRUCTION PTE. LTD. | S$6,079 |
| 30 Jun 2023 | Term Contract for Building, Sanitary and Plumbing Works at HDB Properties for a Period of Three (3) Years | LEAP INTEGRATED PTE. LTD. | S$5,195 |
| 30 Jun 2023 | Term Contract for Building, Sanitary and Plumbing Works at HDB Properties for a Period of Three (3) Years | LHW CONSTRUCTION PTE. LTD. | S$6,058 |
| 28 Jun 2023 | Development of Multi-Disciplinary Parametric Building Information Modelling (BIM) Object Libraries and Guides | Unknown | S$0 |
| 27 Jun 2023 | TENDER FOR ABC WATERS PROFESSIONAL CONSULTANCY SERVICES FOR PROJECT AU | RAMBOLL PTE. LTD. | S$48,000 |
| 27 Jun 2023 | SPECIALIST ACCREDITED CHECKING SERVICES FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT ULU PANDAN AREA | MEINHARDT (SINGAPORE) PTE LTD | S$119,000 |
| 27 Jun 2023 | PROVISION OF MANAGEMENT SERVICES (CONTRACT 16) (YEAR 2023 TO YEAR 2025) | CTM FACILITIES MANAGEMENT PTE. LTD. | S$4,592 |
| 26 Jun 2023 | SITE PREPARATION WORKS AT CHOA CHU KANG TOWN N1 | PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | S$6,418,000 |
| 23 Jun 2023 | Development of Multi-Disciplinary Parametric Building Information Modeling (BIM) Object Library and Guide | SYNTERIS DIGITAL SERVICES PTE. LTD. | S$137,610 |
| 23 Jun 2023 | CONSTRUCTION OF MOCK-UP UNIT AT 3RD STOREY OF HDB CENTRE OF BUILDING RESEARCH (CBR) | TAT LIAN CORPORATION PTE. LTD. | S$128,000 |
| 22 Jun 2023 | Term Contract for the Provision of Testing Services for Semi-Destructive and Non-Destructive Tests on HDB Buildings (Batch 11) | R.A.K. MATERIALS CONSULTANTS PTE LTD | S$113 |
| 21 Jun 2023 | TERM CONTRACT FOR BUILDING AND SANITARY WORKS AT HDB COMPLEXES FOR A PERIOD OF 3 YEARS (ZONE 2 - WEST & CENTRAL) | SH INTEGRATED SERVICES PTE. LTD. | S$59,350 |
| 20 Jun 2023 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 3) | PH CONSULTING PTE. LTD. | S$150 |
| 20 Jun 2023 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 3) | KTP CONSULTANTS PTE LTD | S$150 |
| 20 Jun 2023 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 3) | ECAS CONSULTANTS PTE. LTD. | S$150 |
| 20 Jun 2023 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 3) | ENGINEERS 2002 PRIVATE LIMITED | S$150 |
| 20 Jun 2023 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 3) | BUREAU VERITAS BUILDINGS & INFRASTRUCTURE PTE. LTD. | S$150 |
| 20 Jun 2023 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 3) | CKMBT INTERNATIONAL PTE. LTD. | S$150 |
| 20 Jun 2023 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 3) | CPG CONSULTANTS PTE LTD | S$150 |
| 20 Jun 2023 | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 3) | JIB SPECIALIST CONSULTANTS PTE. LTD. | S$150 |
| 17 Jun 2023 | Mechanical and Electrical Cyclical Improvement Works to Multi-Storey Car Parks (Batch 25) | SPECIALIST ELECTRIC PTE LTD | S$3,575,000 |
| 9 Jun 2023 | THE SUPPLY OF PROJECT MANAGEMENT TO INSTALL DUAL BICYCLE RACKS IN HDB TOWNS (PHASE 3) | LANDMARK ASIA PACIFIC PTE. LTD. | S$35 |
| 8 Jun 2023 | Site Clearance and Earthworks at Telok Blangah (Contract 1) | CHUAN LIM CONSTRUCTION PTE LTD | S$32,500,000 |
| 6 Jun 2023 | Term Contract for the Provision of Testing Services for Semi-Destructive and Non-Destructive Tests on HDB Buildings (Batch 10) | SETSCO SERVICES PTE LTD | S$113 |
| 5 Jun 2023 | PREPARATION AND DELIVERY OF ARCHITECTURAL PERSPECTIVES AND 3D ANIMATIONS / WALK-THROUGHS / VIDEOS FOR HDB TOWN D | SPOT WORKS PTE. LTD. | S$73,500 |
| 5 Jun 2023 | PREPARATION AND DELIVERY OF ARCHITECTURAL PERSPECTIVES FOR HDB TOWN C | SIXTREES VIZ COMMS PTE. LTD. | S$63,750 |
| 31 May 2023 | PART A: BUILDING WORKS AT GHIM MOH CONTRACT 9 AND NEIGHBOURHOOD PARK (TOTAL: 991 DWELLING UNITS); PART B: CONTINGENCY WORKS | LBD ENGINEERING PTE. LTD. | S$236,980,000 |
| 31 May 2023 | Part A: Building Works at Ang Mo Kio Neighbourhood 7 Contract 30 (Total: 926 Dwelling Units); Part B: Contingency Works | VICO CONSTRUCTION PTE. LTD. | S$257,770,000 |
| 31 May 2023 | PART A: BUILDING WORKS AT JURONG EAST NEIGHBOURHOOD 2 CONTRACT 24 (TOTAL: 562 DWELLING UNITS); PART B: CONTINGENCY WORKS | LC&T BUILDER (1971) PTE. LTD. | S$126,800,000 |
| 31 May 2023 | PART A: BUILDING WORKS AT KALLANG INTEGRATED DEVELOPMENT COMPRISING 477 UNITS OF PUBLIC HOUSING WITH BUS INTERCHAGE AT KALLANG WHAMPOA CONTRACT 23A; PART B: CONTINGENCY WORKS | LBD ENGINEERING PTE. LTD. | S$186,000,000 |
| 31 May 2023 | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT ANG MO KIO NEIGHBOURHOOD 7 CONTRACT 30 | GLOBAL SINOTRUST PTE. LTD. | S$48,808 |
| 29 May 2023 | PREPARATION AND DELIVERY OF ARCHITECTURAL PERSPECTIVES AND 3D ANIMATIONS / WALK-THROUGHS / VIDEOS FOR HDB TOWN E | VISUALMEDIAWORKS PTE LTD | S$82,300 |
| 26 May 2023 | PROVISION OF TELEPHONY SERVICES AT HDB HUB FROM 1 SEP 2023 TO 31 AUG 2026 | SINGAPORE TELECOMMUNICATIONS LIMITED | S$1,225 |
| 26 May 2023 | RENEWAL OF CODE SCANNING SOLUTION FOR TWO (2) YEARS | CIS AUTOMATION PTE. LTD. | S$76,106 |
| 22 May 2023 | PREPARATION AND DELIVERY OF ARCHITECTURAL PERSPECTIVES FOR HDB TOWN B | DIGITAL MIRAGE PTE. LTD. | S$63,400 |
| 22 May 2023 | PREPARATION AND DELIVERY OF ARCHITECTURAL PERSPECTIVES FOR HDB TOWN A | ENARI PTE. LTD. | S$24,750 |
| 17 May 2023 | DEMOLITION PROJECT AT PUBLIC HOUSING ESTATE (BATCH 19) | BENG HENG ENGINEERING PTE LTD | S$1,860,000 |
| 15 May 2023 | Appointment of Site Supervisors For Concrete Testing Works On HDB Buildings (Batch 3) | GAIN EMPLOYMENT SERVICES PTE. LTD. | S$5,784 |
| 11 May 2023 | Improvement Works to Water Tanks at MND Complex | CHERN SENG ENGINEERING PTE LTD | S$85,000 |
| 9 May 2023 | Term Contract for Electrical Works at HDB Properties for a Period of Three Years | KONTOURZ PTE. LTD. | S$12,948 |
| 9 May 2023 | Term Contract for Electrical Works at HDB Properties for a Period of Three Years | SH INTEGRATED SERVICES PTE. LTD. | S$9,390 |
| 9 May 2023 | Term Contract for Electrical Works at HDB Properties for a Period of Three Years | AHEAD ENGINEERING SERVICES PTE. LTD. | S$11,914 |
| 9 May 2023 | Term Contract for Electrical Works at HDB Properties for a Period of Three Years | PRK ENGINEERING PTE. LTD. | S$17,777 |
| 28 Apr 2023 | UPGRADE OF ENTERPRISE DISK STORAGE | NCS COMMUNICATIONS ENGINEERING PTE. LTD. | S$1,733,832 |
| 27 Apr 2023 | DIVERSION OF WATER MAIN FOR JURONG WEST ST 41 BLOCK 463 & 494, JURONG WEST AVE 1 BLOCK 423 AND JURONG WEST ST 52 BLOCK 527 | KEIFER CONSTRUCTION PRIVATE LIMITED | S$398,750 |
| 21 Apr 2023 | Maintenance Renewal of Networker Backup Software (FY2022/T012) | NCS PTE. LTD. | S$1,570 |
| 18 Apr 2023 | Demolition Works for State Property - Batch 20 Project E | PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | S$692,000 |
| 17 Apr 2023 | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT PROJECT AY | ENVAC SINGAPORE PTE. LTD. | S$3,158,000 |
| 14 Apr 2023 | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT CHOA CHU KANG N1 C19-20 & C17-18 | ENVAC SINGAPORE PTE. LTD. | S$5,788,000 |
| 10 Apr 2023 | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT BUKIT MERAH CONTRACT 51 | BETIME ENGINEERING PTE. LTD. | S$117,798 |
| 10 Apr 2023 | TERM CONTRACT FOR CLEANING SERVICES AT HDB HUB FOR A PERIOD OF 3 YEARS (YEAR 2023 TO YEAR 2025) | CSP MAINTENANCE PTE LTD | S$362,250 |
| 10 Apr 2023 | Provision, Installation & Maintenance of Vertical Green Wall System | Unknown | S$0 |
| 10 Apr 2023 | PROVISION OF COLLECTION OF PAYMENTS TO HDB VIA SELF-SERVICE CHANNELS (KIOSK, MOBILE AND ELECTRONIC APPLICATION) FOR A PERIOD OF FIVE YEARS | AXS PTE. LTD. | S$1 |
| 5 Apr 2023 | Major Infrastructure Works at Bedok Town: (A) Drain Widening Cum Cycling Path at Bedok North Street 3; (B) Sewerage Works at Bedok North Road / Bedok North Ave 1 / Bedok North Street 3; (C) Contiguous Bored Pile (CBP) Wall and Drain Reconstruction at Bedok North Road; (D) Road Widening Works at Chai Chee Lane | JUPITER BUILDER PTE. LTD. | S$31,600,000 |
| 5 Apr 2023 | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT Project AC-AM | PV VACUUM ENGINEERING PTE LTD | S$5,468,387 |
| 3 Apr 2023 | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT SENGKANG N4 C45-48 | PV VACUUM ENGINEERING PTE LTD | S$8,163,183 |
| 31 Mar 2023 | PART A: BUILDING WORKS AT PROJECT BQ; PART B: CONTINGENCY WORKS | KWAN YONG CONSTRUCTION PTE LTD | S$210,500,000 |
| 31 Mar 2023 | Earthworks at Toa Payoh Rise | LAW BROTHERS CONSTRUCTION PTE. LTD. | S$1,158,000 |
| 23 Mar 2023 | Specialist Consultancy Services at HDB Development (Choa Chu Kang) | AECOM SINGAPORE PTE. LTD. | S$1,092,160 |
| 23 Mar 2023 | GROUP PERSONAL ACCIDENT AND WORK INJURY COMPENSATION INSURANCE POLICY FOR HDB EMPLOYEES FOR A PERIOD OF THREE YEARS | SPECIALIST RISK GROUP SINGAPORE PTE. LTD. | S$6 |
| 22 Mar 2023 | DEMOLITION WORKS FOR PROJECT A (BATCH 21) | YI HONG CONSTRUCTION PTE. LTD. | S$538,000 |
| 21 Mar 2023 | TERM CONTRACT FOR THE FABRICATION, SUPPLY, DELIVERY AND INSTALLATION OF POWDER COATED ALUMINIUM FIXED PANELS INCLUDING FIXINGS, FASTENINGS, ANCHORS, BRACKETS AND ALL THE RELATED ACCESSORIES TO MITIGATE RAIN WATER SPLASHING AT THE HDB ESTATES (BATCH 7) | DESHENG ENGINEERING PTE. LTD. | S$1,670 |
| 17 Mar 2023 | (A) Site Clearance and Earthworks at Kallang Whampoa C60-C62; (B) Civil Engineering Term Contract | SHUAN HUAT TRACTOR SERVICES PTE. LTD. | S$6,069,293 |
| 16 Mar 2023 | DEMOLITION WORKS FOR STATE PROPERTY - BATCH 20 PROJECT C | YI HONG CONSTRUCTION PTE. LTD. | S$810,000 |
| 16 Mar 2023 | SUPPLY OF PROGRAMMING AND IT RELATED SERVICES FOR A PERIOD OF 3 YEARS (CONTRACT 39- 2023) | SINGSOFT SOLUTIONS PTE. LIMITED | S$4,352 |
| 16 Mar 2023 | SUPPLY OF PROGRAMMING AND IT RELATED SERVICES FOR A PERIOD OF 3 YEARS (CONTRACT 40 - 2023) | STIE PTE. LTD. | S$3,810 |
| 16 Mar 2023 | IMPROVEMENT WORKS AT MND COMPLEX | Unknown | S$0 |
| 15 Mar 2023 | SUPPLY OF PROGRAMMING AND IT RELATED SERVICES FOR A PERIOD OF 3 YEARS (CONTRACT 38 - 2023) | WSH EXPERTS PTE. LTD. | S$3,150 |
| 13 Mar 2023 | Term Contract For Maintenance Of Air-Conditioning And Mechanical Ventilation System In Various HDB Branches From 1 Apr 2023 To 31 Mar 2026 (Sector 2) | HEATOLOGY LLP | S$32 |
| 10 Mar 2023 | Term Contract For Maintenance Of Air-Conditioning And Mechanical Ventilation System In Various HDB Branches From 1 Apr 2023 To 31 Mar 2026 (Sector 1) | PACIFIC COOL AIR-CON SERVICES PTE. LTD. | S$96 |
| 9 Mar 2023 | Demolition Works for State Property - Batch 20 Project D | I-LOGIC CONCEPTS PTE. LTD. | S$971,100 |
| 7 Mar 2023 | TERM CONTRACT FOR THE PROVISION OF MANAGED PRIMARY HEALTHCARE SERVICES AND INFLUENZA VACCINATIONS FOR HDB STAFF FOR A PERIOD OF THREE YEARS | PARKWAY SHENTON PTE LTD | S$61 |
| 3 Mar 2023 | Application Software Maintenance and Support for HDB Integrated Human Resource Management System (HRMS) | NCS PTE. LTD. | S$3,715,380 |
| 3 Mar 2023 | Supply of 20MM Aggregate to the HDB (Batch 85) | SAMWOH RESOURCES PTE LTD | S$20 |
| 3 Mar 2023 | INSTRUMENTATION AND MONITORING WORKS FOR SITE PREPARATION WORKS AT CHOA CHU KANG N1 | APS ASIA PDA ENTERPRISE PTE. LTD. | S$29,732 |
| 2 Mar 2023 | PART A : BUILDING WORKS AT CHOA CHU KANG NEIGHBOURHOOD 8 CONTRACT 12 (TOTAL : 987 DWELLING UNITS); PART B : CONTINGENCY WORKS | QINGJIAN INTERNATIONAL (SOUTH PACIFIC) GROUP DEVELOPMENT CO., PTE. LTD. | S$268,600,000 |
| 2 Mar 2023 | PART A: BUILDING WORKS AT BUKIT MERAH CONTRACT 51 (TOTAL: 869 DWELLING UNITS); PART B: CONTINGENCY WORKS | LBD ENGINEERING PTE. LTD. | S$241,880,000 |
| 2 Mar 2023 | Minor Design & Improvement Works at HDB Hub | CONZEPT DESIGN | S$206,675 |
| 2 Mar 2023 | FIRE INSURANCE COVERAGE FOR HDB PROPERTIES FOR THE PERIOD 1 APRIL 2023 TO 31 MARCH 2026 | BOLTTECH INSURANCE BROKERS PTE. LTD. | S$3,600,000 |
| 2 Mar 2023 | Provision of Video Analytics System for Carpark Operations | ST ENGINEERING URBAN SOLUTIONS LTD. | S$2,487,216 |
| 1 Mar 2023 | Appointment of Site Supervisors for Improvement Works at Various HDB Residential Buildings | C@NSPECS PTE. LTD. | S$7,434 |
| 28 Feb 2023 | PART A : BUILDING WORKS AT WOODLANDS NEIGHBOURHOOD 1 CONTRACT 23 & 24 (TOTAL: 1,106 DWELLING UNITS); PART B : CONTINGENCY WORKS | KAY LIM CONSTRUCTION & TRADING PTE LTD | S$289,800,000 |
| 28 Feb 2023 | PROPOSED SEMBAWANG LINK, SEMBAWANG WALK (PART) AND ROAD RELATED FACILITIES | GUAN JOO CONSTRUCTION PTE LTD | S$8,778,900 |
| 21 Feb 2023 | DEMOLITION PROJECT AT PUBLIC HOUSING ESTATE (BATCH 18) | BENG HENG ENGINEERING PTE LTD | S$1,824,000 |
| 21 Feb 2023 | Leasing of Electric Car | GOLDBELL CAR RENTAL PTE. LTD. | S$3,930 |
| 21 Feb 2023 | PROVISION OF UNDERGROUND SERVICES DETECTION FOR PROPOSED DEMOLITION BATCH 20 PROJECT C | HI-TECH ENGINEERING & CONSTRUCTIONS PTE. LTD. | S$49,300 |
| 21 Feb 2023 | APPOINTMENT OF EXTERNAL REVIEWER TO PROVIDE LIMITED ASSURANCE REVIEWS FOR HDB ANNUAL CONSOLIDATED GREEN FINANCE REPORTS | S&P GLOBAL RATINGS SINGAPORE PTE. LTD. | S$70,096 |
| 20 Feb 2023 | ENGAGEMENT OF TECHNICAL PERSONNEL FOR IMPROVEMENT WORKS TO UTILITY CENTRES | C@NSPECS PTE. LTD. | S$5,700 |
| 17 Feb 2023 | PROVISION OF LANDSCAPING SERVICES ON TOPMOST PARKING DECKS OF EXISTING MULTI- STOREY CAR PARKS (MSCP) (BATCH 10) | GARDEN WORKS PTE. LTD. | S$307,142 |
| 17 Feb 2023 | APPOINTMENT OF INDEPENDENT 3RD PARTY ASSESSOR FOR SOLAR PV ASSESSMENT (SOLARNOVA PHASE 7) AT HDB RESIDENTIAL BLOCKS | TUV SUD PSB PTE. LTD. | S$688,888 |
| 17 Feb 2023 | Mechanical and Electrical Cyclical Improvement Works to Multi-Storey Car Parks (Batch 20) | SH INTEGRATED SERVICES PTE. LTD. | S$6,985,315 |
| 15 Feb 2023 | (A) ADDITION AND ALTERATION WORKS TO GEYLANG SERAI MARKET AND JOO CHIAT COMPLEX; (B) CONSTRUCTION OF ICONIC JUNCTION AT GEYLANG | CHIAN TECK REALTY PTE. LTD. | S$5,500,000 |
| 15 Feb 2023 | Improvement Works to Utility Centres | TEAM KS BUILDER PTE. LTD. | S$297,550 |
| 9 Feb 2023 | THE DEVELOPMENT OF STRUCTURAL HEALTH MONITORING SYSTEM (SHM) | Unknown | S$0 |
| 9 Feb 2023 | Supply and Delivery of Fine Aggregates to the HDB Including Stockpiling and Ground Monitoring Works (Batch 76) | Unknown | S$0 |
| 6 Feb 2023 | Electrical Rewiring and Replacement Works in HDB Estates (Project 2) | YL INTEGRATED PTE. LTD. | S$824,350 |
| 6 Feb 2023 | Supply of Fine Aggregates to the HDB (Batch 78) | ORIENT NATURAL RESOURCES PTE. LTD. | S$26 |
| 6 Feb 2023 | Electrical Rewiring and Replacement Works in HDB Estates (Project 1) | PROPELL INTEGRATED PTE LTD | S$756,536 |
| 2 Feb 2023 | Part A : Building Works at Jurong West Neighbourhood 3 Contract 31 and 32 (Total : 1,016 Dwelling Units); Part B : Contingency Works | VICO CONSTRUCTION PTE. LTD. | S$205,700,000 |
| 31 Jan 2023 | PART A: BUILDING WORKS AT WOODLANDS NEIGHBOURHOOD 5 CONTRACT 25 (TOTAL: 630 DWELLING UNITS); PART B: CONTINGENCY WORK | DEENN ENGINEERING PTE LTD | S$141,000,000 |
| 30 Jan 2023 | PART A: BUILDING WORKS AT GEYLANG CONTRACT 50 (TOTAL: 443 DWELLING UNITS); PART B: CONTINGENCY WORKS | QING FENG CONSTRUCTION PTE LTD | S$124,088,000 |
| 30 Jan 2023 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G32A; (B) CONTINGENCY WORKS | KWAN YONG CONSTRUCTION PTE LTD | S$39,000,000 |
| 30 Jan 2023 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G32B; (B) CONTINGENCY WORKS | W'RAY CONSTRUCTION PTE. LTD. | S$29,930,000 |
| 30 Jan 2023 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G32C; (B) CONTINGENCY WORKS | KAY LIM CONSTRUCTION & TRADING PTE LTD | S$37,320,000 |
| 30 Jan 2023 | (A) Design And Build Of Upgrading Projects For G32K; (B) Contingency Works | SCT CONSTRUCTION PTE. LTD. | S$43,795,000 |
| 26 Jan 2023 | INSTRUMENTATION AND MONITORING WORKS FOR (A) SITE PREPARATION WORKS AT TENGAH TOWN (PHASE 3); (B) SITE PREPARATION WORKS AT TENGAH TOWN (PHASE 4); (C) CONSTRUCTION OF OUTLET DRAINS AT TENGAH TOWN (PHASE 1A); (D) CONSTRUCTION OF OUTLET DRAINS AT TENGAH TOWN (PHASE 1B); (E)SITE PREPARATION WORKS AT BUKIT BATOK TOWN (PHASE 5) | GEOAPPLICATION ENGINEERS PTE. LTD. | S$235,097 |
| 18 Jan 2023 | SUPPLY, INSTALLATION & MAINTENANCE OF AUDIO-VISUAL SYSTEM | DIGITAL SOLUTIONS PTE. LTD. | S$243,855 |
| 18 Jan 2023 | INSTRUMENTATION MONITORING SERVICES FOR INFRASTRUCTURE WORKS AT ALEXANDRA (PHASE 2A) | GEOAPPLICATION ENGINEERS PTE. LTD. | S$38,504 |
| 11 Jan 2023 | IMPLEMENTATION OF URBANWATER HARVESTING SYSTEM FOR EXISTING HDB ESTATES | STRATEGIC ENGINEERING & CONSTRUCTION PTE. LTD. | S$11,370,500 |
| 9 Jan 2023 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G32J; (B) CONTINGENCY WORKS | HI-TEK CONSTRUCTION PTE. LTD. | S$43,420,000 |
| 6 Jan 2023 | Provision of Cyber Threat Intelligence & Cybersecurity Forensic Retainer Services | ST ENGINEERING INFO-SECURITY PTE. LTD. | S$5,723 |
| 6 Jan 2023 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G32I; (B) CONTINGENCY WORKS | INCORPORATED BUILDERS PTE LTD | S$37,800,000 |
| 6 Jan 2023 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G32D; (B) CONTINGENCY WORKS | KHIAN HENG CONSTRUCTION (PRIVATE) LIMITED | S$42,600,000 |
| 5 Jan 2023 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G32E; (B) CONTINGENCY WORKS | CHUAN LIM CONSTRUCTION PTE LTD | S$41,649,240 |
| 5 Jan 2023 | TERM CONTRACT FOR PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS (ZONE 5) | CTM FACILITIES MANAGEMENT PTE. LTD. | S$422,930 |
| 5 Jan 2023 | TERM CONTRACT FOR PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS (ZONE 2) | E M SERVICES PRIVATE LIMITED | S$571,457 |
| 5 Jan 2023 | (A) Design & Build of Upgrading Projects for G32G; (B) Contingency Works | PROGRESSIVE BUILDERS PRIVATE LIMITED | S$36,380,000 |
| 5 Jan 2023 | TERM CONTRACT FOR PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS (ZONE 4) | E M SERVICES PRIVATE LIMITED | S$571,467 |
| 5 Jan 2023 | TERM CONTRACT FOR PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS (ZONE 3) | CTM FACILITIES MANAGEMENT PTE. LTD. | S$420,206 |
| 4 Jan 2023 | TERM CONTRACT FOR PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS (ZONE 1) | DIGO CORPORATION PTE. LTD. | S$394,199 |
| 4 Jan 2023 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G32H; (B) CONTINGENCY WORKS | FUJIAN CHENGJIAN CONSTRUCTION CORPORATION LIMITED (Singapore Branch) | S$34,180,000 |
| 3 Jan 2023 | SPECIALIST CONSULTANCY SERVICES AT HDB DEVELOPMENT (EASTERN) | SINGAPORE ENVIRONMENTAL CONSULTANCY AND SOLUTIONS PTE. LTD. | S$1,579,000 |
| 30 Dec 2022 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G32F; (B) CONTINGENCY WORKS | GUAN HO CONSTRUCTION CO (PTE) LTD | S$37,880,000 |
| 30 Dec 2022 | Part A: Building Works at Tampines Neighbourhood 4 Contract 29 (Total : 267 Dwelling Units); Part B: Contingency Works | L.S. CONSTRUCTION PTE LTD | S$78,000,000 |
| 27 Dec 2022 | Term Contract of Building Inspector Services for Building Works | WSH EXPERTS PTE. LTD. | S$60 |
| 25 Dec 2022 | Provision of Management And Maintenance Services For Storey Shelters (Year 2022 to 2025) | PEAK ENGINEERING & CONSULTANCY PTE. LTD. | S$5,022 |
| 21 Dec 2022 | PART A: BUILDING WORKS AT CHOA CHU KANG NEIGHBOURHOOD 6 CONTRACT 5A (TOTAL: 68 DWELLING UNITS) WITH POLYCLINIC, KIDNEY DIALYSIS CENTRE, COMMUNITY CLUB AND HAWKER CENTRE; PART B: CONTINGENCY WORKS | HEXACON CONSTRUCTION PTE LTD | S$130,425,000 |
| 21 Dec 2022 | Supply of Fine Aggregates to the HDB (Batch 77) | ORIENT NATURAL RESOURCES PTE. LTD. | S$27 |
| 20 Dec 2022 | Term Contract for the Supply and Installation of Radio Frequency Identification (RFID) Tags for HDB Car Park Signboards for a period of 3 years | SMARTSTRIPE MARKETING PTE LTD | S$8 |
| 16 Dec 2022 | ENGAGEMENT OF UNMANNED AIRCRAFT SERVICE PROVIDER WITH COMPETENT PERSON TO CARRY OUT PERIODIC FACADE INSPECTION (PFI) | ARUP SINGAPORE PRIVATE LIMITED | S$123,900 |
| 15 Dec 2022 | INSTRUMENTATION AND MONITORING WORKS FOR INFRASTRUCTURE WORKS AT TELOK BLANGAH | ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | S$1,389,895 |
| 15 Dec 2022 | INFRASTRUCTURE WORKS NEAR OLD AIRPORT ROAD | HONSEI BUILDER PTE. LTD. | S$6,668,000 |
| 9 Dec 2022 | MAINTENANCE OF A FRONT COUNTER FINANCIAL RECEIPTING SYSTEM | I-MAGINATION SOLUTION PTE. LTD. | S$934,170 |
| 9 Dec 2022 | TERM CONTRACT FOR PROVISION OF SERVICES FOR LABORATORY TESTING, OPERATION AND MAINTENANCE AT HDB ENGINEERING MATERIALS LABORATORY (BATCH 7) | YS YONG SERVICES PTE LTD | S$21,440 |
| 9 Dec 2022 | RENEWAL OF BIM REMOTE ACCESS SOFTWARE LICENSES & MAINTENANCE SUPPORT | LOGICALIS SINGAPORE PTE. LTD. | S$78,829 |
| 9 Dec 2022 | Specialist Consultancy Services for Environmental Study for Proposed Development | DHI WATER & ENVIRONMENT (S) PTE. LTD. | S$3,688,888 |
| 9 Dec 2022 | INSTRUMENTATION AND MONITORING WORKS (AUTOMATED TUNNEL MONITORING SYSTEM) FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT WOODLANDS NEIGHBOURHOOD 5 CONTRACT 25 | RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | S$967,691 |
| 1 Dec 2022 | DEVELOPMENT OF PLATFORM & TOOLS TO FACILITATE INTEGRATED DIGITAL DELIVERY (IDD) | LEAPTHOUGHT ASIA PTE. LTD. | S$2,800,000 |
| 30 Nov 2022 | Supply Of Ordinary Portland Cement To The HDB (Batch 48) | ENGRO CORPORATION LIMITED | S$107 |
| 30 Nov 2022 | PROPOSED DEMOLITION OF EXISTING BUILDINGS AND ANCILLARY STRUCTURES AT 7 JALAN TIGA RATUS | NEO & GOH CONSTRUCTION PTE LTD | S$1,390,000 |
| 30 Nov 2022 | PROPOSED HDB UPGRADING PROJECTS UNDER REMAKING OUR HEARTLAND AT TOA PAYOH TOWN CENTRE | SHIN KHAI CONSTRUCTION PTE. LTD. | S$8,595,000 |
| 30 Nov 2022 | PART A: BUILDING WORKS AT PROJECT L AND PARK; PART B: CONTINGENCY WORKS | LBD ENGINEERING PTE. LTD. | S$223,000,000 |
| 30 Nov 2022 | Part A: Building Works at Bukit Merah Contract 58 (Total : 1.669 Dwelling Units); Part B: Contingency Works | RICH CONSTRUCTION COMPANY PTE. LTD. | S$443,393,000 |
| 30 Nov 2022 | PART A: BUILDING WORKS AT GHIM MOH CONTRACT 8-8A (TOTAL: 867 DWELLING UNITS); PART B: CONTINGENCY WORKS | CHIU TENG CONSTRUCTION CO. PTE. LTD. | S$203,240,000 |
| 30 Nov 2022 | PART A: BUILDING WORKS AT YISHUN NEIGHBOURHOOD 9 CONTRACT 3 (TOTAL: 646 DWELLING UNITS); PART B: CONTINGENCY WORKS | DEBENHO PTE LTD | S$166,980,090 |
| 30 Nov 2022 | PART A: BUILDING WORKS AT TOA PAYOH NEIGHBOURHOOD 1 CONTRACT 27 WITH COMMUNITY CLUB (TOTAL: 404 DWELLING UNITS) PART B: CONTINGENCY WORKS | SB PROCUREMENT PTE. LTD. | S$128,000,000 |
| 30 Nov 2022 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G31A; (B) CONTINGENCY WORKS | TEAMBUILD ENGINEERING & CONSTRUCTION PTE. LTD. | S$21,720,000 |
| 28 Nov 2022 | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G31B; (B) CONTINGENCY WORKS | KIENTA ENGINEERING CONSTRUCTION PTE. LTD. | S$24,960,000 |
| 17 Nov 2022 | ACCREDITED CHECKING SERVICES FOR EARTHWORKS AT YISHUN PROJECT 2 | ECAS CONSULTANTS PTE. LTD. | S$65,000 |
| 17 Nov 2022 | SPECIALIST ACCREDITED CHECKING SERVICES FOR EARTHWORKS AT YISHUN PROJECT 2 | TERS CONSULTING PTE. LTD. | S$76,160 |
| 16 Nov 2022 | Term Contract for Comprehensive Maintenance of HDB Mechanised Parking Systems and Building Facilities (Year 2022 to Year 2030) | Unknown | S$0 |
| 14 Nov 2022 | Multi-Disciplinary (Civil & Structural Engineering & Quantity Surveying) Consultancy Services for Various Demolition Projects (Batch 23) | EXECUTIVE DECISIONS INC. LLP | S$108,000 |
| 11 Nov 2022 | Supply and Installation of Lift Surveillance System in Multi-Storey Car Parks | IFOCUS PTE LTD | S$237,450 |
| 8 Nov 2022 | IMPROVEMENT WORKS TO SURFACE CAR PARKS (BATCH 84) | NEWCON BUILDERS PTE. LTD. | S$15,380,000 |
| 7 Nov 2022 | Specialist Consultancy Services at HDB Development (South) | TEMBUSU ASIA CONSULTING PTE. LTD. | S$1,560,000 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | C H LIM CONSULTANTS | S$9,158 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | BMS ENGINEERS PTE LTD | S$9,158 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | ARCHIVISION ARCHITECTS | S$13,292 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | DESIGN GROUP INC. ARCHITECTS | S$13,292 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | FOCUS ARCHITECTS | S$13,292 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | LBS ENGINEERING CONSULTANTS | S$13,292 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | CALVARY PROJECTS & CONSULTANCY | S$9,158 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | KBS ENGINEERING SERVICES | S$9,158 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | TAN HENG WEE REGISTERED INSPECTOR | S$9,158 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | VINCENT, HAN & ASSOCIATES | S$9,158 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | ENKON INTERNATIONAL CONSULTING ENGINEERS PTE LTD | S$9,158 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | KSEVEN ENGINEERING AND TECHNICAL SERVICES | S$9,158 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | ONG & ONG PTE. LTD. | S$13,292 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | KTB ARCHITECTS | S$13,292 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | LCA PRIVATE LIMITED | S$13,292 |
| 7 Nov 2022 | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 6) | SD ARCHITECTS & ASSOCIATES PTE. LTD. | S$13,292 |
| 3 Nov 2022 | TERM CONTRACT FOR VECTOR CONTROL SERVICES TO HDB DEVELOPMENT SITES FOR A PERIOD OF TWENTY-SIX MONTHS | AZANTZ SERVICES PTE. LTD. | S$1,200 |
| 2 Nov 2022 | SPECIALIST PROFESSIONAL ENGINEERING (GEOTECHNICAL) CONSULTANCY SERVICES FOR QUEENSWAY CONTRACT 2 | TERS CONSULTING PTE. LTD. | S$48,500 |
| 1 Nov 2022 | SPECIALIST PROFESSIONAL ENGINEERING (GEOTECHNICAL) CONSULTANCY SERVICES FOR ANG MO KIO NEIGHBOURHOOD 7 CONTRACT 30 | GEOALLIANCE CONSULTANTS PTE. LTD. | S$45,000 |
| 28 Oct 2022 | Addition and Alteration Works to Car Parks (C9) | SAMCO CIVIL ENGINEERING PTE. LTD. | S$5,138,000 |
| 26 Oct 2022 | SPECIALIST ACCREDITED CHECKING SERVICES FOR BUILDING WORKS AT BUKIT MERAH CONTRACT 51 | GEOALLIANCE CONSULTANTS PTE. LTD. | S$50,000 |
| 25 Oct 2022 | Watermain Diversion at Woodlands Square | WLK ENGINEERING PTE. LTD. | S$700,500 |
| 17 Oct 2022 | Accredited Checking Services for Building Works at Project J | ECAS CONSULTANTS PTE. LTD. | S$98,000 |
| 17 Oct 2022 | Balance Of Works for: Project 1: Construction Of Woodlands Square, North Woodlands Drive And North Woodlands Way; Project 2: (A) Widening Of Roadside Drain Along Marsiling Road; (B) Construction Of Covered Linkways At Woodlands Street 13; (C) Road Signs At Woodlands Avenue 6, 7, 9 And Gambas Avenue | JUPITER BUILDER PTE. LTD. | S$11,200,000 |
| 12 Oct 2022 | THIRTY-THIRD TERM CONTRACT FOR THE SUPPLY, DELIVERY, INSTALLATION AND MAINTENANCE OF LIFTS FOR THREE-YEAR PERIOD | FUJITEC SINGAPORE CORPORATION LTD | S$9,219,656 |
| 11 Oct 2022 | Consultancy Services For Review and Compilation of HDB's Standard Schedule of Rates | Unknown | S$0 |
| 11 Oct 2022 | ADDITION AND ALTERATIONS WORKS AT PROJECT AL | SH INTEGRATED SERVICES PTE. LTD. | S$6,427,187 |
| 10 Oct 2022 | Earthworks at Woodlands (Contract 1) | CHUAN LIM CONSTRUCTION PTE LTD | S$17,500,000 |
| 10 Oct 2022 | Supply of 20MM Aggregate to the HDB (Batch 84) | SAMWOH RESOURCES PTE LTD | S$21 |
| 5 Oct 2022 | PROPOSED DRAINAGE WORKS AT BUKIT BATOK NEIGHBOURHOOD 4 CONTRACT 5 TO 7 | PACT BUILDERS PTE. LTD. | S$924,013 |
| 30 Sept 2022 | PROJECT 1: PROPOSED HDB UPGRADING PROJECTS UNDER REMAKING OUR HEARTLAND (ROH) AT TOA PAYOH SOCIAL LINKWAYS 1 TO 4; PROJECT 2: PROPOSED HDB UPGRADING PROJECTS UNDER ROH AT TOA PAYOH SOCIAL LINKWAYS 5 TO 8; PROJECT 3: PROPOSED HDB UPGRADING PROJECTS UNDER ROH AT WOODLANDS N2 NEIGHBOURHOOD CENTRE AND SHOP FRONT; PROJECT 4: PROPOSED HDB UPGRADING PROJECTS UNDER ROH AT WOODLANDS N3 NEIGHBOURHOOD CENTRE; PROJECT 5: PROPOSED HDB UPGRADING PROJECTS UNDER ROH AT TOA PAYOH N1 NEIGHBOURHOOD CENTRE | CHIONG CONSTRUCTION PTE. LTD. | S$8,990,900 |
| 29 Sept 2022 | Demolition Works for HDB Residential Blocks - Batch 17 Parcel 1 | SHENGJIE ENGINEERING PTE. LTD. | S$800,000 |
| 28 Sept 2022 | Sewer Diversion in Ang Mo Kio Central 3 & Ang Mo Kio Avenue 8 | HUNG YAO SHENG ENGINEERING PTE. LTD. | S$2,088,800 |
| 27 Sept 2022 | Specialist Consultancy Services at HDB Development (Central) | GOLDER ASSOCIATES (SINGAPORE) PTE. LTD. | S$3,066,400 |
| 26 Sept 2022 | TERM CONTRACT FOR THE (PART I) PRODUCTION, SUPPLY AND DELIVERY OF SPIRAL CONNECTOR SYSTEM; AND (PART II) DISTRIBUTORSHIP OF SPIRAL CONNECTOR SYSTEM | BRC ASIA LIMITED | S$4,904,600 |
| 23 Sept 2022 | Solar Leasing of Grid-Tied Solar Photovoltaic System (SolarNova Phase 7) - 75 MWp | SEMBCORP SOLAR SINGAPORE PTE. LTD. | S$0 |
| 23 Sept 2022 | Multi-Disciplinary (Civil & Structural Engineering and Quantity Surveying) Consultancy Services for Various Demolition Projects (Batch 21) | ANG & ONG CONSULTANTS PTE. LTD. | S$333,000 |
| 22 Sept 2022 | (A) SITE PREPARATION WORKS AT TENGAH TOWN (PHASE 3); (B) SITE PREPARATION WORKS AT TENGAH TOWN (PHASE 4); (C) CONSTRUCTION OF OUTLET DRAINS AT TENGAH TOWN (PHASE 1A); (D) CONSTRUCTION OF OUTLET DRAINS AT TENGAH TOWN (PHASE 1B); (E) SITE PREPARATION WORKS AT BUKIT BATOK TOWN (PHASE 5) | KTC CIVIL ENGINEERING & CONSTRUCTION PTE LTD | S$42,700,000 |
| 21 Sept 2022 | TERM CONTRACT FOR MAINTENANCE OF SIGNALISED PEDESTRAIN CROSSINGS IN HDB ESTATES FOR THE PERIOD FROM 1 OCT 2022 TO 30 SEP 2025 | ENG HUP ENGINEERING PTE LTD | S$200 |
| 16 Sept 2022 | Improvement Works at St George's Tower (Kallang Whampoa C21) | GRAND ELITE TECHNOLOGY (S) PTE. LTD. | S$1,630 |
| 14 Sept 2022 | PROVISION OF SECURITY MONITORING SERVICES AND MAINTENANCE OF SECURITY ALARM SYSTEM AT HDB BRANCHES (YEAR 2022) | ADEMCO (FAR EAST) PTE LTD | S$11,250 |
| 14 Sept 2022 | Development of Smart Lighting Platform | SURBANA TECHNOLOGIES PTE. LTD. | S$2,482,000 |
| 13 Sept 2022 | SUBSCRIPTION OF ENTERPRISE WEB ANALYTICS SOFTWARE | FIFTY-FIVE DATA SINGAPORE PTE. LTD. | S$483,590 |
| 9 Sept 2022 | Earthworks At Yishun Project 2 | SHUAN HUAT TRACTOR SERVICES PTE. LTD. | S$26,985,000 |
| 5 Sept 2022 | MULTI-DISCIPLINARY (CIVIL & STRUCTURAL ENGINEERING AND QUANTITY SURVEYING) CONSULTANCY SERVICES FOR DEMOLITION PROJECT AT PUBLIC HOUSING ESTATE (BATCH 22) | OGP KONSULT PTE. LTD. | S$106,000 |
| 5 Sept 2022 | (A) Construction of Bus Shelters at Tengah Town (Phase 2); (B) Construction of Staggered Mid-Block Pedestrian Crossing at Tengah Town (Phase 2) | PRECISE DEVELOPMENT PTE. LTD. | S$1,988,000 |
| 1 Sept 2022 | Mechanical and Electrical Cyclical Improvement Works to Multi-Storey Car Parks (Batch 20) | Unknown | S$0 |
| 31 Aug 2022 | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT WOODLANDS N2 C19A & C19B | ENVAC SINGAPORE PTE. LTD. | S$3,383,000 |